{"title":"用会计比率衡量建筑业滞后","authors":"John Killingsworth, M. Mehany, Jeff Kim","doi":"10.1108/JFMPC-11-2019-0085","DOIUrl":null,"url":null,"abstract":"\nPurpose\nThe apparent lag between macro-economic behavior and financial implications in the construction industry is yet to be examined. The purpose of this paper is to understand the nature of the lag and the relationship between economic changes from year-to-year and the impact on the financial status of construction companies.\n\n\nDesign/methodology/approach\nCorrelation was made between US economic growth and construction industry financial indicators over a 28-year period. Cumulative per cent growth in US GDP was considered an independent variable, while nine financial ratios were calculated and considered dependent variables in this study.\n\n\nFindings\nThe results of this study found that correlation improved when considering lag of two, three or sometimes four years after the economic event. Some financial ratios proved more sensitive than others, supporting the hypothesis of this study.\n\n\nResearch limitations/implications\nThe practical application of this study for construction companies is to understand how the construction industry lag impacts financial behavior. It therefore informs managerial decisions related to solvency, liquidity, equity structure and managerial practices; all of which are measured by financial ratios.\n\n\nPractical implications\nThis study was intended to advance the research in this area and also to serve to strengthen industry members in their financial management of construction companies. Economic dynamics have long-lasting implications, which can be addressed through an increased focus on managing financial health.\n\n\nOriginality/value\nThough the lag is intuitively known and has been studied from market perspectives, there is a lack of empirical study evaluating the impact of lag on financial key performance indicators.\n","PeriodicalId":45720,"journal":{"name":"Journal of Financial Management of Property and Construction","volume":" ","pages":""},"PeriodicalIF":1.2000,"publicationDate":"2021-04-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Using accounting ratios to measure construction industry lag\",\"authors\":\"John Killingsworth, M. Mehany, Jeff Kim\",\"doi\":\"10.1108/JFMPC-11-2019-0085\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\nPurpose\\nThe apparent lag between macro-economic behavior and financial implications in the construction industry is yet to be examined. The purpose of this paper is to understand the nature of the lag and the relationship between economic changes from year-to-year and the impact on the financial status of construction companies.\\n\\n\\nDesign/methodology/approach\\nCorrelation was made between US economic growth and construction industry financial indicators over a 28-year period. Cumulative per cent growth in US GDP was considered an independent variable, while nine financial ratios were calculated and considered dependent variables in this study.\\n\\n\\nFindings\\nThe results of this study found that correlation improved when considering lag of two, three or sometimes four years after the economic event. Some financial ratios proved more sensitive than others, supporting the hypothesis of this study.\\n\\n\\nResearch limitations/implications\\nThe practical application of this study for construction companies is to understand how the construction industry lag impacts financial behavior. It therefore informs managerial decisions related to solvency, liquidity, equity structure and managerial practices; all of which are measured by financial ratios.\\n\\n\\nPractical implications\\nThis study was intended to advance the research in this area and also to serve to strengthen industry members in their financial management of construction companies. Economic dynamics have long-lasting implications, which can be addressed through an increased focus on managing financial health.\\n\\n\\nOriginality/value\\nThough the lag is intuitively known and has been studied from market perspectives, there is a lack of empirical study evaluating the impact of lag on financial key performance indicators.\\n\",\"PeriodicalId\":45720,\"journal\":{\"name\":\"Journal of Financial Management of Property and Construction\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":1.2000,\"publicationDate\":\"2021-04-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Financial Management of Property and Construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/JFMPC-11-2019-0085\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"BUSINESS, FINANCE\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Financial Management of Property and Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/JFMPC-11-2019-0085","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"BUSINESS, FINANCE","Score":null,"Total":0}
引用次数: 1

摘要

目的宏观经济行为与建筑业金融影响之间的明显滞后尚待研究。本文的目的是了解滞后的本质,以及每年经济变化与建筑公司财务状况影响之间的关系。设计/方法/方法在28年的时间里,美国经济增长与建筑业财务指标之间存在相关性。在本研究中,美国GDP的累计增长百分比被视为一个自变量,而9个财务比率被计算并视为因变量。这项研究的结果发现,当考虑到经济事件发生后两年、三年甚至四年的滞后时间时,相关性有所提高。一些财务比率被证明比其他比率更敏感,这支持了本研究的假设。研究局限/启示本研究对建筑公司的实际应用是了解建筑业滞后对财务行为的影响。因此,它为与偿付能力、流动性、股权结构和管理实践有关的管理决策提供信息;所有这些都是用财务比率来衡量的。实践意义本研究旨在推动这一领域的研究,并为业内人士加强建筑公司财务管理提供参考。经济动态具有长期影响,这可以通过更加注重管理财务健康来解决。独创性/价值虽然滞后性是直观认识的,并且已经从市场角度进行了研究,但缺乏评估滞后性对财务关键绩效指标影响的实证研究。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Using accounting ratios to measure construction industry lag
Purpose The apparent lag between macro-economic behavior and financial implications in the construction industry is yet to be examined. The purpose of this paper is to understand the nature of the lag and the relationship between economic changes from year-to-year and the impact on the financial status of construction companies. Design/methodology/approach Correlation was made between US economic growth and construction industry financial indicators over a 28-year period. Cumulative per cent growth in US GDP was considered an independent variable, while nine financial ratios were calculated and considered dependent variables in this study. Findings The results of this study found that correlation improved when considering lag of two, three or sometimes four years after the economic event. Some financial ratios proved more sensitive than others, supporting the hypothesis of this study. Research limitations/implications The practical application of this study for construction companies is to understand how the construction industry lag impacts financial behavior. It therefore informs managerial decisions related to solvency, liquidity, equity structure and managerial practices; all of which are measured by financial ratios. Practical implications This study was intended to advance the research in this area and also to serve to strengthen industry members in their financial management of construction companies. Economic dynamics have long-lasting implications, which can be addressed through an increased focus on managing financial health. Originality/value Though the lag is intuitively known and has been studied from market perspectives, there is a lack of empirical study evaluating the impact of lag on financial key performance indicators.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.70
自引率
0.00%
发文量
17
期刊最新文献
Managing supply chain disruptions in the construction industry: an institutional approach Assessing risk allocation preferences of partners in international construction joint venture projects in Ghana Impact of time-based delay on public-private partnership (PPP) construction project delivery: construction stakeholders’ perspective Drivers for the adoption of building information modelling (BIM) for post-construction management in the Nigerian AECO industry Risk assessment for 3D printing in construction projects
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1