影响阿联酋以生产为导向项目的关键风险因素:“最佳-最差方法”(BWM)分析

IF 1.9 4区 管理学 Q3 ENGINEERING, INDUSTRIAL Engineering Management Journal Pub Date : 2023-04-03 DOI:10.1080/10429247.2022.2041963
S. Khan, U. Ojiako, Alasdair Marshall, D. Dalalah, Serkan Ceylan, Naser Nader Ali Shabani, Salama Imad Al Sharqawi
{"title":"影响阿联酋以生产为导向项目的关键风险因素:“最佳-最差方法”(BWM)分析","authors":"S. Khan, U. Ojiako, Alasdair Marshall, D. Dalalah, Serkan Ceylan, Naser Nader Ali Shabani, Salama Imad Al Sharqawi","doi":"10.1080/10429247.2022.2041963","DOIUrl":null,"url":null,"abstract":"Abstract The aim of this paper is to categorize and prioritize the critical risk factors that influence production-oriented projects. Utilizing data obtained from the metal production (manufacturing) and fabrication industry in United Arab Emirates, we employ multicriteria decision analysis encompassing the ‘Best-Worst Method’ (BWM) for factor ranking and categorization. The outcome of this exercise being the development of substantial proficiency in risk management that will have a significant impact on the overall success of projects commissioned within the production space. Findings drawn against an integrated ‘Technology–Organization–Environment’ and ‘Four levels of uncertainty’ framework suggests that ‘Automation,’ ‘Cycle time,’ and ‘Feed rate’ (technological factors), ‘Manpower utilization’ and ‘Agility’ (organizational factors), and ‘Occupational health and safety’ (environmental factors), ranked highest in terms of critical risk factors likely to impact upon the outcome of projects. This paper makes a specific contribution to the literature in that our use of an integrated ‘Technology–Organization–Environment’ – ‘Four levels of uncertainty’ framework as a risk intelligence focused typology allows us to focus on proactive as against reactive management of risk. This forms the core element of our theorization of risk knowledge as risk intelligence.","PeriodicalId":54353,"journal":{"name":"Engineering Management Journal","volume":"35 1","pages":"144 - 160"},"PeriodicalIF":1.9000,"publicationDate":"2023-04-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"The Critical Risk Factors that Influence Production-oriented Projects in the United Arab Emirates: A ‘Best-worst Method’ (BWM) Analysis\",\"authors\":\"S. Khan, U. Ojiako, Alasdair Marshall, D. Dalalah, Serkan Ceylan, Naser Nader Ali Shabani, Salama Imad Al Sharqawi\",\"doi\":\"10.1080/10429247.2022.2041963\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract The aim of this paper is to categorize and prioritize the critical risk factors that influence production-oriented projects. Utilizing data obtained from the metal production (manufacturing) and fabrication industry in United Arab Emirates, we employ multicriteria decision analysis encompassing the ‘Best-Worst Method’ (BWM) for factor ranking and categorization. The outcome of this exercise being the development of substantial proficiency in risk management that will have a significant impact on the overall success of projects commissioned within the production space. Findings drawn against an integrated ‘Technology–Organization–Environment’ and ‘Four levels of uncertainty’ framework suggests that ‘Automation,’ ‘Cycle time,’ and ‘Feed rate’ (technological factors), ‘Manpower utilization’ and ‘Agility’ (organizational factors), and ‘Occupational health and safety’ (environmental factors), ranked highest in terms of critical risk factors likely to impact upon the outcome of projects. This paper makes a specific contribution to the literature in that our use of an integrated ‘Technology–Organization–Environment’ – ‘Four levels of uncertainty’ framework as a risk intelligence focused typology allows us to focus on proactive as against reactive management of risk. This forms the core element of our theorization of risk knowledge as risk intelligence.\",\"PeriodicalId\":54353,\"journal\":{\"name\":\"Engineering Management Journal\",\"volume\":\"35 1\",\"pages\":\"144 - 160\"},\"PeriodicalIF\":1.9000,\"publicationDate\":\"2023-04-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Engineering Management Journal\",\"FirstCategoryId\":\"91\",\"ListUrlMain\":\"https://doi.org/10.1080/10429247.2022.2041963\",\"RegionNum\":4,\"RegionCategory\":\"管理学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering Management Journal","FirstCategoryId":"91","ListUrlMain":"https://doi.org/10.1080/10429247.2022.2041963","RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 3

