Wisnu Isvara, Mohammad Ichsan, Farras Ammar Muhammad, Jodi Noor Handibyanto, S. Abdinagoro
{"title":"采用以风险为本的方法,制订承建商全面预融资计划的策略,以提高收费公路发展项目的成本效益","authors":"Wisnu Isvara, Mohammad Ichsan, Farras Ammar Muhammad, Jodi Noor Handibyanto, S. Abdinagoro","doi":"10.1080/23311916.2023.2243718","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":10464,"journal":{"name":"Cogent Engineering","volume":" ","pages":""},"PeriodicalIF":2.1000,"publicationDate":"2023-09-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Strategy development of contractor with Contractor Full Pre-Finance (CPF) scheme using risk-based approach to increase cost performance of toll road development projects\",\"authors\":\"Wisnu Isvara, Mohammad Ichsan, Farras Ammar Muhammad, Jodi Noor Handibyanto, S. Abdinagoro\",\"doi\":\"10.1080/23311916.2023.2243718\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":10464,\"journal\":{\"name\":\"Cogent Engineering\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":2.1000,\"publicationDate\":\"2023-09-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Cogent Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/23311916.2023.2243718\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"ENGINEERING, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Cogent Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/23311916.2023.2243718","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
Strategy development of contractor with Contractor Full Pre-Finance (CPF) scheme using risk-based approach to increase cost performance of toll road development projects
期刊介绍:
One of the largest, multidisciplinary open access engineering journals of peer-reviewed research, Cogent Engineering, part of the Taylor & Francis Group, covers all areas of engineering and technology, from chemical engineering to computer science, and mechanical to materials engineering. Cogent Engineering encourages interdisciplinary research and also accepts negative results, software article, replication studies and reviews.