马德里的“恶意房屋”及其转变为“现代”木结构建筑(1656-1868):原始建筑vs.添加结构

IF 0.4 4区 工程技术 Q4 CONSTRUCTION & BUILDING TECHNOLOGY Informes De La Construccion Pub Date : 2020-09-22 DOI:10.3989/IC.74057
E. González-Redondo
{"title":"马德里的“恶意房屋”及其转变为“现代”木结构建筑(1656-1868):原始建筑vs.添加结构","authors":"E. González-Redondo","doi":"10.3989/IC.74057","DOIUrl":null,"url":null,"abstract":"The dating of most buildings in the Historic Centre of Madrid is still unknown. The discovery and analysis of many old projects and the verification with the preserved buildings show that some apparently ‘modern’ are built on other pre-existing ones. In the garden of the ‘houses a la malicia’ (1560-1788), and before demolishing the city wall (1868), new bays, stairs and patios were built. Besides, new floors were added on the original double-layered facade walls and load-bearing timber-framed. The study and dating of case studies, determining its sectors, front and back; the dimensioning of the exterior and interior walls; and structure disagreements in the floor plans and cross-section will reveal this process. The ‘old’ construction features are verified, justifying their intact conservation in low-rise buildings; and in others, the formation of the patio, the addition of new floors, and their transformation into collective housing buildings.","PeriodicalId":54981,"journal":{"name":"Informes De La Construccion","volume":null,"pages":null},"PeriodicalIF":0.4000,"publicationDate":"2020-09-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Las “casas a la malicia” en Madrid y su transformación en edificios de entramado de madera “modernos” (1656-1868): construcciones originales vs. estructuras añadidas\",\"authors\":\"E. González-Redondo\",\"doi\":\"10.3989/IC.74057\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The dating of most buildings in the Historic Centre of Madrid is still unknown. The discovery and analysis of many old projects and the verification with the preserved buildings show that some apparently ‘modern’ are built on other pre-existing ones. In the garden of the ‘houses a la malicia’ (1560-1788), and before demolishing the city wall (1868), new bays, stairs and patios were built. Besides, new floors were added on the original double-layered facade walls and load-bearing timber-framed. The study and dating of case studies, determining its sectors, front and back; the dimensioning of the exterior and interior walls; and structure disagreements in the floor plans and cross-section will reveal this process. The ‘old’ construction features are verified, justifying their intact conservation in low-rise buildings; and in others, the formation of the patio, the addition of new floors, and their transformation into collective housing buildings.\",\"PeriodicalId\":54981,\"journal\":{\"name\":\"Informes De La Construccion\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.4000,\"publicationDate\":\"2020-09-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Informes De La Construccion\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.3989/IC.74057\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Informes De La Construccion","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.3989/IC.74057","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 2

摘要

马德里历史中心的大多数建筑的年代仍然未知。对许多旧项目的发现和分析,以及对保存下来的建筑的验证表明,一些明显“现代”的建筑是在其他已有建筑的基础上建造的。在“马利西亚之家”(1560-1788)的花园里,在拆除城墙(1868)之前,建造了新的海湾、楼梯和天井。此外,在原来的双层外墙和承重木框架上增加了新的地板。案例研究的研究和年代测定,确定其前后部门;外墙和内墙的尺寸;平面图和横截面中的结构分歧将揭示这一过程。“古老”的建筑特征得到了验证,证明了它们在低层建筑中的完整保护;在其他方面,庭院的形成,新楼层的增加,以及它们被改造成集体住宅。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Las “casas a la malicia” en Madrid y su transformación en edificios de entramado de madera “modernos” (1656-1868): construcciones originales vs. estructuras añadidas
The dating of most buildings in the Historic Centre of Madrid is still unknown. The discovery and analysis of many old projects and the verification with the preserved buildings show that some apparently ‘modern’ are built on other pre-existing ones. In the garden of the ‘houses a la malicia’ (1560-1788), and before demolishing the city wall (1868), new bays, stairs and patios were built. Besides, new floors were added on the original double-layered facade walls and load-bearing timber-framed. The study and dating of case studies, determining its sectors, front and back; the dimensioning of the exterior and interior walls; and structure disagreements in the floor plans and cross-section will reveal this process. The ‘old’ construction features are verified, justifying their intact conservation in low-rise buildings; and in others, the formation of the patio, the addition of new floors, and their transformation into collective housing buildings.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Informes De La Construccion
Informes De La Construccion 工程技术-结构与建筑技术
CiteScore
0.90
自引率
16.70%
发文量
49
审稿时长
6-12 weeks
期刊介绍: Founded in 1948 by the Instituto Técnico de la Construcción y del Cemento, Informes de la Construcción is a scientific journal issued quarterly. Its articles cover fields such as architecture, engineering, public works, environment, building services, rehabilitation, construction systems, testing techniques, results of research on building components and systems and so forth. Journal"s readership includes architects, engineers and construction companies, as well as researchers and professionals engaging in building construction and public works.
期刊最新文献
El módulo y el sistema: celosías funcionales en el complejo de la Hidrola en Escombreras Las cubiertas planas de tierra en la comarca del Campo de Cartagena (España). Caracterización material y definición constructiva Indoor air quality in naturally ventilated dwellings in Spain Guarino Guarini y el proyecto de escaleras en los tratados italianos Creación de un parque urbano Nuevo índice ASD con un coeficiente de distribución espacial (Estudio de caso: región 1 de Teherán)
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1