船舶工业大型区块空间调度的数学公式及启发式方法

IF 0.5 4区 工程技术 Q4 ENGINEERING, MARINE Journal of Ship Production and Design Pub Date : 2022-06-29 DOI:10.5957/jspd.05200014
Namsu Ahn, S. Kim
{"title":"船舶工业大型区块空间调度的数学公式及启发式方法","authors":"Namsu Ahn, S. Kim","doi":"10.5957/jspd.05200014","DOIUrl":null,"url":null,"abstract":"\n \n In shipbuilding industry, to reduce the staying time of the ship in a dock, floating crane and floating dock are used to handle the mega-blocks, thus it increased the turnover of the dock. Therefore, spatial scheduling for mega-block in an assembly yard becomes important in shipbuilding industry. However, spatial scheduling of mega-blocks has some unique characteristics compared with the well-known classic bin-packing problem, and not many studies can be found on this issue. This research proposes an enhanced mathematical formulation and a heuristic algorithm for spatial scheduling of mega-block arrangement problem. The formulation provides tight bound compared with the existing formulation, and the proposed heuristic can obtain good quality of the solution in a reasonable amount of time even when the size of the instance became large.\n \n \n \n Shipbuilding industry involves constructing ships and other floating vessels. Block is a base element of the shipbuilding process, and the blocks are assembled and welded in the block assembly shop, and finally erected to a ship in a dry dock. A size of a block is around 15~30 meters with a weight of around 30~300 tons (Zheng et al. 2011), and a large ship consists of around 150 blocks (Koh et al. 2011b). Some blocks are outsourced and timely delivery and quality of blocks have an absolute impact on the ship’s quality. Also, it is possible to shorten the dock duration by receiving blocks from several companies at the same time.\n","PeriodicalId":48791,"journal":{"name":"Journal of Ship Production and Design","volume":" ","pages":""},"PeriodicalIF":0.5000,"publicationDate":"2022-06-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A Mathematical Formulation and a Heuristic for the Spatial Scheduling of Mega-Blocks in Shipbuilding Industry\",\"authors\":\"Namsu Ahn, S. Kim\",\"doi\":\"10.5957/jspd.05200014\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n \\n In shipbuilding industry, to reduce the staying time of the ship in a dock, floating crane and floating dock are used to handle the mega-blocks, thus it increased the turnover of the dock. Therefore, spatial scheduling for mega-block in an assembly yard becomes important in shipbuilding industry. However, spatial scheduling of mega-blocks has some unique characteristics compared with the well-known classic bin-packing problem, and not many studies can be found on this issue. This research proposes an enhanced mathematical formulation and a heuristic algorithm for spatial scheduling of mega-block arrangement problem. The formulation provides tight bound compared with the existing formulation, and the proposed heuristic can obtain good quality of the solution in a reasonable amount of time even when the size of the instance became large.\\n \\n \\n \\n Shipbuilding industry involves constructing ships and other floating vessels. Block is a base element of the shipbuilding process, and the blocks are assembled and welded in the block assembly shop, and finally erected to a ship in a dry dock. A size of a block is around 15~30 meters with a weight of around 30~300 tons (Zheng et al. 2011), and a large ship consists of around 150 blocks (Koh et al. 2011b). Some blocks are outsourced and timely delivery and quality of blocks have an absolute impact on the ship’s quality. Also, it is possible to shorten the dock duration by receiving blocks from several companies at the same time.\\n\",\"PeriodicalId\":48791,\"journal\":{\"name\":\"Journal of Ship Production and Design\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.5000,\"publicationDate\":\"2022-06-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Ship Production and Design\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.5957/jspd.05200014\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, MARINE\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Ship Production and Design","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.5957/jspd.05200014","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, MARINE","Score":null,"Total":0}
引用次数: 0

摘要

在造船业中,为了减少船舶在码头的停留时间,采用浮式起重机和浮船坞来搬运巨型块,从而增加了码头的周转量。因此,大型装配体的空间调度问题在船舶工业中具有重要意义。然而,与经典的装箱问题相比,巨型块的空间调度具有一些独特的特点,对该问题的研究并不多见。本文提出了一种改进的大块排列问题空间调度的数学公式和启发式算法。与现有公式相比,该公式具有较强的约束,即使实例规模变大,所提出的启发式算法也能在合理的时间内获得较好的解质量。造船业包括建造船舶和其他浮船。砌块是造船过程中的基本要素,砌块在砌块组装车间进行组装和焊接,最后在干船坞中竖立成船。块的大小约为15~30米,重量约为30~300吨(Zheng et al. 2011),大型船舶由约150块组成(Koh et al. 2011b)。有些砌块是外包的,砌块的及时交付和质量对船舶质量有绝对的影响。此外,可以通过同时接收来自多个公司的区块来缩短停靠时间。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
A Mathematical Formulation and a Heuristic for the Spatial Scheduling of Mega-Blocks in Shipbuilding Industry
In shipbuilding industry, to reduce the staying time of the ship in a dock, floating crane and floating dock are used to handle the mega-blocks, thus it increased the turnover of the dock. Therefore, spatial scheduling for mega-block in an assembly yard becomes important in shipbuilding industry. However, spatial scheduling of mega-blocks has some unique characteristics compared with the well-known classic bin-packing problem, and not many studies can be found on this issue. This research proposes an enhanced mathematical formulation and a heuristic algorithm for spatial scheduling of mega-block arrangement problem. The formulation provides tight bound compared with the existing formulation, and the proposed heuristic can obtain good quality of the solution in a reasonable amount of time even when the size of the instance became large. Shipbuilding industry involves constructing ships and other floating vessels. Block is a base element of the shipbuilding process, and the blocks are assembled and welded in the block assembly shop, and finally erected to a ship in a dry dock. A size of a block is around 15~30 meters with a weight of around 30~300 tons (Zheng et al. 2011), and a large ship consists of around 150 blocks (Koh et al. 2011b). Some blocks are outsourced and timely delivery and quality of blocks have an absolute impact on the ship’s quality. Also, it is possible to shorten the dock duration by receiving blocks from several companies at the same time.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
1.10
自引率
0.00%
发文量
19
期刊介绍: Original and timely technical papers addressing problems of shipyard techniques and production of merchant and naval ships appear in this quarterly publication. Since its inception, the Journal of Ship Production and Design (formerly the Journal of Ship Production) has been a forum for peer-reviewed, professionally edited papers from academic and industry sources. As such it has influenced the worldwide development of ship production engineering as a fully qualified professional discipline. The expanded scope seeks papers in additional areas, specifically ship design, including design for production, plus other marine technology topics, such as ship operations, shipping economics, and safety. Each issue contains a well-rounded selection of technical papers relevant to marine professionals.
期刊最新文献
The Evaluation of Propeller Boss Cap Fins Effects for Different Pitches and Positions in Open Water Conditions Modeling Shipboard Power Systems for Endurance and Annual Fuel Calculations Derivation of Optimum Outfit Density for Surface Warships based on the Analysis of Variations in Work Content and Workforce Density and Productivity with Ship Size Utilizing Artificial Intelligence and Knowledge-Based Engineering Techniques in Shipbuilding: Practical Insights and Viability Practice Design of Ship Thin Section Considering Prevention of Welding-Induced Buckling
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1