{"title":"量化早期维护集群的影响","authors":"J. K. Agergaard, K. V. Sigsgaard, N. Mortensen, J. Ge, K. B. Hansen","doi":"10.1108/jqme-07-2021-0056","DOIUrl":null,"url":null,"abstract":"PurposeThe purpose of this paper is to investigate the impact of early-stage maintenance clustering. Few researchers have previously studied early-stage maintenance clustering. Experience from product and service development has shown that early stages are critical to the development process, as most decisions are made during these stages. Similarly, most maintenance decisions are made during the early stages of maintenance development. Developing maintenance for clustering is expected to increase the potential of clustering.Design/methodology/approachA literature study and three case studies using the same data set were performed. The case studies simulate three stages of maintenance development by clustering based on the changes available at each given stage.FindingsThe study indicates an increased impact of maintenance clustering when clustering already in the first maintenance development stage. By performing clustering during the identification phase, 4.6% of the planned work hours can be saved. When clustering is done in the planning phase, 2.7% of the planned work hours can be saved. When planning is done in the scheduling phase, 2.4% of the planned work hours can be saved. The major difference in potential from the identification to the scheduling phase came from avoiding duplicate, unnecessary and erroneous work.Originality/valueThe findings from this study indicate a need for more studies on early-stage maintenance clustering, as few others have studied this.","PeriodicalId":16938,"journal":{"name":"Journal of Quality in Maintenance Engineering","volume":" ","pages":""},"PeriodicalIF":1.8000,"publicationDate":"2022-06-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Quantifying the impact of early-stage maintenance clustering\",\"authors\":\"J. K. Agergaard, K. V. Sigsgaard, N. Mortensen, J. Ge, K. B. Hansen\",\"doi\":\"10.1108/jqme-07-2021-0056\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"PurposeThe purpose of this paper is to investigate the impact of early-stage maintenance clustering. Few researchers have previously studied early-stage maintenance clustering. Experience from product and service development has shown that early stages are critical to the development process, as most decisions are made during these stages. Similarly, most maintenance decisions are made during the early stages of maintenance development. Developing maintenance for clustering is expected to increase the potential of clustering.Design/methodology/approachA literature study and three case studies using the same data set were performed. The case studies simulate three stages of maintenance development by clustering based on the changes available at each given stage.FindingsThe study indicates an increased impact of maintenance clustering when clustering already in the first maintenance development stage. By performing clustering during the identification phase, 4.6% of the planned work hours can be saved. When clustering is done in the planning phase, 2.7% of the planned work hours can be saved. When planning is done in the scheduling phase, 2.4% of the planned work hours can be saved. The major difference in potential from the identification to the scheduling phase came from avoiding duplicate, unnecessary and erroneous work.Originality/valueThe findings from this study indicate a need for more studies on early-stage maintenance clustering, as few others have studied this.\",\"PeriodicalId\":16938,\"journal\":{\"name\":\"Journal of Quality in Maintenance Engineering\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":1.8000,\"publicationDate\":\"2022-06-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Quality in Maintenance Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/jqme-07-2021-0056\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Quality in Maintenance Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/jqme-07-2021-0056","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 1

摘要

目的本文的目的是研究早期维护集群的影响。以前很少有研究人员研究过早期维护集群。产品和服务开发的经验表明,早期阶段对开发过程至关重要,因为大多数决策都是在这些阶段做出的。同样,大多数维护决策都是在维护开发的早期阶段做出的。开发集群维护有望增加集群的潜力。设计/方法/方法使用相同的数据集进行了一项文献研究和三项案例研究。案例研究通过基于每个给定阶段可用的更改进行聚类来模拟维护开发的三个阶段。发现该研究表明,当集群已经处于第一个维护开发阶段时,维护集群的影响会增加。通过在识别阶段执行集群,可以节省4.6%的计划工作时间。当在计划阶段进行集群时,可以节省2.7%的计划工作时间。当在计划阶段进行计划时,可以节省2.4%的计划工时。从识别到日程安排阶段的主要潜力差异来自于避免重复、不必要和错误的工作。原创性/价值这项研究的发现表明,需要对早期维护集群进行更多的研究,因为很少有其他人对此进行过研究。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Quantifying the impact of early-stage maintenance clustering
PurposeThe purpose of this paper is to investigate the impact of early-stage maintenance clustering. Few researchers have previously studied early-stage maintenance clustering. Experience from product and service development has shown that early stages are critical to the development process, as most decisions are made during these stages. Similarly, most maintenance decisions are made during the early stages of maintenance development. Developing maintenance for clustering is expected to increase the potential of clustering.Design/methodology/approachA literature study and three case studies using the same data set were performed. The case studies simulate three stages of maintenance development by clustering based on the changes available at each given stage.FindingsThe study indicates an increased impact of maintenance clustering when clustering already in the first maintenance development stage. By performing clustering during the identification phase, 4.6% of the planned work hours can be saved. When clustering is done in the planning phase, 2.7% of the planned work hours can be saved. When planning is done in the scheduling phase, 2.4% of the planned work hours can be saved. The major difference in potential from the identification to the scheduling phase came from avoiding duplicate, unnecessary and erroneous work.Originality/valueThe findings from this study indicate a need for more studies on early-stage maintenance clustering, as few others have studied this.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Quality in Maintenance Engineering
Journal of Quality in Maintenance Engineering Engineering-Safety, Risk, Reliability and Quality
CiteScore
4.00
自引率
13.30%
发文量
24
期刊介绍: This exciting journal looks at maintenance engineering from a positive standpoint, and clarifies its recently elevatedstatus as a highly technical, scientific, and complex field. Typical areas examined include: ■Budget and control ■Equipment management ■Maintenance information systems ■Process capability and maintenance ■Process monitoring techniques ■Reliability-based maintenance ■Replacement and life cycle costs ■TQM and maintenance
期刊最新文献
Spare parts management in industry 4.0 era: a literature review Data-driven decision-making in maintenance management and coordination throughout the asset life cycle: an empirical study Joint maintenance planning and production scheduling optimization model for green environment Identification of optimal maintenance parameters for best maintenance and service management system in the SMEs Modeling and solving the multi-objective energy-efficient production planning and scheduling with imperfect maintenance activities
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1