{"title":"以孟买Elphinstone路步行过桥(FOB)踩踏事件为例","authors":"Sanjeev Kadam, P. Bandyopadhyay","doi":"10.1504/ijcis.2020.10024020","DOIUrl":null,"url":null,"abstract":"Planning or implementation delays of critical infrastructure (CI) projects resulted in misfortunes such as accidents, stampedes or deaths. In this descriptive case study, an incidence of the stampede at the suburban train station in Mumbai has discussed. An endeavour has been made to examine underlying causes which instigate direct causes reinforced by contributing causes. Indian Army was being roped in for constructing additional foot-over-bridge (FOB) after the stampede. This case features the earnestness of appropriate and timely development of associated infrastructure in and around suburban stations in Mumbai proportionate to abundant passengers commuting. Post stampede reports from newspapers, televisions channels and the internet have largely used to build this case. Pre and post cause analysis discussion on Elphinstone Road FOB stampede case is an eye-opener to justify sustainable emergency management and associated infrastructure development in Mumbai.","PeriodicalId":44956,"journal":{"name":"International Journal of Critical Infrastructures","volume":"16 1","pages":"77-90"},"PeriodicalIF":0.5000,"publicationDate":"2020-02-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A case study of Elphinstone Road Foot-Over-Bridge (FOB) Stampede in Mumbai\",\"authors\":\"Sanjeev Kadam, P. Bandyopadhyay\",\"doi\":\"10.1504/ijcis.2020.10024020\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Planning or implementation delays of critical infrastructure (CI) projects resulted in misfortunes such as accidents, stampedes or deaths. In this descriptive case study, an incidence of the stampede at the suburban train station in Mumbai has discussed. An endeavour has been made to examine underlying causes which instigate direct causes reinforced by contributing causes. Indian Army was being roped in for constructing additional foot-over-bridge (FOB) after the stampede. This case features the earnestness of appropriate and timely development of associated infrastructure in and around suburban stations in Mumbai proportionate to abundant passengers commuting. Post stampede reports from newspapers, televisions channels and the internet have largely used to build this case. Pre and post cause analysis discussion on Elphinstone Road FOB stampede case is an eye-opener to justify sustainable emergency management and associated infrastructure development in Mumbai.\",\"PeriodicalId\":44956,\"journal\":{\"name\":\"International Journal of Critical Infrastructures\",\"volume\":\"16 1\",\"pages\":\"77-90\"},\"PeriodicalIF\":0.5000,\"publicationDate\":\"2020-02-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Critical Infrastructures\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1504/ijcis.2020.10024020\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Critical Infrastructures","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/ijcis.2020.10024020","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
A case study of Elphinstone Road Foot-Over-Bridge (FOB) Stampede in Mumbai
Planning or implementation delays of critical infrastructure (CI) projects resulted in misfortunes such as accidents, stampedes or deaths. In this descriptive case study, an incidence of the stampede at the suburban train station in Mumbai has discussed. An endeavour has been made to examine underlying causes which instigate direct causes reinforced by contributing causes. Indian Army was being roped in for constructing additional foot-over-bridge (FOB) after the stampede. This case features the earnestness of appropriate and timely development of associated infrastructure in and around suburban stations in Mumbai proportionate to abundant passengers commuting. Post stampede reports from newspapers, televisions channels and the internet have largely used to build this case. Pre and post cause analysis discussion on Elphinstone Road FOB stampede case is an eye-opener to justify sustainable emergency management and associated infrastructure development in Mumbai.
期刊介绍:
IJCIS is an inter-disciplinary and refereed journal that provides a professional and scholarly forum for cross-learning between different scientific and technological disciplines, and between business and economic, as well as between societal and managerial, disciplines in the area of critical infrastructures. Critical infrastructures are networks for the provision of telecommunication and information services, energy services, water supply, transportation of people and goods, banking and financial services, government services and emergency services. By addressing commonalities and interrelationships between the various sectors, IJCIS enables scientists, policy makers and professionals in the field to learn from experiences in other countries and in other infrastructure sectors.