{"title":"具有不相关并行机器的柔性流水车间调度问题的最小运行成本","authors":"A. Hassani, Seyed Mohammad Hassan Hosseini, Foroogh Behroozi","doi":"10.22094/JOIE.2021.1890852.1718","DOIUrl":null,"url":null,"abstract":"This paper investigates a flexible flow shop scheduling problem with the aim of minimizing the operational costs as a new objective function. In this production system, there are some unrelated parallel machines with different performances and different technology levels in the first stage and each other stage consists of a single machine. Setup times are assumed as sequence-dependent and are need when a machine starts to process a new job. Some of the parallel machines in the first stage are multifunctional and can do several processes on jobs. So, the jobs that are assigned to these machines do not need to be processed in some next stages. This problem is described with an example, and its parameters and decision variables are defined. Then a mathematical model based on mixed-integer linear programming (MIP) is developed to solve the problem in small-sized scales. As this problem is discussed in an Np-hard environment, the Genetic Algorithm (GA) is applied to solve the considered problem on practical-sized scales. Due to the result, the operational costs conflict with makespan as a common objective function in scheduling problems. Therefore, the supplementary analysis has been presented considering a restriction on the makespan.","PeriodicalId":36956,"journal":{"name":"Journal of Optimization in Industrial Engineering","volume":"14 1","pages":"169-184"},"PeriodicalIF":0.0000,"publicationDate":"2021-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Minimizing the operational costs in a flexible flow shop scheduling problem with unrelated parallel machines\",\"authors\":\"A. Hassani, Seyed Mohammad Hassan Hosseini, Foroogh Behroozi\",\"doi\":\"10.22094/JOIE.2021.1890852.1718\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper investigates a flexible flow shop scheduling problem with the aim of minimizing the operational costs as a new objective function. In this production system, there are some unrelated parallel machines with different performances and different technology levels in the first stage and each other stage consists of a single machine. Setup times are assumed as sequence-dependent and are need when a machine starts to process a new job. Some of the parallel machines in the first stage are multifunctional and can do several processes on jobs. So, the jobs that are assigned to these machines do not need to be processed in some next stages. This problem is described with an example, and its parameters and decision variables are defined. Then a mathematical model based on mixed-integer linear programming (MIP) is developed to solve the problem in small-sized scales. As this problem is discussed in an Np-hard environment, the Genetic Algorithm (GA) is applied to solve the considered problem on practical-sized scales. Due to the result, the operational costs conflict with makespan as a common objective function in scheduling problems. Therefore, the supplementary analysis has been presented considering a restriction on the makespan.\",\"PeriodicalId\":36956,\"journal\":{\"name\":\"Journal of Optimization in Industrial Engineering\",\"volume\":\"14 1\",\"pages\":\"169-184\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Optimization in Industrial Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.22094/JOIE.2021.1890852.1718\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Optimization in Industrial Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22094/JOIE.2021.1890852.1718","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 4

摘要

本文研究了一个以最小化运营成本为新目标函数的柔性流水车间调度问题。在这个生产系统中,第一阶段有一些不相关的、性能不同、技术水平不同的并行机器,每个阶段都由一台机器组成。设置时间被假定为与顺序相关,并且在机器开始处理新作业时需要设置时间。第一阶段中的一些并行机器是多功能的,可以在工作中完成多个过程。因此,分配给这些机器的作业不需要在下一阶段进行处理。通过一个例子描述了这个问题,并定义了它的参数和决策变量。然后建立了一个基于混合整数线性规划(MIP)的数学模型来解决小规模的问题。由于该问题是在Np硬环境中讨论的,因此将遗传算法应用于实际尺寸尺度上的求解。因此,在调度问题中,运营成本与完工时间作为一个共同的目标函数相冲突。因此,考虑到完工时间的限制,提出了补充分析。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Minimizing the operational costs in a flexible flow shop scheduling problem with unrelated parallel machines
This paper investigates a flexible flow shop scheduling problem with the aim of minimizing the operational costs as a new objective function. In this production system, there are some unrelated parallel machines with different performances and different technology levels in the first stage and each other stage consists of a single machine. Setup times are assumed as sequence-dependent and are need when a machine starts to process a new job. Some of the parallel machines in the first stage are multifunctional and can do several processes on jobs. So, the jobs that are assigned to these machines do not need to be processed in some next stages. This problem is described with an example, and its parameters and decision variables are defined. Then a mathematical model based on mixed-integer linear programming (MIP) is developed to solve the problem in small-sized scales. As this problem is discussed in an Np-hard environment, the Genetic Algorithm (GA) is applied to solve the considered problem on practical-sized scales. Due to the result, the operational costs conflict with makespan as a common objective function in scheduling problems. Therefore, the supplementary analysis has been presented considering a restriction on the makespan.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Optimization in Industrial Engineering
Journal of Optimization in Industrial Engineering Engineering-Industrial and Manufacturing Engineering
CiteScore
2.90
自引率
0.00%
发文量
0
审稿时长
32 weeks
期刊最新文献
Stochastic analysis of k-out-of-n: G type of repairable system in combination of subsystems with controllers and multi repair approach Developing a transfer point location problem considering normal demands distribution A bi-objective non-linear approach for determining the ordering strategy for group B in ABC analysis inventory Analysis of Causal Relationships Effective Factors on the Green Supplier Selection in Health Centers Using the Intuitionistic Fuzzy Cognitive Map (IFCM) Method Optimization of Inventory Controlling System Using Integrated Seasonal forecasting and Integer Programming
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1