{"title":"与Poatina电站洞穴有关的岩土工程考虑","authors":"D. Sainsbury, K. Stacey, B. Sainsbury, P. Hills","doi":"10.56295/agj5745","DOIUrl":null,"url":null,"abstract":"The Poatina Power Station Cavern was designed with a focus on the newly emerging rock mechanics theory and principles that were rapidly developing during the 1950’s and 60’s. This included measurement of the in-situ rock mass stress condition and photo-elastic analysis of the induced stress around the planned underground openings. These studies led to the adoption of many ‘firsts’ in rock mechanics that included a trapezoidal roof shape, installation of stress relieving slots and fully encapsulated grouted rebar bolts. Based on historical documentation of the construction of the cavern, a three- dimensional numerical model of the cavern construction sequence has been developed. The model is able to provide an accurate match to the observed and monitored ground conditions during construction that includes observed failure modes and instrumentation data. Based on the calibrated model outcomes, Hydro Tasmania was able to undertake a more informed review of the risks associated with the current and future ground support capacity and were able to reliably assess rehabilitation requirements for the cavern support system.","PeriodicalId":43619,"journal":{"name":"Australian Geomechanics Journal","volume":null,"pages":null},"PeriodicalIF":0.3000,"publicationDate":"2022-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Geotechnical Considerations Associated With The Poatina Power Station Cavern\",\"authors\":\"D. Sainsbury, K. Stacey, B. Sainsbury, P. Hills\",\"doi\":\"10.56295/agj5745\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Poatina Power Station Cavern was designed with a focus on the newly emerging rock mechanics theory and principles that were rapidly developing during the 1950’s and 60’s. This included measurement of the in-situ rock mass stress condition and photo-elastic analysis of the induced stress around the planned underground openings. These studies led to the adoption of many ‘firsts’ in rock mechanics that included a trapezoidal roof shape, installation of stress relieving slots and fully encapsulated grouted rebar bolts. Based on historical documentation of the construction of the cavern, a three- dimensional numerical model of the cavern construction sequence has been developed. The model is able to provide an accurate match to the observed and monitored ground conditions during construction that includes observed failure modes and instrumentation data. Based on the calibrated model outcomes, Hydro Tasmania was able to undertake a more informed review of the risks associated with the current and future ground support capacity and were able to reliably assess rehabilitation requirements for the cavern support system.\",\"PeriodicalId\":43619,\"journal\":{\"name\":\"Australian Geomechanics Journal\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.3000,\"publicationDate\":\"2022-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Australian Geomechanics Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.56295/agj5745\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, GEOLOGICAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Australian Geomechanics Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.56295/agj5745","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, GEOLOGICAL","Score":null,"Total":0}
引用次数: 1

摘要

波阿蒂纳发电站洞穴的设计重点是20世纪50年代和60年代快速发展的新兴岩石力学理论和原理。这包括现场岩体应力条件的测量和计划地下开口周围诱导应力的光弹性分析。这些研究导致了岩石力学中许多“第一”的采用,包括梯形屋顶形状、应力消除槽的安装和完全封装的灌浆钢筋螺栓。基于洞室施工的历史文献,建立了洞室施工序列的三维数值模型。该模型能够在施工期间提供与观测和监测到的地面条件的精确匹配,包括观测到的故障模式和仪器数据。根据校准的模型结果,塔斯马尼亚水电公司能够对与当前和未来地面支护能力相关的风险进行更知情的审查,并能够可靠地评估洞穴支护系统的修复要求。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Geotechnical Considerations Associated With The Poatina Power Station Cavern
The Poatina Power Station Cavern was designed with a focus on the newly emerging rock mechanics theory and principles that were rapidly developing during the 1950’s and 60’s. This included measurement of the in-situ rock mass stress condition and photo-elastic analysis of the induced stress around the planned underground openings. These studies led to the adoption of many ‘firsts’ in rock mechanics that included a trapezoidal roof shape, installation of stress relieving slots and fully encapsulated grouted rebar bolts. Based on historical documentation of the construction of the cavern, a three- dimensional numerical model of the cavern construction sequence has been developed. The model is able to provide an accurate match to the observed and monitored ground conditions during construction that includes observed failure modes and instrumentation data. Based on the calibrated model outcomes, Hydro Tasmania was able to undertake a more informed review of the risks associated with the current and future ground support capacity and were able to reliably assess rehabilitation requirements for the cavern support system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Australian Geomechanics Journal
Australian Geomechanics Journal ENGINEERING, GEOLOGICAL-
CiteScore
0.40
自引率
0.00%
发文量
1
期刊最新文献
Can the shrink-swell index be predicted in the Wagga Wagga region based on Atterberg limits? The Queensland geotechnical database Simplified excavation-induced lateral displacement assessment in Sydney area Australian Geomechanics – State of the Journal Assessing the geometry of defect waviness from borehole data
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1