IF 7.4 1区 工程技术 Q1 CONSTRUCTION & BUILDING TECHNOLOGY Tunnelling and Underground Space Technology Pub Date : 2025-04-01 Epub Date: 2025-01-25 DOI:10.1016/j.tust.2025.106421
Xiangsheng Chen , Qiufeng He , Jinshan Qiu , Lei Wang , Dong Su , Meilin Liu , Kunyang Chen , Tong Qiu
{"title":"地铁与综合隧道的同步建设:以深圳为例","authors":"Xiangsheng Chen ,&nbsp;Qiufeng He ,&nbsp;Jinshan Qiu ,&nbsp;Lei Wang ,&nbsp;Dong Su ,&nbsp;Meilin Liu ,&nbsp;Kunyang Chen ,&nbsp;Tong Qiu","doi":"10.1016/j.tust.2025.106421","DOIUrl":null,"url":null,"abstract":"<div><div>The increasing urban building density has driven the utilisation of underground space for constructing urban municipal infrastructure and transportation systems, alleviating land scarcity. However, the construction of underground projects within densely populated cities poses challenges such as traffic congestion, secondary excavations, and settlement of adjacent building foundations. Accordingly, the simultaneous construction of subways and utility tunnels (SCSUT) has emerged as a practical solution for developing underground spaces in high-density areas. By integrating the constructions of urban rail transit and municipal infrastructure from a long-term perspective, SCSUT could reduce road occupancy and minimize impacts on existing structures. Despite its advantages, SCSUT implementation remains challenging, with few practical cases available. To gain insight into the SCSUT, this study first examines its necessity and global implementation status. Meanwhile, this research identifies the existing implementation strategies of the SCSUT in terms of construction management, pipeline layout, and typical construction schemes. Furthermore, an in-depth analysis of the largest existing SCSUT project is conducted. Findings indicate that the SCSUT, currently in its early development stage, faces several critical challenges, including the lack of technical standards, complex approval processes and management models, inadequate geological surveys and preliminary planning, and frequent design changes. To realize the significant potential benefits of the SCSUT, future efforts should focus on developing technical standards based on relevant engineering cases, enhancing early-stage planning, and leveraging digital technologies to support construction. This study is anticipated to be a valuable reference for policy improvement and other SCSUT projects similar to the case study.</div></div>","PeriodicalId":49414,"journal":{"name":"Tunnelling and Underground Space Technology","volume":"158 ","pages":"Article 106421"},"PeriodicalIF":7.4000,"publicationDate":"2025-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Simultaneous construction of subways and utility tunnels: A case project in Shenzhen, China\",\"authors\":\"Xiangsheng Chen ,&nbsp;Qiufeng He ,&nbsp;Jinshan Qiu ,&nbsp;Lei Wang ,&nbsp;Dong Su ,&nbsp;Meilin Liu ,&nbsp;Kunyang Chen ,&nbsp;Tong Qiu\",\"doi\":\"10.1016/j.tust.2025.106421\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><div>The increasing urban building density has driven the utilisation of underground space for constructing urban municipal infrastructure and transportation systems, alleviating land scarcity. However, the construction of underground projects within densely populated cities poses challenges such as traffic congestion, secondary excavations, and settlement of adjacent building foundations. Accordingly, the simultaneous construction of subways and utility tunnels (SCSUT) has emerged as a practical solution for developing underground spaces in high-density areas. By integrating the constructions of urban rail transit and municipal infrastructure from a long-term perspective, SCSUT could reduce road occupancy and minimize impacts on existing structures. Despite its advantages, SCSUT implementation remains challenging, with few practical cases available. To gain insight into the SCSUT, this study first examines its necessity and global implementation status. Meanwhile, this research identifies the existing implementation strategies of the SCSUT in terms of construction management, pipeline layout, and typical construction schemes. Furthermore, an in-depth analysis of the largest existing SCSUT project is conducted. Findings indicate that the SCSUT, currently in its early development stage, faces several critical challenges, including the lack of technical standards, complex approval processes and management models, inadequate geological surveys and preliminary planning, and frequent design changes. To realize the significant potential benefits of the SCSUT, future efforts should focus on developing technical standards based on relevant engineering cases, enhancing early-stage planning, and leveraging digital technologies to support construction. This study is anticipated to be a valuable reference for policy improvement and other SCSUT projects similar to the case study.</div></div>\",\"PeriodicalId\":49414,\"journal\":{\"name\":\"Tunnelling and Underground Space Technology\",\"volume\":\"158 \",\"pages\":\"Article 106421\"},\"PeriodicalIF\":7.4000,\"publicationDate\":\"2025-04-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Tunnelling and Underground Space Technology\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S0886779825000598\",\"RegionNum\":1,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"2025/1/25 0:00:00\",\"PubModel\":\"Epub\",\"JCR\":\"Q1\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Tunnelling and Underground Space Technology","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0886779825000598","RegionNum":1,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"2025/1/25 0:00:00","PubModel":"Epub","JCR":"Q1","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

