Edendale N Wirewall项目的冲突后土地管理

IF 0.3 Q4 REMOTE SENSING South African Journal of Geomatics Pub Date : 2022-09-11 DOI:10.4314/sajg.v8i1.4
M. Barry
{"title":"Edendale N Wirewall项目的冲突后土地管理","authors":"M. Barry","doi":"10.4314/sajg.v8i1.4","DOIUrl":null,"url":null,"abstract":"The Edendale N Wirewall case is instructive for land tenure administration, project management and group tenure schemes in post-conflict land tenure administration and housing project management. The Greater Edendale Area experienced major localised conflict in the lead up to the end of apartheid. The Edendale N Wirewall project is a problematic state subsidised housing project. Innovations in development techniques and land tenure models are necessary in times of far reaching change. However, innovations should be justified by robust empirical evidence if failure might have a significant impact on the intended beneficiaries. Corruption, maladministration, patronage and inefficiencies can be expected in post-conflict land administration and project governance as new politicians come into power, the state is fragile and personnel changes and power shifts occur in the civil service. Fixing major problems in housing projects arising out of poor project management and poor project governance can result in costly remedial action and tenure insecurity in the decades following project completion. If the situation allows it, external expert checks on land administration operations management and far more frequent and independent project audits, on-site inspections and audit surveys may mitigate some of these challenges.","PeriodicalId":43854,"journal":{"name":"South African Journal of Geomatics","volume":null,"pages":null},"PeriodicalIF":0.3000,"publicationDate":"2022-09-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Post-conflict land administration in Edendale N Wirewall project\",\"authors\":\"M. Barry\",\"doi\":\"10.4314/sajg.v8i1.4\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Edendale N Wirewall case is instructive for land tenure administration, project management and group tenure schemes in post-conflict land tenure administration and housing project management. The Greater Edendale Area experienced major localised conflict in the lead up to the end of apartheid. The Edendale N Wirewall project is a problematic state subsidised housing project. Innovations in development techniques and land tenure models are necessary in times of far reaching change. However, innovations should be justified by robust empirical evidence if failure might have a significant impact on the intended beneficiaries. Corruption, maladministration, patronage and inefficiencies can be expected in post-conflict land administration and project governance as new politicians come into power, the state is fragile and personnel changes and power shifts occur in the civil service. Fixing major problems in housing projects arising out of poor project management and poor project governance can result in costly remedial action and tenure insecurity in the decades following project completion. If the situation allows it, external expert checks on land administration operations management and far more frequent and independent project audits, on-site inspections and audit surveys may mitigate some of these challenges.\",\"PeriodicalId\":43854,\"journal\":{\"name\":\"South African Journal of Geomatics\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.3000,\"publicationDate\":\"2022-09-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"South African Journal of Geomatics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4314/sajg.v8i1.4\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"REMOTE SENSING\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"South African Journal of Geomatics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4314/sajg.v8i1.4","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"REMOTE SENSING","Score":null,"Total":0}
引用次数: 0

摘要

Edendale N . Wirewall案例对冲突后土地权属管理和住房项目管理中的土地权属管理、项目管理和集团权属方案具有指导意义。在种族隔离制度结束之前,大埃登代尔地区经历了重大的局部冲突。Edendale N Wirewall项目是一个有问题的国家补贴住房项目。在影响深远的变革时代,发展技术和土地所有制模式的创新是必要的。但是,如果创新失败可能对预期的受益者产生重大影响,则应通过强有力的经验证据来证明创新的合理性。在冲突后的土地管理和项目治理中,随着新的政治家上台,国家变得脆弱,人事变动和权力转移发生,可能会出现腐败、管理不善、任免和效率低下的情况。解决住房项目中由于项目管理不善和项目治理不善而产生的主要问题,可能导致在项目完成后的几十年里采取代价高昂的补救行动和使用权不安全。如果情况允许,外部专家对土地管理业务管理的检查以及更频繁和独立的项目审计、现场检查和审计调查可能会减轻这些挑战。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Post-conflict land administration in Edendale N Wirewall project
The Edendale N Wirewall case is instructive for land tenure administration, project management and group tenure schemes in post-conflict land tenure administration and housing project management. The Greater Edendale Area experienced major localised conflict in the lead up to the end of apartheid. The Edendale N Wirewall project is a problematic state subsidised housing project. Innovations in development techniques and land tenure models are necessary in times of far reaching change. However, innovations should be justified by robust empirical evidence if failure might have a significant impact on the intended beneficiaries. Corruption, maladministration, patronage and inefficiencies can be expected in post-conflict land administration and project governance as new politicians come into power, the state is fragile and personnel changes and power shifts occur in the civil service. Fixing major problems in housing projects arising out of poor project management and poor project governance can result in costly remedial action and tenure insecurity in the decades following project completion. If the situation allows it, external expert checks on land administration operations management and far more frequent and independent project audits, on-site inspections and audit surveys may mitigate some of these challenges.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
82
期刊最新文献
Classification of 3D Sonar Point Clouds derived Underwater using Machine and Deep Learning (CANUPO and RandLA-Net) Approaches Characterising the evolution of the urban form of zones that accommodate warehousing clusters in the City of Cape Town municipality Error Analysis in Multibeam Hydrographic Survey System Temporal Characterization of Land Use Change and Land-scape Processes in Informal Settlements in the City of Cape Town, South Africa Analysis of thermally-induced displacements of the HartRAO Lunar Laser Ranger optical tube: impact on pointing
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1