西方和非西方国家的公私伙伴关系:寻找相关性

Fadhli Zul Fauzi, B. Kusumasari
{"title":"西方和非西方国家的公私伙伴关系:寻找相关性","authors":"Fadhli Zul Fauzi, B. Kusumasari","doi":"10.1108/jfmpc-08-2019-0071","DOIUrl":null,"url":null,"abstract":"\nPurpose\nThis paper aims to compare the implementation of public–private partnership (PPP) in Western and non-Western countries by analyzing several predetermined aspects such as government and political system, PPP’s model of agreement, political commitment and the role of PPP supporting unit.\n\n\nDesign/methodology/approach\nThis study uses comparative case studies to compare the implementation of PPP in seven Western and non-Western countries by using various appropriate data such as frequently used agreements, government systems, political commitments and PPP-supporting units to understand the extent of differences in the success of PPP implementation found in each country.\n\n\nFindings\nThe results reveal that the implementation of PPPs in Western and non-Western countries do not significantly differ, except for in the instance of political commitments. Political interventions in PPP implementation still frequently occurred in non-Western countries, which consequently disrupted the implementation of PPP itself.\n\n\nOriginality/value\nPrevious comparison of PPP studies only focused on the implementation of PPP without analyzing the political context in each country. One of the contributions that this paper will bring to the conversations around PPP is that the implementation of PPP will be analyzed with regard to political contexts.\n","PeriodicalId":45720,"journal":{"name":"Journal of Financial Management of Property and Construction","volume":" ","pages":""},"PeriodicalIF":1.2000,"publicationDate":"2020-09-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1108/jfmpc-08-2019-0071","citationCount":"3","resultStr":"{\"title\":\"Public-private partnership in Western and non-Western countries: a search for relevance\",\"authors\":\"Fadhli Zul Fauzi, B. Kusumasari\",\"doi\":\"10.1108/jfmpc-08-2019-0071\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\nPurpose\\nThis paper aims to compare the implementation of public–private partnership (PPP) in Western and non-Western countries by analyzing several predetermined aspects such as government and political system, PPP’s model of agreement, political commitment and the role of PPP supporting unit.\\n\\n\\nDesign/methodology/approach\\nThis study uses comparative case studies to compare the implementation of PPP in seven Western and non-Western countries by using various appropriate data such as frequently used agreements, government systems, political commitments and PPP-supporting units to understand the extent of differences in the success of PPP implementation found in each country.\\n\\n\\nFindings\\nThe results reveal that the implementation of PPPs in Western and non-Western countries do not significantly differ, except for in the instance of political commitments. Political interventions in PPP implementation still frequently occurred in non-Western countries, which consequently disrupted the implementation of PPP itself.\\n\\n\\nOriginality/value\\nPrevious comparison of PPP studies only focused on the implementation of PPP without analyzing the political context in each country. One of the contributions that this paper will bring to the conversations around PPP is that the implementation of PPP will be analyzed with regard to political contexts.\\n\",\"PeriodicalId\":45720,\"journal\":{\"name\":\"Journal of Financial Management of Property and Construction\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":1.2000,\"publicationDate\":\"2020-09-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1108/jfmpc-08-2019-0071\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Financial Management of Property and Construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/jfmpc-08-2019-0071\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"BUSINESS, FINANCE\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Financial Management of Property and Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/jfmpc-08-2019-0071","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"BUSINESS, FINANCE","Score":null,"Total":0}
引用次数: 3

摘要

目的本文旨在通过分析政府和政治制度、公私伙伴关系的协议模式、政治承诺和公私伙伴关系支持单位的作用等几个预先确定的方面,比较西方和非西方国家公私伙伴关系(PPP)的实施情况。设计/方法/方法本研究使用比较案例研究,通过使用各种适当的数据,如经常使用的协议、政府制度、政治承诺和PPP支持单位,比较七个西方和非西方国家的PPP实施情况,以了解每个国家PPP实施成功的差异程度。结果表明,西方国家和非西方国家的购买力平价实施情况没有显著差异,政治承诺除外。在非西方国家,对PPP实施的政治干预仍然频繁发生,从而扰乱了PPP本身的实施。独创性/价值以往对购买力平价研究的比较只关注购买力平价的实施,而没有分析每个国家的政治背景。本文将为围绕PPP的对话带来的贡献之一是,将从政治背景来分析PPP的实施。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Public-private partnership in Western and non-Western countries: a search for relevance
Purpose This paper aims to compare the implementation of public–private partnership (PPP) in Western and non-Western countries by analyzing several predetermined aspects such as government and political system, PPP’s model of agreement, political commitment and the role of PPP supporting unit. Design/methodology/approach This study uses comparative case studies to compare the implementation of PPP in seven Western and non-Western countries by using various appropriate data such as frequently used agreements, government systems, political commitments and PPP-supporting units to understand the extent of differences in the success of PPP implementation found in each country. Findings The results reveal that the implementation of PPPs in Western and non-Western countries do not significantly differ, except for in the instance of political commitments. Political interventions in PPP implementation still frequently occurred in non-Western countries, which consequently disrupted the implementation of PPP itself. Originality/value Previous comparison of PPP studies only focused on the implementation of PPP without analyzing the political context in each country. One of the contributions that this paper will bring to the conversations around PPP is that the implementation of PPP will be analyzed with regard to political contexts.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.70
自引率
0.00%
发文量
17
期刊最新文献
Managing supply chain disruptions in the construction industry: an institutional approach Assessing risk allocation preferences of partners in international construction joint venture projects in Ghana Impact of time-based delay on public-private partnership (PPP) construction project delivery: construction stakeholders’ perspective Drivers for the adoption of building information modelling (BIM) for post-construction management in the Nigerian AECO industry Risk assessment for 3D printing in construction projects
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1