机电服务成本管理所需战略知识领域的评估

Q2 Business, Management and Accounting Journal of Engineering Project and Production Management Pub Date : 2022-09-01 DOI:10.32738/jeppm-2022-0023
V. Arowoiya, O. Akinradewo, O. Adeniyi
{"title":"机电服务成本管理所需战略知识领域的评估","authors":"V. Arowoiya, O. Akinradewo, O. Adeniyi","doi":"10.32738/jeppm-2022-0023","DOIUrl":null,"url":null,"abstract":": Mechanical and Electrical (M&E) services account for 10-70% of the total cost of projects, depending on the project type. Sadly, the complex nature of the design of M&E services among other peculiar attributes has led to an enormous challenge in the cost management of M&E services in the construction industry. This study examined the knowledge areas required to effectively cost-manage M&E services in construction projects. Data for the study were collected by administering copies of a carefully designed questionnaire among experts in M&E services after a pilot study with a team of experts. The variables outlined in the questionnaire were extracted from relevant literature. In selecting the M&E services experts that participated in the survey, purposive and snowballing sampling techniques were used. The professionals involved include electrical, mechanical engineers, and quantity surveyors. Data analysis was done using mean item score, gap analysis, Spearman rank correlation, and Kendall coefficient of concordance. Findings revealed that knowledge in Bill of Quantities (BOQ) preparation, valuation, measurement of M&E works, estimating, and quality management were ranked as the most important knowledge areas and a statistically significant agreement among the experts was recorded. Gap analysis revealed that the ability of cost managers/QSs in the knowledge areas is currently below expectation while a moderate relationship was observed between the importance and performance of QSs/cost managers in the knowledge areas. The study concludes that there is a need for cost managers/quantity surveyors to enhance their knowledge in the identified knowledge areas and strive hard to close the gap between importance and performance in the knowledge areas.","PeriodicalId":53274,"journal":{"name":"Journal of Engineering Project and Production Management","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Evaluation of Strategic Knowledge Areas Required in Mechanical and Electrical Services Cost Management\",\"authors\":\"V. Arowoiya, O. Akinradewo, O. Adeniyi\",\"doi\":\"10.32738/jeppm-2022-0023\",\"DOIUrl\":null,\"url\":null,\"abstract\":\": Mechanical and Electrical (M&E) services account for 10-70% of the total cost of projects, depending on the project type. Sadly, the complex nature of the design of M&E services among other peculiar attributes has led to an enormous challenge in the cost management of M&E services in the construction industry. This study examined the knowledge areas required to effectively cost-manage M&E services in construction projects. Data for the study were collected by administering copies of a carefully designed questionnaire among experts in M&E services after a pilot study with a team of experts. The variables outlined in the questionnaire were extracted from relevant literature. In selecting the M&E services experts that participated in the survey, purposive and snowballing sampling techniques were used. The professionals involved include electrical, mechanical engineers, and quantity surveyors. Data analysis was done using mean item score, gap analysis, Spearman rank correlation, and Kendall coefficient of concordance. Findings revealed that knowledge in Bill of Quantities (BOQ) preparation, valuation, measurement of M&E works, estimating, and quality management were ranked as the most important knowledge areas and a statistically significant agreement among the experts was recorded. Gap analysis revealed that the ability of cost managers/QSs in the knowledge areas is currently below expectation while a moderate relationship was observed between the importance and performance of QSs/cost managers in the knowledge areas. The study concludes that there is a need for cost managers/quantity surveyors to enhance their knowledge in the identified knowledge areas and strive hard to close the gap between importance and performance in the knowledge areas.\",\"PeriodicalId\":53274,\"journal\":{\"name\":\"Journal of Engineering Project and Production Management\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Engineering Project and Production Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.32738/jeppm-2022-0023\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Business, Management and Accounting\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering Project and Production Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32738/jeppm-2022-0023","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Business, Management and Accounting","Score":null,"Total":0}
引用次数: 0

摘要

机电服务占工程总成本的10-70%,视工程类型而定。可悲的是,机电服务设计的复杂性以及其他特殊属性导致了建筑行业机电服务成本管理的巨大挑战。本研究考察了在建筑项目中有效成本管理机电服务所需的知识领域。该研究的数据是在与一组专家进行初步研究后,通过在M&E服务专家中管理精心设计的问卷副本来收集的。问卷中列出的变量摘自相关文献。在选择参与调查的M&E服务专家时,使用了有目的和滚雪球抽样技术。涉及的专业人员包括电气、机械工程师和工料测量师。数据分析采用平均项目得分、差距分析、Spearman秩相关和Kendall一致性系数。调查结果显示,在工程量清单(BOQ)的准备、评估、机电工程的测量、估算和质量管理方面的知识被列为最重要的知识领域,专家之间的统计显著一致被记录下来。差距分析显示,成本经理/质量经理在知识领域的能力目前低于预期,而质量经理/成本经理在知识领域的重要性和绩效之间存在适度的关系。该研究的结论是,成本经理/工料测量师有必要提高他们在确定的知识领域的知识,并努力缩小知识领域的重要性和绩效之间的差距。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Evaluation of Strategic Knowledge Areas Required in Mechanical and Electrical Services Cost Management
: Mechanical and Electrical (M&E) services account for 10-70% of the total cost of projects, depending on the project type. Sadly, the complex nature of the design of M&E services among other peculiar attributes has led to an enormous challenge in the cost management of M&E services in the construction industry. This study examined the knowledge areas required to effectively cost-manage M&E services in construction projects. Data for the study were collected by administering copies of a carefully designed questionnaire among experts in M&E services after a pilot study with a team of experts. The variables outlined in the questionnaire were extracted from relevant literature. In selecting the M&E services experts that participated in the survey, purposive and snowballing sampling techniques were used. The professionals involved include electrical, mechanical engineers, and quantity surveyors. Data analysis was done using mean item score, gap analysis, Spearman rank correlation, and Kendall coefficient of concordance. Findings revealed that knowledge in Bill of Quantities (BOQ) preparation, valuation, measurement of M&E works, estimating, and quality management were ranked as the most important knowledge areas and a statistically significant agreement among the experts was recorded. Gap analysis revealed that the ability of cost managers/QSs in the knowledge areas is currently below expectation while a moderate relationship was observed between the importance and performance of QSs/cost managers in the knowledge areas. The study concludes that there is a need for cost managers/quantity surveyors to enhance their knowledge in the identified knowledge areas and strive hard to close the gap between importance and performance in the knowledge areas.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Engineering Project and Production Management
Journal of Engineering Project and Production Management Business, Management and Accounting-Business, Management and Accounting (miscellaneous)
CiteScore
2.30
自引率
0.00%
发文量
24
审稿时长
30 weeks
期刊最新文献
Condition-based Maintenance Using BIM: A Case Study of Energy Modeling for a Residential Building Comparative Evaluation of Road Safety Level and Geometric Design Consistency Digitalization and Engineering Management for the Next-Era Industries Pandemic Effect on the Industry 4.0 Readiness: A Case Study in Vietnamese Industry Internet of Things (IoT) Impact on Facility Management of Office Buildings: A Qualitative Study
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1