{"title":"使用多任务机器对多个切割区块的森林采伐作业进行调度","authors":"Rohit Arora, T. Sowlati, Joel Mortyn","doi":"10.1080/14942119.2023.2229708","DOIUrl":null,"url":null,"abstract":"ABSTRACT The modernization of forest harvesting operations has significantly increased the cost of machine ownership and has turned forest harvesting into a capital-intensive process. To increase productivity and profitability, some companies have acquired multi-task harvesting machines. While many previous papers focused on optimizing the harvest scheduling to reduce the costs of harvesting, the assignment of multi-task machines was not considered in their models. In this work, an optimization model is developed for the detailed scheduling of harvesting activities on multiple cut blocks using multi-task machines. This model is a continuation of previous work on detailed harvest scheduling. It prescribes the start time and the end time of operations of each machine at each cut block, the number of machines to be assigned for each harvesting activity at each cut block, the cut block that the machine should move to after completing its operation at a cut block, and the type of activity it should perform. It is applied to a case study of a forest company in Canada. According to the results, the total harvesting cost decreased by Can$ 25,000 when multi-task machines were used compared to exclusive machines, due to less machine movement and the need for fewer machines.","PeriodicalId":55998,"journal":{"name":"International Journal of Forest Engineering","volume":null,"pages":null},"PeriodicalIF":2.1000,"publicationDate":"2023-07-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Scheduling of forest harvesting operations on multiple cut blocks using multi-task machines\",\"authors\":\"Rohit Arora, T. Sowlati, Joel Mortyn\",\"doi\":\"10.1080/14942119.2023.2229708\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT The modernization of forest harvesting operations has significantly increased the cost of machine ownership and has turned forest harvesting into a capital-intensive process. To increase productivity and profitability, some companies have acquired multi-task harvesting machines. While many previous papers focused on optimizing the harvest scheduling to reduce the costs of harvesting, the assignment of multi-task machines was not considered in their models. In this work, an optimization model is developed for the detailed scheduling of harvesting activities on multiple cut blocks using multi-task machines. This model is a continuation of previous work on detailed harvest scheduling. It prescribes the start time and the end time of operations of each machine at each cut block, the number of machines to be assigned for each harvesting activity at each cut block, the cut block that the machine should move to after completing its operation at a cut block, and the type of activity it should perform. It is applied to a case study of a forest company in Canada. According to the results, the total harvesting cost decreased by Can$ 25,000 when multi-task machines were used compared to exclusive machines, due to less machine movement and the need for fewer machines.\",\"PeriodicalId\":55998,\"journal\":{\"name\":\"International Journal of Forest Engineering\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":2.1000,\"publicationDate\":\"2023-07-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Forest Engineering\",\"FirstCategoryId\":\"97\",\"ListUrlMain\":\"https://doi.org/10.1080/14942119.2023.2229708\",\"RegionNum\":3,\"RegionCategory\":\"农林科学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"FORESTRY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Forest Engineering","FirstCategoryId":"97","ListUrlMain":"https://doi.org/10.1080/14942119.2023.2229708","RegionNum":3,"RegionCategory":"农林科学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"FORESTRY","Score":null,"Total":0}
引用次数: 0
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Scheduling of forest harvesting operations on multiple cut blocks using multi-task machines
ABSTRACT The modernization of forest harvesting operations has significantly increased the cost of machine ownership and has turned forest harvesting into a capital-intensive process. To increase productivity and profitability, some companies have acquired multi-task harvesting machines. While many previous papers focused on optimizing the harvest scheduling to reduce the costs of harvesting, the assignment of multi-task machines was not considered in their models. In this work, an optimization model is developed for the detailed scheduling of harvesting activities on multiple cut blocks using multi-task machines. This model is a continuation of previous work on detailed harvest scheduling. It prescribes the start time and the end time of operations of each machine at each cut block, the number of machines to be assigned for each harvesting activity at each cut block, the cut block that the machine should move to after completing its operation at a cut block, and the type of activity it should perform. It is applied to a case study of a forest company in Canada. According to the results, the total harvesting cost decreased by Can$ 25,000 when multi-task machines were used compared to exclusive machines, due to less machine movement and the need for fewer machines.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.70
自引率
21.10%
发文量
33
期刊最新文献
Productivity benchmarks for unguyed excavator-based tower yarders Novel approach for forest road maintenance using smartphone sensor data and deep learning methods Machine learning applications in forest and biomass supply chain management: a review Mechanical site preparation in South Africa: comparing the productivity of pitting machine operators under different site conditions Stem recovery and harvesting productivity of two different harvesting systems in final felling of Pinus patula
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1