差放顶板和煤层水力压裂消除煤矿动力现象的方法

Q4 Engineering Gornaya Promyshlennost Pub Date : 2023-01-15 DOI:10.30686/1609-9192-2022-6-46-53
V. Klishin, O. Tailakov, G. Opruk, E. A. Utkaev, S. Klishin
{"title":"差放顶板和煤层水力压裂消除煤矿动力现象的方法","authors":"V. Klishin, O. Tailakov, G. Opruk, E. A. Utkaev, S. Klishin","doi":"10.30686/1609-9192-2022-6-46-53","DOIUrl":null,"url":null,"abstract":"The paper demonstrates the need to develop methods of managing poorly caving roofs in the stoping and development faces as well as the ways of intensifying the degassing process of unrelieved coal seams to improve the technical and economic performance and safety of operation. Methods of the directional hydraulic fracturing (DHF) of the roof and the interval hydraulic fracturing (IHF) of the coal seam are suggested to eliminate the dynamic phenomena in coal mines as well as technological charts of their implementation. The DHF method consists in creating an initiating slot in the borehole walls, which acts as a stress concentrator, followed by its sealing with an insulating device, i.e. a packer. When a fluid is injected into this slot, the tensile stresses are created in the borehole walls and the fracture is forced to develop in a predetermined direction. The IHF method of the coal seam from the development workings using non-cased degassing holes of large and variable diameter consists in creation of transverse hydraulic fractures in the hole relative to its axis and increasing its gas recovery by an order of magnitude. This is achieved by using a double-sided packer with elastically expanding elements and a valve installed between them. Additional tangential stresses created in the borehole walls ensure the development of inelastic strain zone, leading to the formation of transverse cracks in the borehole. The results of numerical modeling of the stress-and-strain state of the rocks near the borehole where packer seals are installed using the finite element method are presented in the paper. Techniques and means to monitor the processes of hydraulic impact on the coal-rock massif are shown.","PeriodicalId":36119,"journal":{"name":"Gornaya Promyshlennost","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-01-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Methods of hydraulic fracturing of poorly caving roof and coal seams to eliminate dynamic phenomena in coal mines\",\"authors\":\"V. Klishin, O. Tailakov, G. Opruk, E. A. Utkaev, S. Klishin\",\"doi\":\"10.30686/1609-9192-2022-6-46-53\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The paper demonstrates the need to develop methods of managing poorly caving roofs in the stoping and development faces as well as the ways of intensifying the degassing process of unrelieved coal seams to improve the technical and economic performance and safety of operation. Methods of the directional hydraulic fracturing (DHF) of the roof and the interval hydraulic fracturing (IHF) of the coal seam are suggested to eliminate the dynamic phenomena in coal mines as well as technological charts of their implementation. The DHF method consists in creating an initiating slot in the borehole walls, which acts as a stress concentrator, followed by its sealing with an insulating device, i.e. a packer. When a fluid is injected into this slot, the tensile stresses are created in the borehole walls and the fracture is forced to develop in a predetermined direction. The IHF method of the coal seam from the development workings using non-cased degassing holes of large and variable diameter consists in creation of transverse hydraulic fractures in the hole relative to its axis and increasing its gas recovery by an order of magnitude. This is achieved by using a double-sided packer with elastically expanding elements and a valve installed between them. Additional tangential stresses created in the borehole walls ensure the development of inelastic strain zone, leading to the formation of transverse cracks in the borehole. The results of numerical modeling of the stress-and-strain state of the rocks near the borehole where packer seals are installed using the finite element method are presented in the paper. Techniques and means to monitor the processes of hydraulic impact on the coal-rock massif are shown.\",\"PeriodicalId\":36119,\"journal\":{\"name\":\"Gornaya Promyshlennost\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-01-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Gornaya Promyshlennost\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.30686/1609-9192-2022-6-46-53\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Gornaya Promyshlennost","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30686/1609-9192-2022-6-46-53","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 1

摘要

论述了为提高采空区的技术经济效益和生产安全,有必要研究采空区不良冒落顶板的治理方法和加强未卸压煤层的脱气工艺。提出了顶板定向水力压裂(DHF)和煤层间隔水力压裂(IHF)的方法,以消除煤矿中的动力现象,并给出了实施工艺流程图。DHF方法包括在井壁上形成一个初始槽,作为应力集中器,然后用绝缘装置(即封隔器)将其密封。当流体注入该槽时,在井壁上产生拉应力,迫使裂缝向预定方向发展。利用大直径无套管脱气孔从开发工作面开采煤层的IHF方法是在相对于其轴线的孔中形成横向水力裂缝,并将其瓦斯采收率提高一个数量级。这是通过使用带有弹性膨胀元件的双面封隔器和安装在它们之间的阀门来实现的。在井壁上产生的额外切向应力保证了非弹性应变区的发展,导致井壁中横向裂缝的形成。本文介绍了用有限元法对安装封隔器的井眼附近岩石的应力应变状态进行数值模拟的结果。介绍了煤岩岩体水力冲击过程监测的技术和手段。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Methods of hydraulic fracturing of poorly caving roof and coal seams to eliminate dynamic phenomena in coal mines
The paper demonstrates the need to develop methods of managing poorly caving roofs in the stoping and development faces as well as the ways of intensifying the degassing process of unrelieved coal seams to improve the technical and economic performance and safety of operation. Methods of the directional hydraulic fracturing (DHF) of the roof and the interval hydraulic fracturing (IHF) of the coal seam are suggested to eliminate the dynamic phenomena in coal mines as well as technological charts of their implementation. The DHF method consists in creating an initiating slot in the borehole walls, which acts as a stress concentrator, followed by its sealing with an insulating device, i.e. a packer. When a fluid is injected into this slot, the tensile stresses are created in the borehole walls and the fracture is forced to develop in a predetermined direction. The IHF method of the coal seam from the development workings using non-cased degassing holes of large and variable diameter consists in creation of transverse hydraulic fractures in the hole relative to its axis and increasing its gas recovery by an order of magnitude. This is achieved by using a double-sided packer with elastically expanding elements and a valve installed between them. Additional tangential stresses created in the borehole walls ensure the development of inelastic strain zone, leading to the formation of transverse cracks in the borehole. The results of numerical modeling of the stress-and-strain state of the rocks near the borehole where packer seals are installed using the finite element method are presented in the paper. Techniques and means to monitor the processes of hydraulic impact on the coal-rock massif are shown.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Gornaya Promyshlennost
Gornaya Promyshlennost Engineering-Industrial and Manufacturing Engineering
CiteScore
1.10
自引率
0.00%
发文量
100
期刊最新文献
Forest industry of the mountainous region: assessment of territorial organization and risks for development (Tuva Republic case study) Changes in the seismic energy flow when mining deep levels (the Apatite Circus deposit, Khibiny Massif) Controlled operation of GP-200/11x500-m pump Analysis of factors limiting the efficiency of human protection against electric shocks in the power supply network of the mine site The effect of the quality of ammonium nitrate on the properties of emulsion explosives
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1