{"title":"房地产建设项目风险因素识别:提出决策控制结构的分析研究","authors":"S. Deep, V. Bhoola, Saumya Verma, U. Ranasinghe","doi":"10.1108/JFMPC-03-2020-0018","DOIUrl":null,"url":null,"abstract":"\nPurpose\nConstruction projects in the real estate sector are important for a nation’s economic growth. However, owing to several constraints and stereotypes, the construction industry is suffering from major capital losses. A review of recent literature revealed that risks occurring in real estate construction projects (RECPs) carried out in developing economies can be divided into four categories, i.e. financial risks, design risks, execution risks and sociopolitical risks. This study aims to identify the critical factors that lead to these risk categories and develop a control structure for RECPs.\n\n\nDesign/methodology/approach\nA quantitative method, i.e. a questionnaire-based survey, was used for this study. Using a random sampling technique the questionnaire was distributed to selected, highly experienced project managers. To determine whether the factors identified as part of the literature review strongly influence the categories, the factor analysis of the observations was performed.\n\n\nFindings\nThe observations made in this study lead to the identification of six critical risk causing factors, i.e. lack of efficient planning, execution constraints, external constraints, client-induced constraints, project constraints and partner experience. The observations indicated a lack of knowledge of project management, organizational culture and a claims redressal mechanism in RECPs. Also, this study recommends a blockchain-based control structure to control the occurrence of the risk causing factors identified.\n\n\nOriginality/value\nThis study recommends a blockchain-based control structure for controlling the risks occurring.\n","PeriodicalId":45720,"journal":{"name":"Journal of Financial Management of Property and Construction","volume":"1 1","pages":""},"PeriodicalIF":1.2000,"publicationDate":"2021-07-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Identifying the risk factors in real estate construction projects: an analytical study to propose a control structure for decision-making\",\"authors\":\"S. Deep, V. Bhoola, Saumya Verma, U. Ranasinghe\",\"doi\":\"10.1108/JFMPC-03-2020-0018\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\nPurpose\\nConstruction projects in the real estate sector are important for a nation’s economic growth. However, owing to several constraints and stereotypes, the construction industry is suffering from major capital losses. A review of recent literature revealed that risks occurring in real estate construction projects (RECPs) carried out in developing economies can be divided into four categories, i.e. financial risks, design risks, execution risks and sociopolitical risks. This study aims to identify the critical factors that lead to these risk categories and develop a control structure for RECPs.\\n\\n\\nDesign/methodology/approach\\nA quantitative method, i.e. a questionnaire-based survey, was used for this study. Using a random sampling technique the questionnaire was distributed to selected, highly experienced project managers. To determine whether the factors identified as part of the literature review strongly influence the categories, the factor analysis of the observations was performed.\\n\\n\\nFindings\\nThe observations made in this study lead to the identification of six critical risk causing factors, i.e. lack of efficient planning, execution constraints, external constraints, client-induced constraints, project constraints and partner experience. The observations indicated a lack of knowledge of project management, organizational culture and a claims redressal mechanism in RECPs. Also, this study recommends a blockchain-based control structure to control the occurrence of the risk causing factors identified.\\n\\n\\nOriginality/value\\nThis study recommends a blockchain-based control structure for controlling the risks occurring.\\n\",\"PeriodicalId\":45720,\"journal\":{\"name\":\"Journal of Financial Management of Property and Construction\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":1.2000,\"publicationDate\":\"2021-07-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Financial Management of Property and Construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/JFMPC-03-2020-0018\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"BUSINESS, FINANCE\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Financial Management of Property and Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/JFMPC-03-2020-0018","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"BUSINESS, FINANCE","Score":null,"Total":0}
引用次数: 4

摘要

目的房地产行业的建设项目对一个国家的经济增长很重要。然而,由于一些制约因素和陈规定型观念,建筑业正遭受重大资本损失。对最近文献的回顾表明,在发展中经济体开展的房地产建设项目中发生的风险可分为四类,即财务风险、设计风险、执行风险和社会政治风险。本研究旨在确定导致这些风险类别的关键因素,并制定RECPs的控制结构。设计/方法/方法本研究采用了定量方法,即基于问卷的调查。使用随机抽样技术,问卷被分发给选定的、经验丰富的项目经理。为了确定文献综述中确定的因素是否对类别有很大影响,对观察结果进行了因素分析。发现本研究中的观察结果确定了六个关键的风险成因因素,即缺乏有效的规划、执行约束、外部约束、客户诱导的约束、项目约束和合作伙伴经验。这些意见表明,RECP缺乏对项目管理、组织文化和索赔补救机制的了解。此外,本研究建议采用基于区块链的控制结构来控制已识别的风险引发因素的发生。独创性/价值本研究建议采用基于区块链的控制结构来控制发生的风险。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Identifying the risk factors in real estate construction projects: an analytical study to propose a control structure for decision-making
Purpose Construction projects in the real estate sector are important for a nation’s economic growth. However, owing to several constraints and stereotypes, the construction industry is suffering from major capital losses. A review of recent literature revealed that risks occurring in real estate construction projects (RECPs) carried out in developing economies can be divided into four categories, i.e. financial risks, design risks, execution risks and sociopolitical risks. This study aims to identify the critical factors that lead to these risk categories and develop a control structure for RECPs. Design/methodology/approach A quantitative method, i.e. a questionnaire-based survey, was used for this study. Using a random sampling technique the questionnaire was distributed to selected, highly experienced project managers. To determine whether the factors identified as part of the literature review strongly influence the categories, the factor analysis of the observations was performed. Findings The observations made in this study lead to the identification of six critical risk causing factors, i.e. lack of efficient planning, execution constraints, external constraints, client-induced constraints, project constraints and partner experience. The observations indicated a lack of knowledge of project management, organizational culture and a claims redressal mechanism in RECPs. Also, this study recommends a blockchain-based control structure to control the occurrence of the risk causing factors identified. Originality/value This study recommends a blockchain-based control structure for controlling the risks occurring.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.70
自引率
0.00%
发文量
17
期刊最新文献
Managing supply chain disruptions in the construction industry: an institutional approach Assessing risk allocation preferences of partners in international construction joint venture projects in Ghana Impact of time-based delay on public-private partnership (PPP) construction project delivery: construction stakeholders’ perspective Drivers for the adoption of building information modelling (BIM) for post-construction management in the Nigerian AECO industry Risk assessment for 3D printing in construction projects
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1