{"title":"施工合同纠纷的有效管理策略","authors":"C. Amoah, Hlatshwayo Nkosazana","doi":"10.1108/ijbpa-01-2022-0004","DOIUrl":null,"url":null,"abstract":"PurposeContract risk management has become a critical mission, as contract issues may lead to a loss of vast amounts of money to parties involved or cause project failure. This study sought to identify effective management strategies to mitigate construction contract issues that might emerge during construction.Design/methodology/approachA quantitative research approach was adopted for the study. Structured questionnaires made up of close-ended questions were distributed to construction professionals in South Africa via the SurveyMonkey platform. The data were then analysed using descriptive statistics.FindingsThe findings indicate that the critical sources of contract-related disputes are ambiguous definitions of the contract parties' scope of their rights and obligations, lack of precise arrangements regarding the calculation of contractual penalties for failure to meet the deadline, lack of detailed specification of the works and specific milestones, lack of provisions regulating changes to the project documentation during the construction stage, an excessive amount of contractual penalties on contractor's side and lack of provisions regarding the rules of performing additional and replacement works and their settlement. However, for these disputes to be effectively managed, strategies such as reduction uncertainties in project's phases, setting up contingency plans, construction guarantee, extension of time claims, payment guarantee, retention and escalation clause should be implemented by the parties involved.Research limitations/implicationsEven though the empirical study focused on construction professionals in South Africa, the findings could be applied to other countries outside of South Africa.Practical implicationsTo effectively manage and prevent contract disputes from averting project failures and losses to parties involved in the contract, construction professionals need to be aware of strategies that must be implemented before and during the project execution. If well implemented, these strategies will help a construction project be successful and experience fewer contractual disputes.Originality/valueThe study has identified the knowledge gap concerning suitable contract risk management strategies available for implementation to effectively prevent any contract parties from losing money, time and project failure.","PeriodicalId":44905,"journal":{"name":"International Journal of Building Pathology and Adaptation","volume":" ","pages":""},"PeriodicalIF":2.1000,"publicationDate":"2022-08-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Effective management strategies for construction contract disputes\",\"authors\":\"C. Amoah, Hlatshwayo Nkosazana\",\"doi\":\"10.1108/ijbpa-01-2022-0004\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"PurposeContract risk management has become a critical mission, as contract issues may lead to a loss of vast amounts of money to parties involved or cause project failure. This study sought to identify effective management strategies to mitigate construction contract issues that might emerge during construction.Design/methodology/approachA quantitative research approach was adopted for the study. Structured questionnaires made up of close-ended questions were distributed to construction professionals in South Africa via the SurveyMonkey platform. The data were then analysed using descriptive statistics.FindingsThe findings indicate that the critical sources of contract-related disputes are ambiguous definitions of the contract parties' scope of their rights and obligations, lack of precise arrangements regarding the calculation of contractual penalties for failure to meet the deadline, lack of detailed specification of the works and specific milestones, lack of provisions regulating changes to the project documentation during the construction stage, an excessive amount of contractual penalties on contractor's side and lack of provisions regarding the rules of performing additional and replacement works and their settlement. However, for these disputes to be effectively managed, strategies such as reduction uncertainties in project's phases, setting up contingency plans, construction guarantee, extension of time claims, payment guarantee, retention and escalation clause should be implemented by the parties involved.Research limitations/implicationsEven though the empirical study focused on construction professionals in South Africa, the findings could be applied to other countries outside of South Africa.Practical implicationsTo effectively manage and prevent contract disputes from averting project failures and losses to parties involved in the contract, construction professionals need to be aware of strategies that must be implemented before and during the project execution. If well implemented, these strategies will help a construction project be successful and experience fewer contractual disputes.Originality/valueThe study has identified the knowledge gap concerning suitable contract risk management strategies available for implementation to effectively prevent any contract parties from losing money, time and project failure.\",\"PeriodicalId\":44905,\"journal\":{\"name\":\"International Journal of Building Pathology and Adaptation\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":2.1000,\"publicationDate\":\"2022-08-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Building Pathology and Adaptation\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/ijbpa-01-2022-0004\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Building Pathology and Adaptation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/ijbpa-01-2022-0004","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
Effective management strategies for construction contract disputes
PurposeContract risk management has become a critical mission, as contract issues may lead to a loss of vast amounts of money to parties involved or cause project failure. This study sought to identify effective management strategies to mitigate construction contract issues that might emerge during construction.Design/methodology/approachA quantitative research approach was adopted for the study. Structured questionnaires made up of close-ended questions were distributed to construction professionals in South Africa via the SurveyMonkey platform. The data were then analysed using descriptive statistics.FindingsThe findings indicate that the critical sources of contract-related disputes are ambiguous definitions of the contract parties' scope of their rights and obligations, lack of precise arrangements regarding the calculation of contractual penalties for failure to meet the deadline, lack of detailed specification of the works and specific milestones, lack of provisions regulating changes to the project documentation during the construction stage, an excessive amount of contractual penalties on contractor's side and lack of provisions regarding the rules of performing additional and replacement works and their settlement. However, for these disputes to be effectively managed, strategies such as reduction uncertainties in project's phases, setting up contingency plans, construction guarantee, extension of time claims, payment guarantee, retention and escalation clause should be implemented by the parties involved.Research limitations/implicationsEven though the empirical study focused on construction professionals in South Africa, the findings could be applied to other countries outside of South Africa.Practical implicationsTo effectively manage and prevent contract disputes from averting project failures and losses to parties involved in the contract, construction professionals need to be aware of strategies that must be implemented before and during the project execution. If well implemented, these strategies will help a construction project be successful and experience fewer contractual disputes.Originality/valueThe study has identified the knowledge gap concerning suitable contract risk management strategies available for implementation to effectively prevent any contract parties from losing money, time and project failure.
期刊介绍:
The International Journal of Building Pathology and Adaptation publishes findings on contemporary and original research towards sustaining, maintaining and managing existing buildings. The journal provides an interdisciplinary approach to the study of buildings, their performance and adaptation in order to develop appropriate technical and management solutions. This requires an holistic understanding of the complex interactions between the materials, components, occupants, design and environment, demanding the application and development of methodologies for diagnosis, prognosis and treatment in this multidisciplinary area. With rapid technological developments, a changing climate and more extreme weather, coupled with developing societal demands, the challenges to the professions responsible are complex and varied; solutions need to be rigorously researched and tested to navigate the dynamic context in which today''s buildings are to be sustained. Within this context, the scope and coverage of the journal incorporates the following indicative topics: • Behavioural and human responses • Building defects and prognosis • Building adaptation and retrofit • Building conservation and restoration • Building Information Modelling (BIM) • Building and planning regulations and legislation • Building technology • Conflict avoidance, management and disputes resolution • Digital information and communication technologies • Education and training • Environmental performance • Energy management • Health, safety and welfare issues • Healthy enclosures • Innovations and innovative technologies • Law and practice of dilapidation • Maintenance and refurbishment • Materials testing • Policy formulation and development • Project management • Resilience • Structural considerations • Surveying methodologies and techniques • Sustainability and climate change • Valuation and financial investment