考虑负荷需求和风电功率相关性的配电网中风力涡轮机的最佳尺寸和布置

T. Agheb, I. Ahmadi, A. Zakariazadeh
{"title":"考虑负荷需求和风电功率相关性的配电网中风力涡轮机的最佳尺寸和布置","authors":"T. Agheb, I. Ahmadi, A. Zakariazadeh","doi":"10.22068/IJEEE.17.3.1916","DOIUrl":null,"url":null,"abstract":"Optimal placement and sizing of distributed renewable energy resources (DER) in distribution networks can remarkably influence voltage profile improvement, amending of congestions, increasing the reliability and emission reduction. However, there is a challenge with renewable resources due to the intermittent nature of their output power. This paper presents a new viewpoint at the uncertainties associated with output powers of wind turbines and load demands by considering the correlation between them. In the proposed method, considering the simultaneous occurrence of real load demands and wind generation data, they are clustered by use of the k-means method. At first, the wind generation data are clustered in some levels, and then the associated load data of each generation level are clustered in several levels. The number of load levels in each generation level may differ from each other. By doing so the unrealistic generation-load scenarios are omitted from the process of wind turbine sizing and placement. Then, the optimum sizing and placement of distributed generation units aiming at loss reduction are carried out using the obtained generation-load scenarios. Integer-based Particle Swarm Optimization (IPSO) is used to solve the problem. The simulation result, which is carried out using MATLAB 2016 software, shows that the proposed approach causes to reduce annual energy losses more than the one in other methods. Moreover, the computational burden of the problem is decreased due to ignore some unrealistic scenarios of wind and load combinations.","PeriodicalId":39055,"journal":{"name":"Iranian Journal of Electrical and Electronic Engineering","volume":"17 1","pages":"1916-1916"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Optimum Sizing and Placement of Wind Turbines in Distribution Networks Considering Correlation of Load Demand and Wind Power\",\"authors\":\"T. Agheb, I. Ahmadi, A. Zakariazadeh\",\"doi\":\"10.22068/IJEEE.17.3.1916\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Optimal placement and sizing of distributed renewable energy resources (DER) in distribution networks can remarkably influence voltage profile improvement, amending of congestions, increasing the reliability and emission reduction. However, there is a challenge with renewable resources due to the intermittent nature of their output power. This paper presents a new viewpoint at the uncertainties associated with output powers of wind turbines and load demands by considering the correlation between them. In the proposed method, considering the simultaneous occurrence of real load demands and wind generation data, they are clustered by use of the k-means method. At first, the wind generation data are clustered in some levels, and then the associated load data of each generation level are clustered in several levels. The number of load levels in each generation level may differ from each other. By doing so the unrealistic generation-load scenarios are omitted from the process of wind turbine sizing and placement. Then, the optimum sizing and placement of distributed generation units aiming at loss reduction are carried out using the obtained generation-load scenarios. Integer-based Particle Swarm Optimization (IPSO) is used to solve the problem. The simulation result, which is carried out using MATLAB 2016 software, shows that the proposed approach causes to reduce annual energy losses more than the one in other methods. Moreover, the computational burden of the problem is decreased due to ignore some unrealistic scenarios of wind and load combinations.\",\"PeriodicalId\":39055,\"journal\":{\"name\":\"Iranian Journal of Electrical and Electronic Engineering\",\"volume\":\"17 1\",\"pages\":\"1916-1916\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-09-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Iranian Journal of Electrical and Electronic Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.22068/IJEEE.17.3.1916\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Energy\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Iranian Journal of Electrical and Electronic Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22068/IJEEE.17.3.1916","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Energy","Score":null,"Total":0}
引用次数: 1

摘要

分布式可再生能源(DER)在配电网中的优化布局和规模可以显著影响电压分布的改善、阻塞的修正、可靠性的提高和减排。然而,可再生资源由于其输出功率的间歇性而面临挑战。本文通过考虑风力涡轮机输出功率和负载需求之间的相关性,对与它们相关的不确定性提出了新的观点。在所提出的方法中,考虑到实际负荷需求和风力发电数据同时发生,使用k均值方法对它们进行聚类。首先,将风力发电数据聚集在一些级别中,然后将每个发电级别的相关负荷数据聚集在几个级别中。每个发电级别中的负载级别的数量可以彼此不同。通过这样做,不现实的发电负荷场景被从风力涡轮机的尺寸和布置过程中省略。然后,使用所获得的发电负荷场景,对分布式发电机组的最佳规模和布局进行了优化,以减少损失。采用基于整数的粒子群优化算法(IPSO)来解决该问题。使用MATLAB 2016软件进行的仿真结果表明,该方法比其他方法更能减少年能源损失。此外,由于忽略了风和荷载组合的一些不切实际的场景,该问题的计算负担降低了。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Optimum Sizing and Placement of Wind Turbines in Distribution Networks Considering Correlation of Load Demand and Wind Power
Optimal placement and sizing of distributed renewable energy resources (DER) in distribution networks can remarkably influence voltage profile improvement, amending of congestions, increasing the reliability and emission reduction. However, there is a challenge with renewable resources due to the intermittent nature of their output power. This paper presents a new viewpoint at the uncertainties associated with output powers of wind turbines and load demands by considering the correlation between them. In the proposed method, considering the simultaneous occurrence of real load demands and wind generation data, they are clustered by use of the k-means method. At first, the wind generation data are clustered in some levels, and then the associated load data of each generation level are clustered in several levels. The number of load levels in each generation level may differ from each other. By doing so the unrealistic generation-load scenarios are omitted from the process of wind turbine sizing and placement. Then, the optimum sizing and placement of distributed generation units aiming at loss reduction are carried out using the obtained generation-load scenarios. Integer-based Particle Swarm Optimization (IPSO) is used to solve the problem. The simulation result, which is carried out using MATLAB 2016 software, shows that the proposed approach causes to reduce annual energy losses more than the one in other methods. Moreover, the computational burden of the problem is decreased due to ignore some unrealistic scenarios of wind and load combinations.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Iranian Journal of Electrical and Electronic Engineering
Iranian Journal of Electrical and Electronic Engineering Engineering-Electrical and Electronic Engineering
CiteScore
1.70
自引率
0.00%
发文量
13
审稿时长
12 weeks
期刊最新文献
Robust Operation Planning With Participation of Flexibility Resources Both on Generation and Demand Sides Under Uncertainty of Wind-based Generation Units A Novel Droop-based Control Strategy for Improving the Performance of VSC-MTDC Systems in Post-Contingency Conditions Securing Reliability Constrained Technology Combination for Isolated Micro-Grid Using Multi-Agent Based Optimization View-Invariant and Robust Gait Recognition Using Gait Energy Images of Leg Region and Masking Altered Sections Multiple Electricity Markets Competitiveness Undergoing Symmetric and Asymmetric Renewables Development Policies
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1