参数保险(PI)在台湾省节能合约(ESPC)应用之问题:简况

IF 3.2 4区 工程技术 Q3 ENERGY & FUELS Energy Efficiency Pub Date : 2025-01-16 DOI:10.1007/s12053-025-10297-2
Yu-Sen Chuang, Hwa-Lin Chang
{"title":"参数保险(PI)在台湾省节能合约(ESPC)应用之问题:简况","authors":"Yu-Sen Chuang,&nbsp;Hwa-Lin Chang","doi":"10.1007/s12053-025-10297-2","DOIUrl":null,"url":null,"abstract":"<div><p>Although the energy service company (ESCO) in Taiwan can apply traditional insurance to its energy-service performance contract (ESPC) business, can it apply parametric insurance (PI)? This is an issue worth studying. In the ESPC, there is a “guaranteed” energy-saving performance value by the ESCO. Since this energy-saving performance value is a “parameter” agreed upon by both the energy user and the ESCO, the ESCO should be liable for the “fixed amount compensation” for the “shortfall” loss due to failure to meet the “parameters”. The “fixed amount compensation” liability ESCO should bear is the object of parametric insurance. Therefore, this study attempted to explore the application issues related to using this parameter as a triggering factor for PI. How the “fixed amount compensation” should be calculated is not the subject of this study.</p></div>","PeriodicalId":537,"journal":{"name":"Energy Efficiency","volume":"18 1","pages":""},"PeriodicalIF":3.2000,"publicationDate":"2025-01-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Issues of using parametric insurance (PI) to Taiwan energy-saving performance contract (ESPC): A snapshot\",\"authors\":\"Yu-Sen Chuang,&nbsp;Hwa-Lin Chang\",\"doi\":\"10.1007/s12053-025-10297-2\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>Although the energy service company (ESCO) in Taiwan can apply traditional insurance to its energy-service performance contract (ESPC) business, can it apply parametric insurance (PI)? This is an issue worth studying. In the ESPC, there is a “guaranteed” energy-saving performance value by the ESCO. Since this energy-saving performance value is a “parameter” agreed upon by both the energy user and the ESCO, the ESCO should be liable for the “fixed amount compensation” for the “shortfall” loss due to failure to meet the “parameters”. The “fixed amount compensation” liability ESCO should bear is the object of parametric insurance. Therefore, this study attempted to explore the application issues related to using this parameter as a triggering factor for PI. How the “fixed amount compensation” should be calculated is not the subject of this study.</p></div>\",\"PeriodicalId\":537,\"journal\":{\"name\":\"Energy Efficiency\",\"volume\":\"18 1\",\"pages\":\"\"},\"PeriodicalIF\":3.2000,\"publicationDate\":\"2025-01-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Energy Efficiency\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://link.springer.com/article/10.1007/s12053-025-10297-2\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENERGY & FUELS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Energy Efficiency","FirstCategoryId":"5","ListUrlMain":"https://link.springer.com/article/10.1007/s12053-025-10297-2","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
引用次数: 0

摘要

摘要台湾能源服务公司(ESCO)可以将传统保险应用于其能源服务履约合约(ESPC)业务,但是否可以应用参数保险(PI)?这是一个值得研究的问题。在ESPC中,ESCO有一个“保证”的节能性能值。由于该节能性能值是能源用户和ESCO双方商定的“参数”,因此ESCO应对因未达到“参数”而造成的“不足”损失承担“定额补偿”责任。ESCO应承担的“定额赔偿”责任是参数保险的对象。因此,本研究试图探讨使用该参数作为PI触发因子的应用问题。如何计算“定额补偿”不是本研究的主题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Issues of using parametric insurance (PI) to Taiwan energy-saving performance contract (ESPC): A snapshot

Although the energy service company (ESCO) in Taiwan can apply traditional insurance to its energy-service performance contract (ESPC) business, can it apply parametric insurance (PI)? This is an issue worth studying. In the ESPC, there is a “guaranteed” energy-saving performance value by the ESCO. Since this energy-saving performance value is a “parameter” agreed upon by both the energy user and the ESCO, the ESCO should be liable for the “fixed amount compensation” for the “shortfall” loss due to failure to meet the “parameters”. The “fixed amount compensation” liability ESCO should bear is the object of parametric insurance. Therefore, this study attempted to explore the application issues related to using this parameter as a triggering factor for PI. How the “fixed amount compensation” should be calculated is not the subject of this study.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Energy Efficiency
Energy Efficiency ENERGY & FUELS-ENERGY & FUELS
CiteScore
5.80
自引率
6.50%
发文量
59
审稿时长
>12 weeks
期刊介绍: The journal Energy Efficiency covers wide-ranging aspects of energy efficiency in the residential, tertiary, industrial and transport sectors. Coverage includes a number of different topics and disciplines including energy efficiency policies at local, regional, national and international levels; long term impact of energy efficiency; technologies to improve energy efficiency; consumer behavior and the dynamics of consumption; socio-economic impacts of energy efficiency measures; energy efficiency as a virtual utility; transportation issues; building issues; energy management systems and energy services; energy planning and risk assessment; energy efficiency in developing countries and economies in transition; non-energy benefits of energy efficiency and opportunities for policy integration; energy education and training, and emerging technologies. See Aims and Scope for more details.
期刊最新文献
Household heterogeneity in valuation of heating energy costs A multicriteria framework for assessing energy audit software for low-income households in the United States Consumers' intention to adopt energy-efficient appliances: integrating technology acceptance model and theory of planned behaviour Support measures for Austrian households in the energy crisis: an analysis of social effectiveness and implications for energy efficiency Which promotion policy can drive people to install residential rooftop PV systems? -An empirical study based on TAM model
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1