有在安大略省医院实验室实施质量管理体系的经验。

Daniel K H Ho
{"title":"有在安大略省医院实验室实施质量管理体系的经验。","authors":"Daniel K H Ho","doi":"","DOIUrl":null,"url":null,"abstract":"<p><p>This article describes the process of building and implementing a quality management system in the Department of Laboratory Medicine at St. Michael's Hospital in Toronto. This was done in part to fulfill the requirements of the Ontario Laboratory Accreditation program. During the process, we revised and created new procedure manuals and documents through the use of focus groups and inter-departmental committees. The entire project took approximately two-and-a-half years to complete and required teamwork, personal commitment, and professional sacrifices by key personnel.</p>","PeriodicalId":80950,"journal":{"name":"Clinical leadership & management review : the journal of CLMA","volume":"19 6","pages":"E3"},"PeriodicalIF":0.0000,"publicationDate":"2005-11-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Experience of implementing a quality management system in an Ontario hospital laboratory.\",\"authors\":\"Daniel K H Ho\",\"doi\":\"\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p><p>This article describes the process of building and implementing a quality management system in the Department of Laboratory Medicine at St. Michael's Hospital in Toronto. This was done in part to fulfill the requirements of the Ontario Laboratory Accreditation program. During the process, we revised and created new procedure manuals and documents through the use of focus groups and inter-departmental committees. The entire project took approximately two-and-a-half years to complete and required teamwork, personal commitment, and professional sacrifices by key personnel.</p>\",\"PeriodicalId\":80950,\"journal\":{\"name\":\"Clinical leadership & management review : the journal of CLMA\",\"volume\":\"19 6\",\"pages\":\"E3\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2005-11-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Clinical leadership & management review : the journal of CLMA\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Clinical leadership & management review : the journal of CLMA","FirstCategoryId":"1085","ListUrlMain":"","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文描述了在多伦多圣迈克尔医院检验科建立和实施质量管理体系的过程。这样做的部分原因是为了满足安大略省实验室认证计划的要求。在此过程中,我们利用焦点小组和跨部门委员会,修订和编制了新的程序手册和文件。整个项目花了大约两年半的时间来完成,需要团队合作、个人承诺和关键人员的专业牺牲。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Experience of implementing a quality management system in an Ontario hospital laboratory.

This article describes the process of building and implementing a quality management system in the Department of Laboratory Medicine at St. Michael's Hospital in Toronto. This was done in part to fulfill the requirements of the Ontario Laboratory Accreditation program. During the process, we revised and created new procedure manuals and documents through the use of focus groups and inter-departmental committees. The entire project took approximately two-and-a-half years to complete and required teamwork, personal commitment, and professional sacrifices by key personnel.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
National medical laboratory professionals week: celebrate our time. Blood management: a model of excellence. Guidelines for implementing automation in a hospital laboratory setting--part II. Strategies for improving employee retention. The acquisition of laboratory equipment.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1