通过在服装工厂中集成中小型企业和RACI,减少了转换时间

IF 3.8 2区 工程技术 Q2 ENGINEERING, INDUSTRIAL International Journal of Lean Six Sigma Pub Date : 2023-06-20 DOI:10.1108/ijlss-10-2021-0176
A. Mohammad, A. Hamja, P. Hasle
{"title":"通过在服装工厂中集成中小型企业和RACI,减少了转换时间","authors":"A. Mohammad, A. Hamja, P. Hasle","doi":"10.1108/ijlss-10-2021-0176","DOIUrl":null,"url":null,"abstract":"Purpose\nShorter lead time with low price and quality product demand is pivotal in the garment industry. Pressure on production lead time stresses the importance of reducing style changeover time in manufacturing factories, and this paper aims to contribute to solving the challenge by showing how the single minute exchange of die (SMED) methodology in practice can be adapted to garment factories in developing countries.\n\n\nDesign/methodology/approach\nThe paper investigates three cases of SMED implementation integrated with responsible, accountable, consulted, informed (RACI) matrices in garment factories in an action research approach. Both quantitative and qualitative methods are applied.\n\n\nFindings\nThe study shows a reduction of 50% to 64% of changeover time with SMED implementation measured with two key indicators – throughout time and time to reach peak production. Moreover, the implementation depends on the application of the RACI matrix for the distribution of responsibility as well as integration with the basic production flow before and after the application of SMED.\n\n\nPractical implications\nThe study can guide better SMED implementation in garment factories with limited investment by stressing the need to adapt to the specifics of the garment industry, secure the division of responsibility and integrate SMED in the production flow before and after the changeover.\n\n\nOriginality/value\nLimited research on the application of SMED in the garment industry. This paper contributes to understanding the specific conditions for successful implementation in the garment industry in developing countries and addresses additional activities that help secure a sustainable implementation process.","PeriodicalId":48601,"journal":{"name":"International Journal of Lean Six Sigma","volume":null,"pages":null},"PeriodicalIF":3.8000,"publicationDate":"2023-06-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Reduction of changeover time through SMED with RACI integration in garment factories\",\"authors\":\"A. Mohammad, A. Hamja, P. Hasle\",\"doi\":\"10.1108/ijlss-10-2021-0176\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Purpose\\nShorter lead time with low price and quality product demand is pivotal in the garment industry. Pressure on production lead time stresses the importance of reducing style changeover time in manufacturing factories, and this paper aims to contribute to solving the challenge by showing how the single minute exchange of die (SMED) methodology in practice can be adapted to garment factories in developing countries.\\n\\n\\nDesign/methodology/approach\\nThe paper investigates three cases of SMED implementation integrated with responsible, accountable, consulted, informed (RACI) matrices in garment factories in an action research approach. Both quantitative and qualitative methods are applied.\\n\\n\\nFindings\\nThe study shows a reduction of 50% to 64% of changeover time with SMED implementation measured with two key indicators – throughout time and time to reach peak production. Moreover, the implementation depends on the application of the RACI matrix for the distribution of responsibility as well as integration with the basic production flow before and after the application of SMED.\\n\\n\\nPractical implications\\nThe study can guide better SMED implementation in garment factories with limited investment by stressing the need to adapt to the specifics of the garment industry, secure the division of responsibility and integrate SMED in the production flow before and after the changeover.\\n\\n\\nOriginality/value\\nLimited research on the application of SMED in the garment industry. This paper contributes to understanding the specific conditions for successful implementation in the garment industry in developing countries and addresses additional activities that help secure a sustainable implementation process.\",\"PeriodicalId\":48601,\"journal\":{\"name\":\"International Journal of Lean Six Sigma\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":3.8000,\"publicationDate\":\"2023-06-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Lean Six Sigma\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1108/ijlss-10-2021-0176\",\"RegionNum\":2,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Lean Six Sigma","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1108/ijlss-10-2021-0176","RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 0

摘要

目的更短的交货时间,低价格和高质量的产品需求是服装行业的关键。生产提前期的压力强调了减少制造工厂风格转换时间的重要性,本文旨在通过展示如何将实践中的单分钟换模(SMED)方法适用于发展中国家的服装厂,从而有助于解决这一挑战。设计/方法/途径本文以行动研究的方法,调查了三个在服装厂实施中小企业管理与负责、问责、咨询、知情(RACI)矩阵相结合的案例。定量方法和定性方法相结合。研究结果表明,通过两个关键指标(整个时间和达到峰值生产的时间)来衡量,SMED的实施减少了50%至64%的转换时间。此外,其实施依赖于应用RACI矩阵进行责任分配,并与应用SMED前后的基本生产流程相结合。实践意义本研究强调在转型前后的生产流程中,需要适应服装行业的具体情况,确保责任分工,并将中小企业管理整合到生产流程中,可以指导投资有限的服装厂更好地实施中小企业管理。中小企业在服装行业的应用研究。本文有助于理解发展中国家服装行业成功实施的具体条件,并解决有助于确保可持续实施过程的其他活动。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Reduction of changeover time through SMED with RACI integration in garment factories
Purpose Shorter lead time with low price and quality product demand is pivotal in the garment industry. Pressure on production lead time stresses the importance of reducing style changeover time in manufacturing factories, and this paper aims to contribute to solving the challenge by showing how the single minute exchange of die (SMED) methodology in practice can be adapted to garment factories in developing countries. Design/methodology/approach The paper investigates three cases of SMED implementation integrated with responsible, accountable, consulted, informed (RACI) matrices in garment factories in an action research approach. Both quantitative and qualitative methods are applied. Findings The study shows a reduction of 50% to 64% of changeover time with SMED implementation measured with two key indicators – throughout time and time to reach peak production. Moreover, the implementation depends on the application of the RACI matrix for the distribution of responsibility as well as integration with the basic production flow before and after the application of SMED. Practical implications The study can guide better SMED implementation in garment factories with limited investment by stressing the need to adapt to the specifics of the garment industry, secure the division of responsibility and integrate SMED in the production flow before and after the changeover. Originality/value Limited research on the application of SMED in the garment industry. This paper contributes to understanding the specific conditions for successful implementation in the garment industry in developing countries and addresses additional activities that help secure a sustainable implementation process.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
International Journal of Lean Six Sigma
International Journal of Lean Six Sigma Engineering-Industrial and Manufacturing Engineering
CiteScore
8.90
自引率
15.00%
发文量
46
期刊介绍: Launched in 2010, International Journal of Lean Six Sigma publishes original, empirical and review papers, case studies and theoretical frameworks or models related to Lean and Six Sigma methodologies. High quality submissions are sought from academics, researchers, practitioners and leading management consultants from around the world. Research, case studies and examples can be cited from manufacturing, service and public sectors. This includes manufacturing, health, financial services, local government, education, professional services, IT Services, transport, etc.
期刊最新文献
Overall lean and green effectiveness based on the environmentally sustainable value stream mapping adapted to agribusiness Quality improvement of magnetron in Company T based on Six Sigma Adapting and validating the EPLIT for assessing lean healthcare maturity in Brazilian hospitals Quality improvement development in Swedish healthcare and welfare services Adopting Industry 4.0 technologies through lean tools: evidence from the European Manufacturing Survey
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1