{"title":"临近推进长壁工作面动压巷道应力水力压裂控制大变形现场试验","authors":"Bing-xiang Huang, Xinglong Zhao, T. Sun","doi":"10.24425/ams.2019.131069","DOIUrl":null,"url":null,"abstract":"Influenced by the dynamic pressure of the front abutment pressure and the lateral abutment pressure, large deformation of surrounding rock occurs advancing working face in the entry heading adjacent to the active longwall mining face. Based on the cause analysis of entry large deformation, a new technology was put forward to solve the problem, and the designing method of drilling hole parameters for directional hydraulic fracturing was formed. Holes are drilled in the entry or in the high drainage entry to a certain rock layer over the adjacent working face, hydraulic cutting or slotting at the bottom of a borehole were also applied in advance to guide the hydraulic fractures extend in expected direction, through which the hard roof above the coal pillar can be cut off directionally. As a result, the stress concentration around the entry was transferred, and the entry was located in a destressing area. The field test at Majialiang coal mine indicates that the propagation length of cracks in single borehole is more than 15 m. After hydraulic fracturing, the large deformation range of the entry is reduced by 45 m, the average floor heave is reduced by 70%, and the average convergence of the entry’s two sides is reduced by 65%. Directional hydraulic fracturing has a better performance to control the large deformation of the dynamic pressure of the entry heading adjacent to the advancing coal face. Besides, it can improve the performance of the safety production.","PeriodicalId":55468,"journal":{"name":"Archives of Mining Sciences","volume":" ","pages":""},"PeriodicalIF":1.2000,"publicationDate":"2023-07-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Field Experiment of Destress Hydraulic Fracturing for Controlling the Large Deformation of the Dynamic Pressure Entry Heading Adjacent to the Advancing Longwall Face\",\"authors\":\"Bing-xiang Huang, Xinglong Zhao, T. Sun\",\"doi\":\"10.24425/ams.2019.131069\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Influenced by the dynamic pressure of the front abutment pressure and the lateral abutment pressure, large deformation of surrounding rock occurs advancing working face in the entry heading adjacent to the active longwall mining face. Based on the cause analysis of entry large deformation, a new technology was put forward to solve the problem, and the designing method of drilling hole parameters for directional hydraulic fracturing was formed. Holes are drilled in the entry or in the high drainage entry to a certain rock layer over the adjacent working face, hydraulic cutting or slotting at the bottom of a borehole were also applied in advance to guide the hydraulic fractures extend in expected direction, through which the hard roof above the coal pillar can be cut off directionally. As a result, the stress concentration around the entry was transferred, and the entry was located in a destressing area. The field test at Majialiang coal mine indicates that the propagation length of cracks in single borehole is more than 15 m. After hydraulic fracturing, the large deformation range of the entry is reduced by 45 m, the average floor heave is reduced by 70%, and the average convergence of the entry’s two sides is reduced by 65%. Directional hydraulic fracturing has a better performance to control the large deformation of the dynamic pressure of the entry heading adjacent to the advancing coal face. Besides, it can improve the performance of the safety production.\",\"PeriodicalId\":55468,\"journal\":{\"name\":\"Archives of Mining Sciences\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":1.2000,\"publicationDate\":\"2023-07-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Archives of Mining Sciences\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.24425/ams.2019.131069\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MINING & MINERAL PROCESSING\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Archives of Mining Sciences","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.24425/ams.2019.131069","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MINING & MINERAL PROCESSING","Score":null,"Total":0}
引用次数: 4

摘要

受前支承压力和侧支承压力动压的影响,临近长壁主动采煤工作面的巷道掘进工作面围岩发生较大变形。在分析巷道大变形原因的基础上,提出了解决该问题的新技术,形成了定向水力压裂钻孔参数设计方法。在邻近工作面上方某岩层的巷道或高排水巷道钻孔,并在钻孔底部提前进行水力切割或开槽,引导水力裂缝向预期方向延伸,定向切断煤柱上方硬顶板。结果表明,巷道周围应力集中发生转移,巷道处于去应力区。马家梁煤矿现场试验表明,单孔裂缝扩展长度大于15 m。水力压裂后,巷道大变形范围减小45 m,巷道底鼓平均减小70%,巷道两侧平均收敛减小65%。定向水力压裂对于控制临近推进工作面的巷道动压大变形具有较好的效果。此外,它还可以提高安全生产的性能。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Field Experiment of Destress Hydraulic Fracturing for Controlling the Large Deformation of the Dynamic Pressure Entry Heading Adjacent to the Advancing Longwall Face
Influenced by the dynamic pressure of the front abutment pressure and the lateral abutment pressure, large deformation of surrounding rock occurs advancing working face in the entry heading adjacent to the active longwall mining face. Based on the cause analysis of entry large deformation, a new technology was put forward to solve the problem, and the designing method of drilling hole parameters for directional hydraulic fracturing was formed. Holes are drilled in the entry or in the high drainage entry to a certain rock layer over the adjacent working face, hydraulic cutting or slotting at the bottom of a borehole were also applied in advance to guide the hydraulic fractures extend in expected direction, through which the hard roof above the coal pillar can be cut off directionally. As a result, the stress concentration around the entry was transferred, and the entry was located in a destressing area. The field test at Majialiang coal mine indicates that the propagation length of cracks in single borehole is more than 15 m. After hydraulic fracturing, the large deformation range of the entry is reduced by 45 m, the average floor heave is reduced by 70%, and the average convergence of the entry’s two sides is reduced by 65%. Directional hydraulic fracturing has a better performance to control the large deformation of the dynamic pressure of the entry heading adjacent to the advancing coal face. Besides, it can improve the performance of the safety production.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Archives of Mining Sciences
Archives of Mining Sciences 工程技术-矿业与矿物加工
CiteScore
2.40
自引率
16.70%
发文量
0
审稿时长
20 months
期刊介绍: Archives of Mining Sciences (AMS) is concerned with original research, new developments and case studies in mining sciences and energy, civil engineering and environmental engineering. The journal provides an international forum for the publication of high quality research results in: mining technologies, mineral processing, stability of mine workings, mining machine science, ventilation systems, rock mechanics, termodynamics, underground storage of oil and gas, mining and engineering geology, geotechnical engineering, tunnelling, design and construction of tunnels, design and construction on mining areas, mining geodesy, environmental protection in mining, revitalisation of postindustrial areas. Papers are welcomed on all relevant topics and especially on theoretical developments, analytical methods, numerical methods, rock testing, site investigation, and case studies.
期刊最新文献
Experimental Study of Lignite Structure Evolution Characteristics and Mechanisms under Thermal-Mechanical Co-function Landslide Survey at Cam Mountain (An Giang, Vietnam) by Seismic Refraction and GPR Methods Comparative Testing of Cable Bolt and Wire Rope Lacing Resistance to Static and Dynamic Loads Experimental Study on the Slime Flotation Process of Low-Rank Steam Coal by the Small Cone Angle Hydrocyclone Group Field Testing of the Methods for Prevention and Control of Coal and Gas Outburst – A Case Study in Poland
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1