{"title":"基于可靠性的船舶图纸规划新方法","authors":"Rajko Rubeša, T. Matulja, M. Hadjina, N. Fafandjel","doi":"10.5957/JSPD.11180042","DOIUrl":null,"url":null,"abstract":"Integration of ship design and ship production is necessary for an efficient shipbuilding process, although it requires very complex documentation planning in particular regarding its level of information and the completion scheduling. Optimally organized documentation planning could largely influence the shipbuilding total cost and lead time. Drawings finished with higher level of unreliability are shortening design phase but could result with major repair and rework activities that could increase production time and cost. On the other hand, insisting on fully completed drawings will increase design-stage time and will minimize repair and rework activities, but not necessarily the shipbuilding cost and lead time. This study researches drawing designing sequence and its unreliability due to designing with unknown, incomplete, or unreliable information. Therefore, analysis of documentation planning is performed based on their interdependence, production requirements, production technology level, and labor costs. Finally, a new approach for ship's drawings planning based on the drawing's reliability is proposed with support of developed computer application. Such approach calculates unreliability of interdependent drawings and proposes optimal documentation package regarding its level of information and lunching sequence toward production process.","PeriodicalId":48791,"journal":{"name":"Journal of Ship Production and Design","volume":"36 1","pages":"280-290"},"PeriodicalIF":0.5000,"publicationDate":"2020-11-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"New Approach for Ship Drawing Planning Based on Their Reliability\",\"authors\":\"Rajko Rubeša, T. Matulja, M. Hadjina, N. Fafandjel\",\"doi\":\"10.5957/JSPD.11180042\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Integration of ship design and ship production is necessary for an efficient shipbuilding process, although it requires very complex documentation planning in particular regarding its level of information and the completion scheduling. Optimally organized documentation planning could largely influence the shipbuilding total cost and lead time. Drawings finished with higher level of unreliability are shortening design phase but could result with major repair and rework activities that could increase production time and cost. On the other hand, insisting on fully completed drawings will increase design-stage time and will minimize repair and rework activities, but not necessarily the shipbuilding cost and lead time. This study researches drawing designing sequence and its unreliability due to designing with unknown, incomplete, or unreliable information. Therefore, analysis of documentation planning is performed based on their interdependence, production requirements, production technology level, and labor costs. Finally, a new approach for ship's drawings planning based on the drawing's reliability is proposed with support of developed computer application. Such approach calculates unreliability of interdependent drawings and proposes optimal documentation package regarding its level of information and lunching sequence toward production process.\",\"PeriodicalId\":48791,\"journal\":{\"name\":\"Journal of Ship Production and Design\",\"volume\":\"36 1\",\"pages\":\"280-290\"},\"PeriodicalIF\":0.5000,\"publicationDate\":\"2020-11-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Ship Production and Design\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.5957/JSPD.11180042\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, MARINE\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Ship Production and Design","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.5957/JSPD.11180042","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, MARINE","Score":null,"Total":0}
New Approach for Ship Drawing Planning Based on Their Reliability
Integration of ship design and ship production is necessary for an efficient shipbuilding process, although it requires very complex documentation planning in particular regarding its level of information and the completion scheduling. Optimally organized documentation planning could largely influence the shipbuilding total cost and lead time. Drawings finished with higher level of unreliability are shortening design phase but could result with major repair and rework activities that could increase production time and cost. On the other hand, insisting on fully completed drawings will increase design-stage time and will minimize repair and rework activities, but not necessarily the shipbuilding cost and lead time. This study researches drawing designing sequence and its unreliability due to designing with unknown, incomplete, or unreliable information. Therefore, analysis of documentation planning is performed based on their interdependence, production requirements, production technology level, and labor costs. Finally, a new approach for ship's drawings planning based on the drawing's reliability is proposed with support of developed computer application. Such approach calculates unreliability of interdependent drawings and proposes optimal documentation package regarding its level of information and lunching sequence toward production process.
期刊介绍:
Original and timely technical papers addressing problems of shipyard techniques and production of merchant and naval ships appear in this quarterly publication. Since its inception, the Journal of Ship Production and Design (formerly the Journal of Ship Production) has been a forum for peer-reviewed, professionally edited papers from academic and industry sources. As such it has influenced the worldwide development of ship production engineering as a fully qualified professional discipline. The expanded scope seeks papers in additional areas, specifically ship design, including design for production, plus other marine technology topics, such as ship operations, shipping economics, and safety. Each issue contains a well-rounded selection of technical papers relevant to marine professionals.