商业建筑倾斜施工的可行性评价

Q2 Business, Management and Accounting Journal of Engineering Project and Production Management Pub Date : 2020-03-27 DOI:10.2478/jeppm-2020-0016
Chipozya Tembo Silungwe, Festus C. Luwaya
{"title":"商业建筑倾斜施工的可行性评价","authors":"Chipozya Tembo Silungwe, Festus C. Luwaya","doi":"10.2478/jeppm-2020-0016","DOIUrl":null,"url":null,"abstract":"Abstract Construction projects are much appreciated by both client and contractor when completed on schedule and within budget so as to avoid cost overruns. The Zambian building sector normally experiences time and cost overruns. This study investigated the feasibility of using tilt-up construction in the construction of commercial building walls. The methodology used consisted of a literature review, a questionnaire survey and a scenario analysis consisting of a hypothetical 4900 square meter commercial building with a height of 8 meters. Sixty-six questionnaires were administered to design professionals operating in the Zambian building sector using simple random sampling and thirty-six were returned giving a response rate of 55%. The data were analyzed using descriptive statistics. Cost analysis was done on a hypothetical building as no contractor was found using tilt-up construction in the construction sector. The study established that tilt-up was, in fact, more expensive than the conventional methods (concrete blocks and in-situ reinforced concrete walls), but it was faster, hence, making it viable in respect to time and not cost in the Zambian construction industry (ZCI). Additionally, necessary expertise was available with the exception of a certified tilt-up practitioner and a sealant sub-contractor in cases where a sealant contractor is needed. The study has identified that currently in the Zambian building sector tilt-up construction can be used when time is more important than the cost. However, challenges such as site size (limited space), the unavailability of building regulation for tilt-up construction and the economic capacity of the client or capacity need to be addressed for enhancing the practical application of tilt-up construction in ZCI.","PeriodicalId":53274,"journal":{"name":"Journal of Engineering Project and Production Management","volume":"10 1","pages":"141 - 146"},"PeriodicalIF":0.0000,"publicationDate":"2020-03-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Feasibility Assessment of Tilt-Up Construction in Commercial Buildings\",\"authors\":\"Chipozya Tembo Silungwe, Festus C. Luwaya\",\"doi\":\"10.2478/jeppm-2020-0016\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract Construction projects are much appreciated by both client and contractor when completed on schedule and within budget so as to avoid cost overruns. The Zambian building sector normally experiences time and cost overruns. This study investigated the feasibility of using tilt-up construction in the construction of commercial building walls. The methodology used consisted of a literature review, a questionnaire survey and a scenario analysis consisting of a hypothetical 4900 square meter commercial building with a height of 8 meters. Sixty-six questionnaires were administered to design professionals operating in the Zambian building sector using simple random sampling and thirty-six were returned giving a response rate of 55%. The data were analyzed using descriptive statistics. Cost analysis was done on a hypothetical building as no contractor was found using tilt-up construction in the construction sector. The study established that tilt-up was, in fact, more expensive than the conventional methods (concrete blocks and in-situ reinforced concrete walls), but it was faster, hence, making it viable in respect to time and not cost in the Zambian construction industry (ZCI). Additionally, necessary expertise was available with the exception of a certified tilt-up practitioner and a sealant sub-contractor in cases where a sealant contractor is needed. The study has identified that currently in the Zambian building sector tilt-up construction can be used when time is more important than the cost. However, challenges such as site size (limited space), the unavailability of building regulation for tilt-up construction and the economic capacity of the client or capacity need to be addressed for enhancing the practical application of tilt-up construction in ZCI.\",\"PeriodicalId\":53274,\"journal\":{\"name\":\"Journal of Engineering Project and Production Management\",\"volume\":\"10 1\",\"pages\":\"141 - 146\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-03-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Engineering Project and Production Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/jeppm-2020-0016\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Business, Management and Accounting\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering Project and Production Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/jeppm-2020-0016","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Business, Management and Accounting","Score":null,"Total":0}
引用次数: 2

摘要

摘要建设项目在预算内如期完成,以避免成本超支,深受业主和承包商的赞赏。赞比亚建筑业通常会出现时间和成本超支的情况。本研究调查了在商业建筑墙体施工中使用倾斜结构的可行性。所使用的方法包括文献综述、问卷调查和情景分析,其中包括一栋4900平方米、高8米的假设商业建筑。采用简单随机抽样的方法,对赞比亚建筑行业的设计专业人员进行了66份问卷调查,其中36份得到回复,回复率为55%。使用描述性统计对数据进行分析。由于没有发现承包商在建筑行业使用倾斜结构,因此对一栋假设建筑进行了成本分析。该研究表明,事实上,倾斜比传统方法(混凝土块和现浇钢筋混凝土墙)更昂贵,但速度更快,因此在赞比亚建筑业(ZCI)中,它在时间而非成本方面是可行的。此外,在需要密封剂承包商的情况下,除了经过认证的倾斜从业者和密封剂分包商外,还提供了必要的专业知识。该研究表明,目前在赞比亚建筑行业,当时间比成本更重要时,可以使用倾斜式建筑。然而,需要解决场地大小(空间有限)、倾斜施工的建筑法规不可用以及客户的经济能力或能力等挑战,以加强倾斜施工在ZCI中的实际应用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Feasibility Assessment of Tilt-Up Construction in Commercial Buildings
Abstract Construction projects are much appreciated by both client and contractor when completed on schedule and within budget so as to avoid cost overruns. The Zambian building sector normally experiences time and cost overruns. This study investigated the feasibility of using tilt-up construction in the construction of commercial building walls. The methodology used consisted of a literature review, a questionnaire survey and a scenario analysis consisting of a hypothetical 4900 square meter commercial building with a height of 8 meters. Sixty-six questionnaires were administered to design professionals operating in the Zambian building sector using simple random sampling and thirty-six were returned giving a response rate of 55%. The data were analyzed using descriptive statistics. Cost analysis was done on a hypothetical building as no contractor was found using tilt-up construction in the construction sector. The study established that tilt-up was, in fact, more expensive than the conventional methods (concrete blocks and in-situ reinforced concrete walls), but it was faster, hence, making it viable in respect to time and not cost in the Zambian construction industry (ZCI). Additionally, necessary expertise was available with the exception of a certified tilt-up practitioner and a sealant sub-contractor in cases where a sealant contractor is needed. The study has identified that currently in the Zambian building sector tilt-up construction can be used when time is more important than the cost. However, challenges such as site size (limited space), the unavailability of building regulation for tilt-up construction and the economic capacity of the client or capacity need to be addressed for enhancing the practical application of tilt-up construction in ZCI.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Engineering Project and Production Management
Journal of Engineering Project and Production Management Business, Management and Accounting-Business, Management and Accounting (miscellaneous)
CiteScore
2.30
自引率
0.00%
发文量
24
审稿时长
30 weeks
期刊最新文献
Condition-based Maintenance Using BIM: A Case Study of Energy Modeling for a Residential Building Comparative Evaluation of Road Safety Level and Geometric Design Consistency Digitalization and Engineering Management for the Next-Era Industries Pandemic Effect on the Industry 4.0 Readiness: A Case Study in Vietnamese Industry Internet of Things (IoT) Impact on Facility Management of Office Buildings: A Qualitative Study
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1