使用ReFH模型估算英国集水区可能的最大洪水

Q4 Earth and Planetary Sciences Dams and Reservoirs Pub Date : 2020-09-23 DOI:10.1680/JDARE.20.00015
Samuel Pucknell, T. Kjeldsen, T. Haxton, J. Jeans, A. Young
{"title":"使用ReFH模型估算英国集水区可能的最大洪水","authors":"Samuel Pucknell, T. Kjeldsen, T. Haxton, J. Jeans, A. Young","doi":"10.1680/JDARE.20.00015","DOIUrl":null,"url":null,"abstract":"This paper presents a first attempt at formulating a complete framework for estimating the probable maximum flood (PMF) in UK catchments using the revitalised flood hydrograph (ReFH) model. The fra...","PeriodicalId":39070,"journal":{"name":"Dams and Reservoirs","volume":"30 1","pages":"85-90"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1680/JDARE.20.00015","citationCount":"0","resultStr":"{\"title\":\"Estimating the probable maximum flood in UK catchments using the ReFH model\",\"authors\":\"Samuel Pucknell, T. Kjeldsen, T. Haxton, J. Jeans, A. Young\",\"doi\":\"10.1680/JDARE.20.00015\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents a first attempt at formulating a complete framework for estimating the probable maximum flood (PMF) in UK catchments using the revitalised flood hydrograph (ReFH) model. The fra...\",\"PeriodicalId\":39070,\"journal\":{\"name\":\"Dams and Reservoirs\",\"volume\":\"30 1\",\"pages\":\"85-90\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-09-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1680/JDARE.20.00015\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Dams and Reservoirs\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1680/JDARE.20.00015\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Earth and Planetary Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Dams and Reservoirs","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/JDARE.20.00015","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}
引用次数: 0

摘要

本文提出了第一次尝试,在制定一个完整的框架,估计可能的最大洪水(PMF)在英国集水区使用恢复洪水水文(ReFH)模型。联邦铁路局……
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Estimating the probable maximum flood in UK catchments using the ReFH model
This paper presents a first attempt at formulating a complete framework for estimating the probable maximum flood (PMF) in UK catchments using the revitalised flood hydrograph (ReFH) model. The fra...
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Dams and Reservoirs
Dams and Reservoirs Earth and Planetary Sciences-Geotechnical Engineering and Engineering Geology
CiteScore
0.50
自引率
0.00%
发文量
30
期刊最新文献
Leeds FAS2 FSR: environmental challenges for the design of an in-river control structure Simulating a reservoir on-site flood plan test: Operation Redbrook Dunside reservoirs discontinuance – taking a new approach Undertaking RARS assessments for Hong Kong reservoirs Assessment the stability of earth dams based on construction pace by fuzzy inference logic
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1