{"title":"墨累-达令盆地计划II。利益相关者应该计划什么?","authors":"Paul Martin, J. Alexandra, C. Holley, M. Thoms","doi":"10.1080/13241583.2023.2173049","DOIUrl":null,"url":null,"abstract":"ABSTRACT The revised Murray-Darling Basin Plan is scheduled for 2026. Given the Plans complexity, and issues involved in the revision it is worth asking what will be the main drivers of change? What changes can reasonably be anticipated? What preparations should stakeholders make for their engagement in the planning process? As we move towards the next Basin Plan, there are multiple wheels in motion that could shape the future. Several factors we anticipate being important are examined. Our aim is to stimulate stakeholders to think about and prepare for major contingencies that could affect their interests. We focus on those that will likely affect water availability, and changes in policy and water-governance by public agencies. We take the starting point that rivers are complex social-ecological systems, within which structural circumstances and forms of social capital will affect individuals’ and communities’ abilities to maximise what they achieve from their natural assets, and their resilience to unfavourable contingencies. We conclude with some observations about how stakeholders might strengthen their ability to respond to opportunities or threats. While the future is always uncertain and all planning processes are flawed, how stakeholders conceive of and respond to today’s challenges will substantially affect their capacity to be resilient.","PeriodicalId":51870,"journal":{"name":"Australasian Journal of Water Resources","volume":"1 1","pages":""},"PeriodicalIF":2.4000,"publicationDate":"2023-02-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Murray-Darling Basin Plan mark II. What should stakeholders plan for?\",\"authors\":\"Paul Martin, J. Alexandra, C. Holley, M. Thoms\",\"doi\":\"10.1080/13241583.2023.2173049\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT The revised Murray-Darling Basin Plan is scheduled for 2026. Given the Plans complexity, and issues involved in the revision it is worth asking what will be the main drivers of change? What changes can reasonably be anticipated? What preparations should stakeholders make for their engagement in the planning process? As we move towards the next Basin Plan, there are multiple wheels in motion that could shape the future. Several factors we anticipate being important are examined. Our aim is to stimulate stakeholders to think about and prepare for major contingencies that could affect their interests. We focus on those that will likely affect water availability, and changes in policy and water-governance by public agencies. We take the starting point that rivers are complex social-ecological systems, within which structural circumstances and forms of social capital will affect individuals’ and communities’ abilities to maximise what they achieve from their natural assets, and their resilience to unfavourable contingencies. We conclude with some observations about how stakeholders might strengthen their ability to respond to opportunities or threats. While the future is always uncertain and all planning processes are flawed, how stakeholders conceive of and respond to today’s challenges will substantially affect their capacity to be resilient.\",\"PeriodicalId\":51870,\"journal\":{\"name\":\"Australasian Journal of Water Resources\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":2.4000,\"publicationDate\":\"2023-02-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Australasian Journal of Water Resources\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/13241583.2023.2173049\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"WATER RESOURCES\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Australasian Journal of Water Resources","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/13241583.2023.2173049","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"WATER RESOURCES","Score":null,"Total":0}
引用次数: 5
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Murray-Darling Basin Plan mark II. What should stakeholders plan for?
ABSTRACT The revised Murray-Darling Basin Plan is scheduled for 2026. Given the Plans complexity, and issues involved in the revision it is worth asking what will be the main drivers of change? What changes can reasonably be anticipated? What preparations should stakeholders make for their engagement in the planning process? As we move towards the next Basin Plan, there are multiple wheels in motion that could shape the future. Several factors we anticipate being important are examined. Our aim is to stimulate stakeholders to think about and prepare for major contingencies that could affect their interests. We focus on those that will likely affect water availability, and changes in policy and water-governance by public agencies. We take the starting point that rivers are complex social-ecological systems, within which structural circumstances and forms of social capital will affect individuals’ and communities’ abilities to maximise what they achieve from their natural assets, and their resilience to unfavourable contingencies. We conclude with some observations about how stakeholders might strengthen their ability to respond to opportunities or threats. While the future is always uncertain and all planning processes are flawed, how stakeholders conceive of and respond to today’s challenges will substantially affect their capacity to be resilient.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
5.10
自引率
21.90%
发文量
25
期刊介绍: The Australasian Journal of Water Resources ( AJWR) is a multi-disciplinary regional journal dedicated to scholarship, professional practice and discussion on water resources planning, management and policy. Its primary geographic focus is on Australia, New Zealand and the Pacific Islands. Papers from outside this region will also be welcomed if they contribute to an understanding of water resources issues in the region. Such contributions could be due to innovations applicable to the Australasian water community, or where clear linkages between studies in other parts of the world are linked to important issues or water planning, management, development and policy challenges in Australasia. These could include papers on global issues where Australasian impacts are clearly identified.
期刊最新文献
Artificial Intelligence of Things (AIoT)-oriented framework for blockage assessment at cross-drainage hydraulic structures Comment on sustainable salinity management in ‘the three-infrastructures framework and water risks in the Murray-Darling Basin, Australia’ by Williams et al. (2022) Wivenhoe, January 2011: the dam truth How well is the basin plan meeting its objectives? From the perspective of the Coorong, a sentinel of change in the Murray-Darling Basin The SWTools R package for SILO data acquisition, homogeneity testing and correction
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1