摘要

随着城市建筑密度的增加,地下空间被用于城市市政基础设施和交通系统的建设,缓解了土地短缺的问题。然而,在人口密集的城市中,地下工程的建设面临着交通拥堵、二次挖掘和相邻建筑物基础沉降等挑战。因此,同时建设地铁和公用隧道(SCSUT)已成为开发高密度地区地下空间的实用解决方案。从长远的角度出发,将城市轨道交通建设与市政基础设施建设相结合,可以减少道路占用,最大限度地减少对现有结构的影响。尽管SCSUT具有优势,但其实施仍然具有挑战性,很少有实际案例可用。为了深入了解SCSUT,本研究首先考察了其必要性和全球实施状况。同时,本研究从施工管理、管道布置、典型施工方案等方面,梳理了SCSUT现有的实施策略。此外,对现有最大的SCSUT项目进行了深入分析。研究结果表明,SCSUT目前处于早期发展阶段,面临着技术标准缺乏、审批流程和管理模式复杂、地质调查和初步规划不充分、设计变更频繁等严峻挑战。为了实现SCSUT的巨大潜在效益,未来的工作应侧重于根据相关工程案例制定技术标准,加强早期规划,并利用数字技术支持建设。这项研究预计将成为政策改进和其他类似案例研究的SCSUT项目的宝贵参考。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Simultaneous construction of subways and utility tunnels: A case project in Shenzhen, China
The increasing urban building density has driven the utilisation of underground space for constructing urban municipal infrastructure and transportation systems, alleviating land scarcity. However, the construction of underground projects within densely populated cities poses challenges such as traffic congestion, secondary excavations, and settlement of adjacent building foundations. Accordingly, the simultaneous construction of subways and utility tunnels (SCSUT) has emerged as a practical solution for developing underground spaces in high-density areas. By integrating the constructions of urban rail transit and municipal infrastructure from a long-term perspective, SCSUT could reduce road occupancy and minimize impacts on existing structures. Despite its advantages, SCSUT implementation remains challenging, with few practical cases available. To gain insight into the SCSUT, this study first examines its necessity and global implementation status. Meanwhile, this research identifies the existing implementation strategies of the SCSUT in terms of construction management, pipeline layout, and typical construction schemes. Furthermore, an in-depth analysis of the largest existing SCSUT project is conducted. Findings indicate that the SCSUT, currently in its early development stage, faces several critical challenges, including the lack of technical standards, complex approval processes and management models, inadequate geological surveys and preliminary planning, and frequent design changes. To realize the significant potential benefits of the SCSUT, future efforts should focus on developing technical standards based on relevant engineering cases, enhancing early-stage planning, and leveraging digital technologies to support construction. This study is anticipated to be a valuable reference for policy improvement and other SCSUT projects similar to the case study.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Tunnelling and Underground Space Technology
Tunnelling and Underground Space Technology 工程技术-工程:土木
CiteScore
11.90
自引率
18.80%
发文量
454
审稿时长
10.8 months
期刊介绍: Tunnelling and Underground Space Technology is an international journal which publishes authoritative articles encompassing the development of innovative uses of underground space and the results of high quality research into improved, more cost-effective techniques for the planning, geo-investigation, design, construction, operation and maintenance of underground and earth-sheltered structures. The journal provides an effective vehicle for the improved worldwide exchange of information on developments in underground technology - and the experience gained from its use - and is strongly committed to publishing papers on the interdisciplinary aspects of creating, planning, and regulating underground space.
期刊最新文献
Real-time full-field reconstruction and prediction of temperature field evolution stimulated by dynamic tunnel fires using a physics-informed neural network (PINN) assisted by online-updated sparse monitoring data Thermo-mechanical damage characteristics and fracture behavior of backfill bodies in thermal energy storage cavities: An experimental and numerical study Study on the TCNN-augmented adaptive smoke control in tunnel fires: theory, technical framework, and numerical demonstration Data-driven creep modeling and long-term performance assessment of FIPP under sustained mechanical loads Investigation on performance-based deformation control criteria for shield tunnel linings under typical adjacent construction disturbances
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1