迷失在翻译中:在采矿主要项目团队中缺乏非技术风险评估

IF 2.4 4区 管理学 Q1 SOCIAL SCIENCES, INTERDISCIPLINARY Journal of Risk Research Pub Date : 2023-05-08 DOI:10.1080/13669877.2023.2208121
J. Fraser, Livia Mello, N. Kunz
{"title":"迷失在翻译中:在采矿主要项目团队中缺乏非技术风险评估","authors":"J. Fraser, Livia Mello, N. Kunz","doi":"10.1080/13669877.2023.2208121","DOIUrl":null,"url":null,"abstract":"Abstract Infrastructure projects increasingly encounter delays due to non-technical risks (NTR), those risks arising from interactions between business and external stakeholders with the potential to create future negative impacts on society and the environment. One sector where NTR is having a significant adverse impact is the global mining sector, where industry leaders rank NTRs as the leading cause of business risk. We investigate how NTRs are assessed during project pre-feasibility using semi-structured interviews with 20 respondents from major mining companies. We find four main factors contribute to the problem of NTR assessment: there is lack of clarity about what constitutes a NTR; there are different interpretations of how NTR is defined and evaluated; there are disciplinary silos within project teams that impede a holistic assessment of risk; and there is conflation between risk and root cause. These factors contribute to striking differences in perceptions of non-technical risks between professionals in project management versus their sustainability colleagues. A four step process is proposed to improve non-technical risk assessment, align project and sustainability professionals, and identify opportunities for mitigation measures. This work seeks to improve NTR management within mining, a sector that is under-represented in existing literature, by adding empirical research examining how project teams identify and assess non-technical risk and contributes to theory at the nexus of project management and sustainability.","PeriodicalId":16975,"journal":{"name":"Journal of Risk Research","volume":null,"pages":null},"PeriodicalIF":2.4000,"publicationDate":"2023-05-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Lost in translation: inadequate non-technical risk assessment within major project teams in mining\",\"authors\":\"J. Fraser, Livia Mello, N. Kunz\",\"doi\":\"10.1080/13669877.2023.2208121\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract Infrastructure projects increasingly encounter delays due to non-technical risks (NTR), those risks arising from interactions between business and external stakeholders with the potential to create future negative impacts on society and the environment. One sector where NTR is having a significant adverse impact is the global mining sector, where industry leaders rank NTRs as the leading cause of business risk. We investigate how NTRs are assessed during project pre-feasibility using semi-structured interviews with 20 respondents from major mining companies. We find four main factors contribute to the problem of NTR assessment: there is lack of clarity about what constitutes a NTR; there are different interpretations of how NTR is defined and evaluated; there are disciplinary silos within project teams that impede a holistic assessment of risk; and there is conflation between risk and root cause. These factors contribute to striking differences in perceptions of non-technical risks between professionals in project management versus their sustainability colleagues. A four step process is proposed to improve non-technical risk assessment, align project and sustainability professionals, and identify opportunities for mitigation measures. This work seeks to improve NTR management within mining, a sector that is under-represented in existing literature, by adding empirical research examining how project teams identify and assess non-technical risk and contributes to theory at the nexus of project management and sustainability.\",\"PeriodicalId\":16975,\"journal\":{\"name\":\"Journal of Risk Research\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":2.4000,\"publicationDate\":\"2023-05-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Risk Research\",\"FirstCategoryId\":\"91\",\"ListUrlMain\":\"https://doi.org/10.1080/13669877.2023.2208121\",\"RegionNum\":4,\"RegionCategory\":\"管理学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"SOCIAL SCIENCES, INTERDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Risk Research","FirstCategoryId":"91","ListUrlMain":"https://doi.org/10.1080/13669877.2023.2208121","RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"SOCIAL SCIENCES, INTERDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

摘要

摘要由于非技术风险(NTR),基础设施项目越来越多地遇到延误,这些风险源于企业和外部利益相关者之间的互动,有可能在未来对社会和环境造成负面影响。NTR产生重大不利影响的一个行业是全球采矿业,行业领导者将NTR列为商业风险的主要原因。我们通过对来自主要矿业公司的20名受访者的半结构化访谈,调查了在项目预可行性期间如何评估NTR。我们发现,造成NTR评估问题的主要因素有四个:NTR的构成不明确;对NTR的定义和评估有不同的解释;项目团队内部存在阻碍风险整体评估的学科孤岛;风险和根本原因混为一谈。这些因素导致项目管理专业人员与可持续发展同事对非技术风险的认知存在显著差异。提出了一个四步流程,以改进非技术性风险评估,调整项目和可持续性专业人员,并确定缓解措施的机会。这项工作旨在通过增加实证研究来改善采矿业的NTR管理,该行业在现有文献中的代表性不足,研究项目团队如何识别和评估非技术风险,并为项目管理和可持续性的理论做出贡献。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Lost in translation: inadequate non-technical risk assessment within major project teams in mining
Abstract Infrastructure projects increasingly encounter delays due to non-technical risks (NTR), those risks arising from interactions between business and external stakeholders with the potential to create future negative impacts on society and the environment. One sector where NTR is having a significant adverse impact is the global mining sector, where industry leaders rank NTRs as the leading cause of business risk. We investigate how NTRs are assessed during project pre-feasibility using semi-structured interviews with 20 respondents from major mining companies. We find four main factors contribute to the problem of NTR assessment: there is lack of clarity about what constitutes a NTR; there are different interpretations of how NTR is defined and evaluated; there are disciplinary silos within project teams that impede a holistic assessment of risk; and there is conflation between risk and root cause. These factors contribute to striking differences in perceptions of non-technical risks between professionals in project management versus their sustainability colleagues. A four step process is proposed to improve non-technical risk assessment, align project and sustainability professionals, and identify opportunities for mitigation measures. This work seeks to improve NTR management within mining, a sector that is under-represented in existing literature, by adding empirical research examining how project teams identify and assess non-technical risk and contributes to theory at the nexus of project management and sustainability.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Risk Research
Journal of Risk Research SOCIAL SCIENCES, INTERDISCIPLINARY-
CiteScore
12.20
自引率
5.90%
发文量
44
期刊介绍: The Journal of Risk Research is an international journal that publishes peer-reviewed theoretical and empirical research articles within the risk field from the areas of social, physical and health sciences and engineering, as well as articles related to decision making, regulation and policy issues in all disciplines. Articles will be published in English. The main aims of the Journal of Risk Research are to stimulate intellectual debate, to promote better risk management practices and to contribute to the development of risk management methodologies. Journal of Risk Research is the official journal of the Society for Risk Analysis Europe and the Society for Risk Analysis Japan.
期刊最新文献
Beyond the singular and linear risk approach Investigating the psychological impact of communicating epistemic uncertainty in personalized and generic risk estimates: an experimental study Securing public spaces: public willingness to sacrifice convenience and privacy for security at three U.S. public venues Seismic hazard and risk analysis in The Netherlands for deep subsurface activities in practice The role of knowledge and trust in developing risk perceptions of autonomous vehicles: a moderated mediation model
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1