{"title":"基于融合数据的两阶段模糊决策方法在风电场选址中的应用","authors":"A. Karaşan, Murat Çolak, Ayşenur Budak, I. Kaya","doi":"10.1080/14786451.2022.2092869","DOIUrl":null,"url":null,"abstract":"ABSTRACT Location selection for power plants operating with renewable energy is critical, and their locations directly affect performance and productivity. In this paper, a novel two-phased MCDM methodology based on z-fuzzy numbers with a better modelling capability by defining a confidence degree in decision-making problems is proposed to evaluate alternative locations for wind farm installation in Marmara Region, Turkey. As a result, while Çanakkale has been selected as the most suitable city, the alternative location named Biga has been determined as the most appropriate location in this city for wind farm installation. In addition, sensitivity and comparative analyses have been conducted to check the flexibility of the given decisions and verification of the weights of the criteria, respectively.","PeriodicalId":14406,"journal":{"name":"International Journal of Sustainable Energy","volume":"41 1","pages":"1694 - 1720"},"PeriodicalIF":2.0000,"publicationDate":"2022-06-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Wind farm location determination by using a two-phased fuzzy decision-making methodology based on fused data with a real case application\",\"authors\":\"A. Karaşan, Murat Çolak, Ayşenur Budak, I. Kaya\",\"doi\":\"10.1080/14786451.2022.2092869\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT Location selection for power plants operating with renewable energy is critical, and their locations directly affect performance and productivity. In this paper, a novel two-phased MCDM methodology based on z-fuzzy numbers with a better modelling capability by defining a confidence degree in decision-making problems is proposed to evaluate alternative locations for wind farm installation in Marmara Region, Turkey. As a result, while Çanakkale has been selected as the most suitable city, the alternative location named Biga has been determined as the most appropriate location in this city for wind farm installation. In addition, sensitivity and comparative analyses have been conducted to check the flexibility of the given decisions and verification of the weights of the criteria, respectively.\",\"PeriodicalId\":14406,\"journal\":{\"name\":\"International Journal of Sustainable Energy\",\"volume\":\"41 1\",\"pages\":\"1694 - 1720\"},\"PeriodicalIF\":2.0000,\"publicationDate\":\"2022-06-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Sustainable Energy\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/14786451.2022.2092869\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENERGY & FUELS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Sustainable Energy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/14786451.2022.2092869","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
Wind farm location determination by using a two-phased fuzzy decision-making methodology based on fused data with a real case application
ABSTRACT Location selection for power plants operating with renewable energy is critical, and their locations directly affect performance and productivity. In this paper, a novel two-phased MCDM methodology based on z-fuzzy numbers with a better modelling capability by defining a confidence degree in decision-making problems is proposed to evaluate alternative locations for wind farm installation in Marmara Region, Turkey. As a result, while Çanakkale has been selected as the most suitable city, the alternative location named Biga has been determined as the most appropriate location in this city for wind farm installation. In addition, sensitivity and comparative analyses have been conducted to check the flexibility of the given decisions and verification of the weights of the criteria, respectively.
期刊介绍:
Engineering and sustainable development are intrinsically linked. All capital plant and every consumable product depends on an engineering input through design, manufacture and operation, if not for the product itself then for the equipment required to process and transport the raw materials and the final product. Many aspects of sustainable development depend directly on appropriate and timely actions by engineers. Engineering is an extended process of analysis, synthesis, evaluation and execution and, therefore, it is argued that engineers must be involved from the outset of any proposal to develop sustainable solutions. Engineering embraces many disciplines and truly sustainable solutions are usually inter-disciplinary in nature.