基于分解的多异构易腐产品生产线批量调度问题研究

Q4 Decision Sciences Pesquisa Operacional Pub Date : 2021-06-11 DOI:10.1590/0101-7438.2021.041S1.00240377
W. A. O. Soler, M. Santos, K. Akartunalı
{"title":"基于分解的多异构易腐产品生产线批量调度问题研究","authors":"W. A. O. Soler, M. Santos, K. Akartunalı","doi":"10.1590/0101-7438.2021.041S1.00240377","DOIUrl":null,"url":null,"abstract":"ABSTRACT In this paper, we propose a novel MIP-based heuristic method to deal with a lot sizing and scheduling problem with multiple heterogeneous production lines in a production setting with perishable items. The problem is inspired by the production processes adopted by some Brazilian food industries and it considers that several production lines share the same scarce production resources. Therefore, only a subset of those lines can simultaneously operate in each production period. Moreover, the production environment is characterized by the existence of sequence-dependent setup times and costs, and by the production of perishable items which can be stocked for a short period only. Firstly, we propose a facility location reformulation for a model previously proposed in the literature. Secondly, we propose a heuristic composed of two phases. The first phase has an elaborated approach to building feasible solutions solving initially an aggregated lot sizing problem to decide which production lines to assemble, followed by the resolution of the various single line lot sizing and scheduling problems. The second phase applies improvement heuristics exploring principles of fix-and-optimize and local branching procedures. Computational results carried out using a data set proposed in the literature are presented in order to study the efficiency of the proposed approach. The results demonstrate that our heuristics provide superior results when benchmarked with a heuristic from the literature specifically developed to solve the problem under consideration, and with a commercial MIP solver.","PeriodicalId":35341,"journal":{"name":"Pesquisa Operacional","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-06-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"DECOMPOSITION BASED HEURISTICS FOR A LOT SIZING AND SCHEDULING PROBLEM ON MULTIPLE HETEROGENEOUS PRODUCTION LINES WITH PERISHABLE PRODUCTS\",\"authors\":\"W. A. O. Soler, M. Santos, K. Akartunalı\",\"doi\":\"10.1590/0101-7438.2021.041S1.00240377\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT In this paper, we propose a novel MIP-based heuristic method to deal with a lot sizing and scheduling problem with multiple heterogeneous production lines in a production setting with perishable items. The problem is inspired by the production processes adopted by some Brazilian food industries and it considers that several production lines share the same scarce production resources. Therefore, only a subset of those lines can simultaneously operate in each production period. Moreover, the production environment is characterized by the existence of sequence-dependent setup times and costs, and by the production of perishable items which can be stocked for a short period only. Firstly, we propose a facility location reformulation for a model previously proposed in the literature. Secondly, we propose a heuristic composed of two phases. The first phase has an elaborated approach to building feasible solutions solving initially an aggregated lot sizing problem to decide which production lines to assemble, followed by the resolution of the various single line lot sizing and scheduling problems. The second phase applies improvement heuristics exploring principles of fix-and-optimize and local branching procedures. Computational results carried out using a data set proposed in the literature are presented in order to study the efficiency of the proposed approach. The results demonstrate that our heuristics provide superior results when benchmarked with a heuristic from the literature specifically developed to solve the problem under consideration, and with a commercial MIP solver.\",\"PeriodicalId\":35341,\"journal\":{\"name\":\"Pesquisa Operacional\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-06-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Pesquisa Operacional\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1590/0101-7438.2021.041S1.00240377\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Decision Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Pesquisa Operacional","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1590/0101-7438.2021.041S1.00240377","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Decision Sciences","Score":null,"Total":0}
引用次数: 0

摘要

摘要在本文中,我们提出了一种新的基于MIP的启发式方法来处理在具有易腐物品的生产环境中具有多条异构生产线的批量确定和调度问题。这个问题的灵感来自巴西一些食品行业采用的生产工艺,它认为几条生产线共享同样稀缺的生产资源。因此,在每个生产周期中,只有这些生产线的一个子集可以同时运行。此外,生产环境的特点是存在依赖于顺序的设置时间和成本,以及生产只能短期储存的易腐物品。首先,我们为文献中先前提出的模型提出了设施位置的重新表述。其次,我们提出了一个由两个阶段组成的启发式算法。第一阶段有一个详细的方法来构建可行的解决方案,首先解决聚集的批量确定问题,以决定组装哪些生产线,然后解决各种单线批量确定和调度问题。第二阶段应用改进启发法,探索修复和优化的原则以及局部分支过程。为了研究所提出方法的效率,给出了使用文献中提出的数据集进行的计算结果。结果表明,当用专门为解决所考虑的问题而开发的文献中的启发式方法和商业MIP求解器进行基准测试时,我们的启发式方法提供了优越的结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
DECOMPOSITION BASED HEURISTICS FOR A LOT SIZING AND SCHEDULING PROBLEM ON MULTIPLE HETEROGENEOUS PRODUCTION LINES WITH PERISHABLE PRODUCTS
ABSTRACT In this paper, we propose a novel MIP-based heuristic method to deal with a lot sizing and scheduling problem with multiple heterogeneous production lines in a production setting with perishable items. The problem is inspired by the production processes adopted by some Brazilian food industries and it considers that several production lines share the same scarce production resources. Therefore, only a subset of those lines can simultaneously operate in each production period. Moreover, the production environment is characterized by the existence of sequence-dependent setup times and costs, and by the production of perishable items which can be stocked for a short period only. Firstly, we propose a facility location reformulation for a model previously proposed in the literature. Secondly, we propose a heuristic composed of two phases. The first phase has an elaborated approach to building feasible solutions solving initially an aggregated lot sizing problem to decide which production lines to assemble, followed by the resolution of the various single line lot sizing and scheduling problems. The second phase applies improvement heuristics exploring principles of fix-and-optimize and local branching procedures. Computational results carried out using a data set proposed in the literature are presented in order to study the efficiency of the proposed approach. The results demonstrate that our heuristics provide superior results when benchmarked with a heuristic from the literature specifically developed to solve the problem under consideration, and with a commercial MIP solver.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Pesquisa Operacional
Pesquisa Operacional Decision Sciences-Management Science and Operations Research
CiteScore
1.60
自引率
0.00%
发文量
19
审稿时长
8 weeks
期刊介绍: Pesquisa Operacional is published each semester by the Sociedade Brasileira de Pesquisa Operacional - SOBRAPO, performing one volume per year, and is distributed free of charge to its associates. The abbreviated title of the journal is Pesq. Oper., which should be used in bibliographies, footnotes and bibliographical references and strips.
期刊最新文献
STUDY FOR DECENTRALIZATION OF NAVAL POWER IN THE BRAZILIAN NAVY: STRUCTURING AND MATHEMATICAL MODELING IN THE LIGHT OF THE ELECTRE-MOR METHOD FUZZY-BASED DECISION SUPPORT SYSTEM FOR PRIVATE BANKING RECOVERY OF A GREEN HOSPITAL SYSTEMS BASED ON ISO 14001: 2015 STANDARDS A NEW MODELLING FOR THE AIRCRAFT LANDING PROBLEM AND MATHEURISTIC APPROACH TO SOLVE THE PROBLEM WITH A LARGE NUMBER OF AIRCRAFT BI-LEVEL MODEL: NEW APPROACH TO DYNAMIC VEHICLE ALLOCATION IN SUPPLY CHAIN
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1