阻碍建筑业实施价值再造的因素

Q2 Business, Management and Accounting Journal of Engineering Project and Production Management Pub Date : 2022-01-01 DOI:10.32738/jeppm-2022-0008
Winston Shakantu, I. Jibrin, I. Saidu
{"title":"阻碍建筑业实施价值再造的因素","authors":"Winston Shakantu, I. Jibrin, I. Saidu","doi":"10.32738/jeppm-2022-0008","DOIUrl":null,"url":null,"abstract":"Production improvement techniques in use by the Construction Industry (CI) in developing countries like Nigerian are yielding sub-optimal value for customers. This necessitated the investigation of techniques to engender maximum efficiency gains. Hence, continuous improvements on new techniques that will give customer satisfaction are required to be implemented to improve the development of the sector. The adoption of Value Reengineering (VRE) could result in a breakthrough solution in resolving the challenges of customer dissatisfaction in the industry. The subjectivist methodology was utilised to establish critical success factors in thirty-four purposefully sampled building construction operators within Abuja using purposive sampling techniques. The deductive/thematic technique was used to analyse the recorded, transcribed, and interpreted interview data after it had been sorted and coded to develop information about any common pattern among the interviewees' evidence on causes militating against VRE deployment in the CI. The results revealed a significant need for the process to be reengineered through the utility of change enablers and the introduction of assistive technologies. The study further reveals that inadequate employee training to implement VRE, lack of understanding of the implementation requirements, top management commitment, quality standards of contractor’s work, and lack of employee consensus to see the implementation through is the key planning, technical and organisational related factors identified. The research concluded that VRE implementation would be achieved if adequate attention is given to the level of awareness of the operator of the technique through training and retraining of operatives in the industry. The study recommends that VRE implementation in all construction projects be encouraged, as it has the potential for the customer to achieve its desired satisfaction on value offering.","PeriodicalId":53274,"journal":{"name":"Journal of Engineering Project and Production Management","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Factors Militating against Implementation of Value Reengineering in the Construction Industry\",\"authors\":\"Winston Shakantu, I. Jibrin, I. Saidu\",\"doi\":\"10.32738/jeppm-2022-0008\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Production improvement techniques in use by the Construction Industry (CI) in developing countries like Nigerian are yielding sub-optimal value for customers. This necessitated the investigation of techniques to engender maximum efficiency gains. Hence, continuous improvements on new techniques that will give customer satisfaction are required to be implemented to improve the development of the sector. The adoption of Value Reengineering (VRE) could result in a breakthrough solution in resolving the challenges of customer dissatisfaction in the industry. The subjectivist methodology was utilised to establish critical success factors in thirty-four purposefully sampled building construction operators within Abuja using purposive sampling techniques. The deductive/thematic technique was used to analyse the recorded, transcribed, and interpreted interview data after it had been sorted and coded to develop information about any common pattern among the interviewees' evidence on causes militating against VRE deployment in the CI. The results revealed a significant need for the process to be reengineered through the utility of change enablers and the introduction of assistive technologies. The study further reveals that inadequate employee training to implement VRE, lack of understanding of the implementation requirements, top management commitment, quality standards of contractor’s work, and lack of employee consensus to see the implementation through is the key planning, technical and organisational related factors identified. The research concluded that VRE implementation would be achieved if adequate attention is given to the level of awareness of the operator of the technique through training and retraining of operatives in the industry. The study recommends that VRE implementation in all construction projects be encouraged, as it has the potential for the customer to achieve its desired satisfaction on value offering.\",\"PeriodicalId\":53274,\"journal\":{\"name\":\"Journal of Engineering Project and Production Management\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Engineering Project and Production Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.32738/jeppm-2022-0008\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Business, Management and Accounting\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering Project and Production Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32738/jeppm-2022-0008","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Business, Management and Accounting","Score":null,"Total":0}
引用次数: 0

摘要

在尼日利亚等发展中国家,建筑业(CI)使用的生产改进技术为客户带来了次优价值。这就需要研究能最大限度提高效率的技术。因此,需要不断改进新技术,使客户满意,以改善该部门的发展。采用价值再造(VRE)可以在解决行业中客户不满的挑战方面产生突破性的解决方案。采用主观主义方法,利用有目的抽样技术在阿布贾境内34个有目的抽样的建筑施工经营者中确定关键成功因素。在对访谈数据进行分类和编码后,使用演绎/主题技术对记录、转录和解释的访谈数据进行分析,以开发有关受访者证据中任何共同模式的信息,以确定妨碍在CI中部署VRE的原因。结果揭示了通过变更推动者的效用和引入辅助技术来重新设计流程的重要需求。研究进一步表明,实施VRE的员工培训不足、对实施要求的理解不足、高层管理人员的承诺、承包商工作的质量标准、以及员工在实施过程中缺乏共识是确定的关键规划、技术和组织相关因素。研究得出的结论是,如果通过对行业内操作人员的培训和再培训,对操作人员对该技术的认识水平给予足够的重视,就可以实现VRE的实施。该研究建议鼓励在所有建筑项目中实施VRE,因为它有可能使客户在价值提供方面达到预期的满意度。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Factors Militating against Implementation of Value Reengineering in the Construction Industry
Production improvement techniques in use by the Construction Industry (CI) in developing countries like Nigerian are yielding sub-optimal value for customers. This necessitated the investigation of techniques to engender maximum efficiency gains. Hence, continuous improvements on new techniques that will give customer satisfaction are required to be implemented to improve the development of the sector. The adoption of Value Reengineering (VRE) could result in a breakthrough solution in resolving the challenges of customer dissatisfaction in the industry. The subjectivist methodology was utilised to establish critical success factors in thirty-four purposefully sampled building construction operators within Abuja using purposive sampling techniques. The deductive/thematic technique was used to analyse the recorded, transcribed, and interpreted interview data after it had been sorted and coded to develop information about any common pattern among the interviewees' evidence on causes militating against VRE deployment in the CI. The results revealed a significant need for the process to be reengineered through the utility of change enablers and the introduction of assistive technologies. The study further reveals that inadequate employee training to implement VRE, lack of understanding of the implementation requirements, top management commitment, quality standards of contractor’s work, and lack of employee consensus to see the implementation through is the key planning, technical and organisational related factors identified. The research concluded that VRE implementation would be achieved if adequate attention is given to the level of awareness of the operator of the technique through training and retraining of operatives in the industry. The study recommends that VRE implementation in all construction projects be encouraged, as it has the potential for the customer to achieve its desired satisfaction on value offering.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Engineering Project and Production Management
Journal of Engineering Project and Production Management Business, Management and Accounting-Business, Management and Accounting (miscellaneous)
CiteScore
2.30
自引率
0.00%
发文量
24
审稿时长
30 weeks
期刊最新文献
Condition-based Maintenance Using BIM: A Case Study of Energy Modeling for a Residential Building Comparative Evaluation of Road Safety Level and Geometric Design Consistency Digitalization and Engineering Management for the Next-Era Industries Pandemic Effect on the Industry 4.0 Readiness: A Case Study in Vietnamese Industry Internet of Things (IoT) Impact on Facility Management of Office Buildings: A Qualitative Study
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1