摘要

本文的目的是对影响面向生产的项目的关键风险因素进行分类和优先排序。利用从阿拉伯联合酋长国的金属生产(制造)和制造行业获得的数据,我们采用多标准决策分析,包括“最佳-最差方法”(BWM)进行因素排名和分类。这种练习的结果是在风险管理方面的实质性熟练程度的发展,这将对生产空间内委托的项目的整体成功产生重大影响。综合“技术-组织-环境”和“四个不确定性水平”框架得出的研究结果表明,“自动化”、“周期时间”和“进料率”(技术因素)、“人力利用率”和“敏捷性”(组织因素)以及“职业健康和安全”(环境因素)在可能影响项目结果的关键风险因素方面排名最高。本文对文献做出了具体贡献,因为我们使用了集成的“技术-组织-环境”-“四个不确定性级别”框架作为风险情报集中的类型学,使我们能够专注于前瞻性的风险管理,而不是被动的风险管理。这构成了我们将风险知识理论化为风险智力的核心要素。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The Critical Risk Factors that Influence Production-oriented Projects in the United Arab Emirates: A ‘Best-worst Method’ (BWM) Analysis
Abstract The aim of this paper is to categorize and prioritize the critical risk factors that influence production-oriented projects. Utilizing data obtained from the metal production (manufacturing) and fabrication industry in United Arab Emirates, we employ multicriteria decision analysis encompassing the ‘Best-Worst Method’ (BWM) for factor ranking and categorization. The outcome of this exercise being the development of substantial proficiency in risk management that will have a significant impact on the overall success of projects commissioned within the production space. Findings drawn against an integrated ‘Technology–Organization–Environment’ and ‘Four levels of uncertainty’ framework suggests that ‘Automation,’ ‘Cycle time,’ and ‘Feed rate’ (technological factors), ‘Manpower utilization’ and ‘Agility’ (organizational factors), and ‘Occupational health and safety’ (environmental factors), ranked highest in terms of critical risk factors likely to impact upon the outcome of projects. This paper makes a specific contribution to the literature in that our use of an integrated ‘Technology–Organization–Environment’ – ‘Four levels of uncertainty’ framework as a risk intelligence focused typology allows us to focus on proactive as against reactive management of risk. This forms the core element of our theorization of risk knowledge as risk intelligence.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Engineering Management Journal
Engineering Management Journal 工程技术-工程:工业
CiteScore
5.60
自引率
12.00%
发文量
27
审稿时长
>12 weeks
期刊介绍: EMJ is designed to provide practical, pertinent knowledge on the management of technology, technical professionals, and technical organizations. EMJ strives to provide value to the practice of engineering management and engineering managers. EMJ is an archival journal that facilitates both practitioners and university faculty in publishing useful articles. The primary focus is on articles that improve the practice of engineering management. To support the practice of engineering management, EMJ publishes papers within key engineering management content areas. EMJ Editors will continue to refine these areas to ensure they are aligned with the challenges faced by technical organizations and technical managers.
期刊最新文献
Lean Office: Proposition and Application of a Process-Mapping Method Based on the Shingo Production Mechanism (SPM) Managing Stakeholder Pressure for Megaproject Success and Green Innovation: The Key Role of Social Responsibility Engineering Management Education: Washington Accord Accreditation Programs The New PAD: A Method to Implement the Lean Construction Principles A Risk Minimization Model for a Multi-Skilled, Multi-Mode Resource-Constrained Project Scheduling Problem with Discrete Time-Cost-Quality-Risk Trade-Off
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1