{"title":"[风力发电设施环境影响评价]。","authors":"Kunio Hara","doi":"10.1265/jjh.73.284","DOIUrl":null,"url":null,"abstract":"<p><p>Impacts of wind power generation facilities on neighborhood residents, animals, plants, water environment and landscape are a concern. Therefore, in 2010, wind turbine facilities were targeted to be covered by the environmental impact assessment law, which was enacted in 1999, and was amended with the environmental impact statement procedure in 2013. A guidance level of noise produced by wind turbines in quiet residential areas was set in 2017. In the environmental impact statement procedure at the planning stage of targeted projects, the trust of precedent users should be obtained and consensus building should be implemented. Projects of wind turbine facilities are accepted in accordance with the environmental impact assessment law using the new guidance noise level and the procedure of the environmental impact statement.</p>","PeriodicalId":35643,"journal":{"name":"Japanese Journal of Hygiene","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2018-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1265/jjh.73.284","citationCount":"0","resultStr":"{\"title\":\"[Environmental Impact Assessment of Wind Power Generation Facilities].\",\"authors\":\"Kunio Hara\",\"doi\":\"10.1265/jjh.73.284\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p><p>Impacts of wind power generation facilities on neighborhood residents, animals, plants, water environment and landscape are a concern. Therefore, in 2010, wind turbine facilities were targeted to be covered by the environmental impact assessment law, which was enacted in 1999, and was amended with the environmental impact statement procedure in 2013. A guidance level of noise produced by wind turbines in quiet residential areas was set in 2017. In the environmental impact statement procedure at the planning stage of targeted projects, the trust of precedent users should be obtained and consensus building should be implemented. Projects of wind turbine facilities are accepted in accordance with the environmental impact assessment law using the new guidance noise level and the procedure of the environmental impact statement.</p>\",\"PeriodicalId\":35643,\"journal\":{\"name\":\"Japanese Journal of Hygiene\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1265/jjh.73.284\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Japanese Journal of Hygiene\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1265/jjh.73.284\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Medicine\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Japanese Journal of Hygiene","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1265/jjh.73.284","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Medicine","Score":null,"Total":0}
[Environmental Impact Assessment of Wind Power Generation Facilities].
Impacts of wind power generation facilities on neighborhood residents, animals, plants, water environment and landscape are a concern. Therefore, in 2010, wind turbine facilities were targeted to be covered by the environmental impact assessment law, which was enacted in 1999, and was amended with the environmental impact statement procedure in 2013. A guidance level of noise produced by wind turbines in quiet residential areas was set in 2017. In the environmental impact statement procedure at the planning stage of targeted projects, the trust of precedent users should be obtained and consensus building should be implemented. Projects of wind turbine facilities are accepted in accordance with the environmental impact assessment law using the new guidance noise level and the procedure of the environmental impact statement.