{"title":"旧住宅楼的重建为何如此复杂?对越南城市地区的研究","authors":"Minh Van Nguyen, Khanh Duy Ha, Chien Thanh Phan","doi":"10.1108/ecam-03-2024-0300","DOIUrl":null,"url":null,"abstract":"<h3>Purpose</h3>\n<p>Reconstruction of old buildings is often necessary after prolonged usage, but these projects encounter various complexities, leading to their failure. However, there is a lack of studies that focus on investigating the complexity of old building reconstruction initiatives. Thus, this study aims to examine the complexity of reconstruction projects for old buildings in Vietnamese urban areas.</p><!--/ Abstract__block -->\n<h3>Design/methodology/approach</h3>\n<p>Through a literature review and discussions with experienced practitioners, 12 significant complexity factors were identified. The study then utilized the fuzzy decision-making trial and evaluation laboratory (DEMATEL) technique to analyze the interrelationships among these complexity factors.</p><!--/ Abstract__block -->\n<h3>Findings</h3>\n<p>The findings revealed intricate interdependencies among the complexity factors, visualized in a complexity map. The map highlighted the critical complexities of site compensation, clearance and the long project duration. Furthermore, a causal diagram categorized the complexity factors into net-effect and net-cause groups.</p><!--/ Abstract__block -->\n<h3>Originality/value</h3>\n<p>By examining the relationships and interactions among these factors, the study emphasizes the interconnected nature of complex systems and the influence of one factor on others. Therefore, decision-makers and stakeholders involved in reconstructing old buildings are suggested to possess a comprehensive understanding of these interdependencies to ensure effective decision-making.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"22 1","pages":""},"PeriodicalIF":3.6000,"publicationDate":"2024-09-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"What makes the reconstruction of old residential buildings complex? A study in Vietnamese urban areas\",\"authors\":\"Minh Van Nguyen, Khanh Duy Ha, Chien Thanh Phan\",\"doi\":\"10.1108/ecam-03-2024-0300\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<h3>Purpose</h3>\\n<p>Reconstruction of old buildings is often necessary after prolonged usage, but these projects encounter various complexities, leading to their failure. However, there is a lack of studies that focus on investigating the complexity of old building reconstruction initiatives. Thus, this study aims to examine the complexity of reconstruction projects for old buildings in Vietnamese urban areas.</p><!--/ Abstract__block -->\\n<h3>Design/methodology/approach</h3>\\n<p>Through a literature review and discussions with experienced practitioners, 12 significant complexity factors were identified. The study then utilized the fuzzy decision-making trial and evaluation laboratory (DEMATEL) technique to analyze the interrelationships among these complexity factors.</p><!--/ Abstract__block -->\\n<h3>Findings</h3>\\n<p>The findings revealed intricate interdependencies among the complexity factors, visualized in a complexity map. The map highlighted the critical complexities of site compensation, clearance and the long project duration. Furthermore, a causal diagram categorized the complexity factors into net-effect and net-cause groups.</p><!--/ Abstract__block -->\\n<h3>Originality/value</h3>\\n<p>By examining the relationships and interactions among these factors, the study emphasizes the interconnected nature of complex systems and the influence of one factor on others. Therefore, decision-makers and stakeholders involved in reconstructing old buildings are suggested to possess a comprehensive understanding of these interdependencies to ensure effective decision-making.</p><!--/ Abstract__block -->\",\"PeriodicalId\":11888,\"journal\":{\"name\":\"Engineering, Construction and Architectural Management\",\"volume\":\"22 1\",\"pages\":\"\"},\"PeriodicalIF\":3.6000,\"publicationDate\":\"2024-09-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Engineering, Construction and Architectural Management\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1108/ecam-03-2024-0300\",\"RegionNum\":2,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering, Construction and Architectural Management","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1108/ecam-03-2024-0300","RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

摘要

目的旧楼在长期使用后往往需要重建,但这些项目会遇到各种复杂问题,导致失败。然而,目前还缺乏对旧建筑重建项目复杂性的研究。因此,本研究旨在考察越南城市地区旧建筑重建项目的复杂性。设计/方法/途径通过文献综述和与经验丰富的从业人员讨论,确定了 12 个重要的复杂性因素。然后,研究利用模糊决策试验和评估实验室(DEMATEL)技术分析了这些复杂性因素之间的相互关系。研究结果研究结果表明,复杂性因素之间存在错综复杂的相互依存关系,并以复杂性地图的形式直观呈现。该图强调了场地补偿、清理和项目工期长等关键复杂因素。原创性/价值通过研究这些因素之间的关系和相互作用,本研究强调了复杂系统的相互关联性以及一个因素对其他因素的影响。因此,建议参与旧楼重建的决策者和利益相关者全面了解这些相互依存关系,以确保有效决策。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
What makes the reconstruction of old residential buildings complex? A study in Vietnamese urban areas

Purpose

Reconstruction of old buildings is often necessary after prolonged usage, but these projects encounter various complexities, leading to their failure. However, there is a lack of studies that focus on investigating the complexity of old building reconstruction initiatives. Thus, this study aims to examine the complexity of reconstruction projects for old buildings in Vietnamese urban areas.

Design/methodology/approach

Through a literature review and discussions with experienced practitioners, 12 significant complexity factors were identified. The study then utilized the fuzzy decision-making trial and evaluation laboratory (DEMATEL) technique to analyze the interrelationships among these complexity factors.

Findings

The findings revealed intricate interdependencies among the complexity factors, visualized in a complexity map. The map highlighted the critical complexities of site compensation, clearance and the long project duration. Furthermore, a causal diagram categorized the complexity factors into net-effect and net-cause groups.

Originality/value

By examining the relationships and interactions among these factors, the study emphasizes the interconnected nature of complex systems and the influence of one factor on others. Therefore, decision-makers and stakeholders involved in reconstructing old buildings are suggested to possess a comprehensive understanding of these interdependencies to ensure effective decision-making.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Engineering, Construction and Architectural Management
Engineering, Construction and Architectural Management Business, Management and Accounting-General Business,Management and Accounting
CiteScore
8.10
自引率
19.50%
发文量
226
期刊介绍: ECAM publishes original peer-reviewed research papers, case studies, technical notes, book reviews, features, discussions and other contemporary articles that advance research and practice in engineering, construction and architectural management. In particular, ECAM seeks to advance integrated design and construction practices, project lifecycle management, and sustainable construction. The journal’s scope covers all aspects of architectural design, design management, construction/project management, engineering management of major infrastructure projects, and the operation and management of constructed facilities. ECAM also addresses the technological, process, economic/business, environmental/sustainability, political, and social/human developments that influence the construction project delivery process. ECAM strives to establish strong theoretical and empirical debates in the above areas of engineering, architecture, and construction research. Papers should be heavily integrated with the existing and current body of knowledge within the field and develop explicit and novel contributions. Acknowledging the global character of the field, we welcome papers on regional studies but encourage authors to position the work within the broader international context by reviewing and comparing findings from their regional study with studies conducted in other regions or countries whenever possible.
期刊最新文献
Production-oriented approach for optimal mass-customisation of floor panel layouts in cross-laminated timber (CLT) buildings A decision-support system for choosing between traditional and alternative project delivery methods for bundled projects Traversing the complexity of digital construction and beyond through soft skills: experiences of Malaysian architects Blockchain-enhanced computer vision approach for remote safety inspection in construction A novel approach for integrating BIM and green building rating systems in the construction projects design phase
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1