{"title":"解开进行嵌入式学习卫生系统研究的挑战:由健康学院赞助的挑战赛的获奖作品","authors":"","doi":"10.1002/lrh2.10346","DOIUrl":null,"url":null,"abstract":"Project : injuries (PrIs) worsen patient morbidity and increase hospital costs. Early recognition is imperative for reducing preventable harm. A process improvement project, TIC DOWN PrI, was undertaken to decrease PrIs by increasing the performance of a 2-RN skin assessment within 24 hours of admission using video technology and TeleICU RNs. TeleICU RNs docu-ment assessment findings, review PrI prevention best practices, and discuss missed opportunities with the bedside RNs. Wound Ostomy Continence RNs are consulted for validating skin alter-ations, when necessary. The project is being conducted in three medical ICUs (79 beds) within the BJC Healthcare System from October 2021 to March 2023. No funding was received for the project.","PeriodicalId":43916,"journal":{"name":"Learning Health Systems","volume":"6 4","pages":""},"PeriodicalIF":2.6000,"publicationDate":"2022-10-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://ftp.ncbi.nlm.nih.gov/pub/pmc/oa_pdf/02/6a/LRH2-6-e10346.PMC9576245.pdf","citationCount":"0","resultStr":"{\"title\":\"Unpacking the challenges of conducting embedded, learning health system research: The winning entries of a Challenge Contest sponsored by AcademyHealth\",\"authors\":\"\",\"doi\":\"10.1002/lrh2.10346\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Project : injuries (PrIs) worsen patient morbidity and increase hospital costs. Early recognition is imperative for reducing preventable harm. A process improvement project, TIC DOWN PrI, was undertaken to decrease PrIs by increasing the performance of a 2-RN skin assessment within 24 hours of admission using video technology and TeleICU RNs. TeleICU RNs docu-ment assessment findings, review PrI prevention best practices, and discuss missed opportunities with the bedside RNs. Wound Ostomy Continence RNs are consulted for validating skin alter-ations, when necessary. The project is being conducted in three medical ICUs (79 beds) within the BJC Healthcare System from October 2021 to March 2023. No funding was received for the project.\",\"PeriodicalId\":43916,\"journal\":{\"name\":\"Learning Health Systems\",\"volume\":\"6 4\",\"pages\":\"\"},\"PeriodicalIF\":2.6000,\"publicationDate\":\"2022-10-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://ftp.ncbi.nlm.nih.gov/pub/pmc/oa_pdf/02/6a/LRH2-6-e10346.PMC9576245.pdf\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Learning Health Systems\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://onlinelibrary.wiley.com/doi/10.1002/lrh2.10346\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"HEALTH POLICY & SERVICES\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Learning Health Systems","FirstCategoryId":"1085","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1002/lrh2.10346","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"HEALTH POLICY & SERVICES","Score":null,"Total":0}
Unpacking the challenges of conducting embedded, learning health system research: The winning entries of a Challenge Contest sponsored by AcademyHealth
Project : injuries (PrIs) worsen patient morbidity and increase hospital costs. Early recognition is imperative for reducing preventable harm. A process improvement project, TIC DOWN PrI, was undertaken to decrease PrIs by increasing the performance of a 2-RN skin assessment within 24 hours of admission using video technology and TeleICU RNs. TeleICU RNs docu-ment assessment findings, review PrI prevention best practices, and discuss missed opportunities with the bedside RNs. Wound Ostomy Continence RNs are consulted for validating skin alter-ations, when necessary. The project is being conducted in three medical ICUs (79 beds) within the BJC Healthcare System from October 2021 to March 2023. No funding was received for the project.