大型项目用人单位非商业资源调度优化模型

IF 1.9 4区 管理学 Q3 ENGINEERING, INDUSTRIAL Engineering Management Journal Pub Date : 2021-01-27 DOI:10.1080/10429247.2020.1861855
Hui Feng, Jingchun Feng, Yanyan Yang
{"title":"大型项目用人单位非商业资源调度优化模型","authors":"Hui Feng, Jingchun Feng, Yanyan Yang","doi":"10.1080/10429247.2020.1861855","DOIUrl":null,"url":null,"abstract":"Abstract Non-commercial resources provided by employers (NCRPE) are the imperative factors affecting the progress of engineering projects. However, the NCRPE with limited supply ability is rarely considered in the schedule optimization models in previous studies. The NCRPE schedule requirement may exceed its limitation, resulting in failing to optimize the schedule. Therefore, a new schedule optimization model is built from the perspective of NCRPE. First, the features of NCRPE and corresponding optimization theory are analyzed. Then, two optimization models are proposed in multi-contract environment before and during the construction of a project, aiming to minimize the unbalance coefficient, variance of NCRPE, and the requirement strength of NCRPE, respectively. Finally, a case study about the South-North Water Transfer Project Program X is conducted. The results show that the proposed model could effectively solve the NCRPE schedule optimization problem. A reasonable and practical program planning and adjustment within different stakeholders can be obtained. The NCRPE schedule optimization can minimize the peak demand amount of the program resources and achieve a relatively balanced total resource demand before the program implementation. Besides, it ensures that the original production system capacity can satisfy the actual demand in the program implementation. The research results can provide a basis for the bidding of each contracted project in the program and the resources optimization of each contracted project in the program implementation process.","PeriodicalId":54353,"journal":{"name":"Engineering Management Journal","volume":"34 1","pages":"217 - 229"},"PeriodicalIF":1.9000,"publicationDate":"2021-01-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1080/10429247.2020.1861855","citationCount":"0","resultStr":"{\"title\":\"Optimization Model of Schedule-Non-Commercial Resources Provided by Employers of Large Project Programs\",\"authors\":\"Hui Feng, Jingchun Feng, Yanyan Yang\",\"doi\":\"10.1080/10429247.2020.1861855\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract Non-commercial resources provided by employers (NCRPE) are the imperative factors affecting the progress of engineering projects. However, the NCRPE with limited supply ability is rarely considered in the schedule optimization models in previous studies. The NCRPE schedule requirement may exceed its limitation, resulting in failing to optimize the schedule. Therefore, a new schedule optimization model is built from the perspective of NCRPE. First, the features of NCRPE and corresponding optimization theory are analyzed. Then, two optimization models are proposed in multi-contract environment before and during the construction of a project, aiming to minimize the unbalance coefficient, variance of NCRPE, and the requirement strength of NCRPE, respectively. Finally, a case study about the South-North Water Transfer Project Program X is conducted. The results show that the proposed model could effectively solve the NCRPE schedule optimization problem. A reasonable and practical program planning and adjustment within different stakeholders can be obtained. The NCRPE schedule optimization can minimize the peak demand amount of the program resources and achieve a relatively balanced total resource demand before the program implementation. Besides, it ensures that the original production system capacity can satisfy the actual demand in the program implementation. The research results can provide a basis for the bidding of each contracted project in the program and the resources optimization of each contracted project in the program implementation process.\",\"PeriodicalId\":54353,\"journal\":{\"name\":\"Engineering Management Journal\",\"volume\":\"34 1\",\"pages\":\"217 - 229\"},\"PeriodicalIF\":1.9000,\"publicationDate\":\"2021-01-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1080/10429247.2020.1861855\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Engineering Management Journal\",\"FirstCategoryId\":\"91\",\"ListUrlMain\":\"https://doi.org/10.1080/10429247.2020.1861855\",\"RegionNum\":4,\"RegionCategory\":\"管理学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering Management Journal","FirstCategoryId":"91","ListUrlMain":"https://doi.org/10.1080/10429247.2020.1861855","RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 0

摘要

摘要雇主提供的非商业资源是影响工程项目进度的必然因素。然而,在以往的研究中,在进度优化模型中很少考虑供应能力有限的NCRPE。NCRPE进度要求可能超出其限制,导致无法优化进度。因此,从NCRPE的角度建立了一个新的进度优化模型。首先,分析了NCRPE的特点及相应的优化理论。然后,在项目建设前和建设中的多合同环境下,分别提出了两个优化模型,旨在最小化NCRPE的不平衡系数、方差和需求强度。最后,对南水北调工程X方案进行了实例分析。结果表明,该模型能够有效地解决NCRPE调度优化问题。可以在不同的利益相关者中获得合理和实用的计划规划和调整。NCRPE进度优化可以最大限度地减少项目资源的峰值需求量,并在项目实施前实现相对平衡的总资源需求。此外,在方案实施中,保证了原有生产系统的生产能力能够满足实际需求。研究结果可为项目中各签约项目的招投标以及项目实施过程中各签约工程的资源优化提供依据。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Optimization Model of Schedule-Non-Commercial Resources Provided by Employers of Large Project Programs
Abstract Non-commercial resources provided by employers (NCRPE) are the imperative factors affecting the progress of engineering projects. However, the NCRPE with limited supply ability is rarely considered in the schedule optimization models in previous studies. The NCRPE schedule requirement may exceed its limitation, resulting in failing to optimize the schedule. Therefore, a new schedule optimization model is built from the perspective of NCRPE. First, the features of NCRPE and corresponding optimization theory are analyzed. Then, two optimization models are proposed in multi-contract environment before and during the construction of a project, aiming to minimize the unbalance coefficient, variance of NCRPE, and the requirement strength of NCRPE, respectively. Finally, a case study about the South-North Water Transfer Project Program X is conducted. The results show that the proposed model could effectively solve the NCRPE schedule optimization problem. A reasonable and practical program planning and adjustment within different stakeholders can be obtained. The NCRPE schedule optimization can minimize the peak demand amount of the program resources and achieve a relatively balanced total resource demand before the program implementation. Besides, it ensures that the original production system capacity can satisfy the actual demand in the program implementation. The research results can provide a basis for the bidding of each contracted project in the program and the resources optimization of each contracted project in the program implementation process.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Engineering Management Journal
Engineering Management Journal 工程技术-工程:工业
CiteScore
5.60
自引率
12.00%
发文量
27
审稿时长
>12 weeks
期刊介绍: EMJ is designed to provide practical, pertinent knowledge on the management of technology, technical professionals, and technical organizations. EMJ strives to provide value to the practice of engineering management and engineering managers. EMJ is an archival journal that facilitates both practitioners and university faculty in publishing useful articles. The primary focus is on articles that improve the practice of engineering management. To support the practice of engineering management, EMJ publishes papers within key engineering management content areas. EMJ Editors will continue to refine these areas to ensure they are aligned with the challenges faced by technical organizations and technical managers.
期刊最新文献
Lean Office: Proposition and Application of a Process-Mapping Method Based on the Shingo Production Mechanism (SPM) Managing Stakeholder Pressure for Megaproject Success and Green Innovation: The Key Role of Social Responsibility Engineering Management Education: Washington Accord Accreditation Programs The New PAD: A Method to Implement the Lean Construction Principles A Risk Minimization Model for a Multi-Skilled, Multi-Mode Resource-Constrained Project Scheduling Problem with Discrete Time-Cost-Quality-Risk Trade-Off
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1