兰德桥(维戈)扩建侧板的施工

IF 0.1 Q4 ENGINEERING, CIVIL Hormigon y Acero Pub Date : 2020-12-17 DOI:10.33586/HYA.2020.2336
Fatima Otero Vieitez
{"title":"兰德桥(维戈)扩建侧板的施工","authors":"Fatima Otero Vieitez","doi":"10.33586/HYA.2020.2336","DOIUrl":null,"url":null,"abstract":"The enlargement of the Rande Bridge was a milestone in the lateral widening on a high-span cable-stayed bridge built with the infrastructure open to traffic. The project attaches a new deck to each of the two outer sides of the main piers. This deck is formed by a metal box section and an external lattice connected to the pre-existing deck by means of metallic lattices and spherical labelled joints. The segments were made in a workshop, moved by road to the storage area where they were finished and on a pontoon by sea to the vertical of their definitive position. The lifting was carried out in collaboration between a front traveler and a rear one designed for this purpose. PALABRAS CLAVE: Ampliación, atirantado, izado, pórtico, carro, dovela, tablero metálico.","PeriodicalId":41423,"journal":{"name":"Hormigon y Acero","volume":" ","pages":""},"PeriodicalIF":0.1000,"publicationDate":"2020-12-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Ejecución de los tableros laterales en la ampliación del puente de Rande (Vigo)\",\"authors\":\"Fatima Otero Vieitez\",\"doi\":\"10.33586/HYA.2020.2336\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The enlargement of the Rande Bridge was a milestone in the lateral widening on a high-span cable-stayed bridge built with the infrastructure open to traffic. The project attaches a new deck to each of the two outer sides of the main piers. This deck is formed by a metal box section and an external lattice connected to the pre-existing deck by means of metallic lattices and spherical labelled joints. The segments were made in a workshop, moved by road to the storage area where they were finished and on a pontoon by sea to the vertical of their definitive position. The lifting was carried out in collaboration between a front traveler and a rear one designed for this purpose. PALABRAS CLAVE: Ampliación, atirantado, izado, pórtico, carro, dovela, tablero metálico.\",\"PeriodicalId\":41423,\"journal\":{\"name\":\"Hormigon y Acero\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.1000,\"publicationDate\":\"2020-12-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Hormigon y Acero\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33586/HYA.2020.2336\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Hormigon y Acero","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33586/HYA.2020.2336","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

摘要

兰德大桥的扩建是一座横向加宽的大跨度斜拉桥的里程碑,这座桥是在基础设施开放的情况下建造的。该项目在主桥墩的两个外侧各安装了一个新的桥面。该桥面由金属盒部分和外部晶格组成,通过金属晶格和球形标记接头连接到原有的桥面。这些部件是在车间里制作的,通过公路运送到存储区,在那里完成,然后在海上的浮桥上放置到最终位置的垂直位置。提升是在一个前旅行车和一个为这个目的设计的后旅行车之间的协作下进行的。PALABRAS CLAVE: Ampliación, atirantado, izado, pórtico, carro, dovela, tabero metálico。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Ejecución de los tableros laterales en la ampliación del puente de Rande (Vigo)
The enlargement of the Rande Bridge was a milestone in the lateral widening on a high-span cable-stayed bridge built with the infrastructure open to traffic. The project attaches a new deck to each of the two outer sides of the main piers. This deck is formed by a metal box section and an external lattice connected to the pre-existing deck by means of metallic lattices and spherical labelled joints. The segments were made in a workshop, moved by road to the storage area where they were finished and on a pontoon by sea to the vertical of their definitive position. The lifting was carried out in collaboration between a front traveler and a rear one designed for this purpose. PALABRAS CLAVE: Ampliación, atirantado, izado, pórtico, carro, dovela, tablero metálico.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Hormigon y Acero
Hormigon y Acero ENGINEERING, CIVIL-
CiteScore
0.50
自引率
0.00%
发文量
4
期刊最新文献
Ruedas trianguladas de radios traccionados con perfil biconvexo y planta elíptica Evaluation of horizontal loads in the concept design of tall building concrete structures Blast Absorption Capacity of Brittle Mineral Foam: an Experimental Evaluation Sobre el diseño de capiteles metálicos en forjados unidireccionales de edificación Energy Flow Considerations for Structural Response under Blast
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1