基于可持续发展的建设项目风险管理评估模型——以小型电厂为例

Pub Date : 2020-12-29 DOI:10.11113/ijbes.v8.n1.568
Mehrdad Masoudnejad, Siroos Gholampour, M. Rayati, Fateme Nikzad
{"title":"基于可持续发展的建设项目风险管理评估模型——以小型电厂为例","authors":"Mehrdad Masoudnejad, Siroos Gholampour, M. Rayati, Fateme Nikzad","doi":"10.11113/ijbes.v8.n1.568","DOIUrl":null,"url":null,"abstract":"Economic growth in developing countries requires the implementation of infrastructural projects such as power plants, the sustainability of which plays an important role in the social, economic, and environmental development. Despite, these projects are always associated with uncertainties and risks due to features such as uniqueness, unspecified time, the need for specific equipment, correlation between different phases and so on. Therefore, in the present study, a small-scale power plants in Mazandaran was subjected to a case study by which the project risks were properly studied. By interviewing the experts associated with the construction of the power plant, 34 risks were identified and subsequently categorized into four categories of environmental, economic, social, and technical. Then, using the failure factor analysis method, their effects were evaluated, and critical risks were identified. In the next step, Fuzzy TOPSIS hierarchical analysis method was used to prioritize critical risks according to the project objectives in accordance with the PMBOK project management standard. After prioritizing the critical risks, in accordance with the real conditions of these projects, suggestions were made to respond and face the critical risks","PeriodicalId":0,"journal":{"name":"","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2020-12-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Providing a Model For Assessing Risk Management Of Construction Projects With A Sustainable Development Approach: Case Studies Of Small-Scale Power Plants\",\"authors\":\"Mehrdad Masoudnejad, Siroos Gholampour, M. Rayati, Fateme Nikzad\",\"doi\":\"10.11113/ijbes.v8.n1.568\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Economic growth in developing countries requires the implementation of infrastructural projects such as power plants, the sustainability of which plays an important role in the social, economic, and environmental development. Despite, these projects are always associated with uncertainties and risks due to features such as uniqueness, unspecified time, the need for specific equipment, correlation between different phases and so on. Therefore, in the present study, a small-scale power plants in Mazandaran was subjected to a case study by which the project risks were properly studied. By interviewing the experts associated with the construction of the power plant, 34 risks were identified and subsequently categorized into four categories of environmental, economic, social, and technical. Then, using the failure factor analysis method, their effects were evaluated, and critical risks were identified. In the next step, Fuzzy TOPSIS hierarchical analysis method was used to prioritize critical risks according to the project objectives in accordance with the PMBOK project management standard. After prioritizing the critical risks, in accordance with the real conditions of these projects, suggestions were made to respond and face the critical risks\",\"PeriodicalId\":0,\"journal\":{\"name\":\"\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0,\"publicationDate\":\"2020-12-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.11113/ijbes.v8.n1.568\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.11113/ijbes.v8.n1.568","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

发展中国家的经济增长需要实施发电厂等基础设施项目,发电厂的可持续性在社会、经济和环境发展中发挥着重要作用。尽管如此,由于这些项目的独特性、未指定的时间、对特定设备的需求、不同阶段之间的相关性等特点,这些项目总是与不确定性和风险联系在一起。因此,在本研究中,对马赞德兰的一个小规模发电厂进行了案例研究,对项目风险进行了适当的研究。通过采访与发电厂建设相关的专家,确定了34种风险,随后将其分为环境、经济、社会和技术四类。然后,使用失效因素分析方法,对其效果进行评估,并确定关键风险。下一步,根据PMBOK项目管理标准,采用模糊TOPSIS层次分析方法,根据项目目标对关键风险进行优先级排序。在对关键风险进行优先级排序后,根据这些项目的实际情况,提出了应对和面对关键风险的建议
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
Providing a Model For Assessing Risk Management Of Construction Projects With A Sustainable Development Approach: Case Studies Of Small-Scale Power Plants
Economic growth in developing countries requires the implementation of infrastructural projects such as power plants, the sustainability of which plays an important role in the social, economic, and environmental development. Despite, these projects are always associated with uncertainties and risks due to features such as uniqueness, unspecified time, the need for specific equipment, correlation between different phases and so on. Therefore, in the present study, a small-scale power plants in Mazandaran was subjected to a case study by which the project risks were properly studied. By interviewing the experts associated with the construction of the power plant, 34 risks were identified and subsequently categorized into four categories of environmental, economic, social, and technical. Then, using the failure factor analysis method, their effects were evaluated, and critical risks were identified. In the next step, Fuzzy TOPSIS hierarchical analysis method was used to prioritize critical risks according to the project objectives in accordance with the PMBOK project management standard. After prioritizing the critical risks, in accordance with the real conditions of these projects, suggestions were made to respond and face the critical risks
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1