数字孪生体在导流柱碰岩危险性预测中的应用

Q4 Engineering Gornaya Promyshlennost Pub Date : 2022-07-01 DOI:10.30686/1609-9192-2022-3-93-98
N.E. Moroz, D. Sidorov, M. A. Sonnov
{"title":"数字孪生体在导流柱碰岩危险性预测中的应用","authors":"N.E. Moroz, D. Sidorov, M. A. Sonnov","doi":"10.30686/1609-9192-2022-3-93-98","DOIUrl":null,"url":null,"abstract":"Drift pillars are used to protect haulage tunnels from the effects of formation pressure and ingress of the caved rock mass. At the same time, leaving pillars made up of fragile ores exposed to significant compressive stresses poses a risk of dynamic formation pressure. Due to the design features of the mining method and safety regulations, it is not possible to access the drift pillar from the rising side, which limits the ability to make a meaningful instrumental forecast of the rock-bump hazard. Therefore, it is advisable to use digital twins to predict the rock-bump hazard of the drift pillars. The article describes the experience gained by the VNIMI Institute in using the PRESS 3D URAL dedicated software (Polygore LLC, St. Petersburg) and the FIDESYS software package (Fidesys, Moscow) for a comprehensive assessment of the stress-and-strain state and rock-bump hazardous condition of the drift pillar. The first stage included numerical evaluation of the natural tectonic stress field using the PRESS 3D URAL software. At the second stage, an assessment of the man-made stress-and-strain state of the rock mass and the ore drift pillar was performed using the FIDESYS software package during underground mining with the heading-and-stall method. The final stage involved a prediction of the rock-bump hazard of the ore pillar using data on the ore strength properties.","PeriodicalId":36119,"journal":{"name":"Gornaya Promyshlennost","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Application of digital twins to predict rock-bump hazard of drift pillars\",\"authors\":\"N.E. Moroz, D. Sidorov, M. A. Sonnov\",\"doi\":\"10.30686/1609-9192-2022-3-93-98\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Drift pillars are used to protect haulage tunnels from the effects of formation pressure and ingress of the caved rock mass. At the same time, leaving pillars made up of fragile ores exposed to significant compressive stresses poses a risk of dynamic formation pressure. Due to the design features of the mining method and safety regulations, it is not possible to access the drift pillar from the rising side, which limits the ability to make a meaningful instrumental forecast of the rock-bump hazard. Therefore, it is advisable to use digital twins to predict the rock-bump hazard of the drift pillars. The article describes the experience gained by the VNIMI Institute in using the PRESS 3D URAL dedicated software (Polygore LLC, St. Petersburg) and the FIDESYS software package (Fidesys, Moscow) for a comprehensive assessment of the stress-and-strain state and rock-bump hazardous condition of the drift pillar. The first stage included numerical evaluation of the natural tectonic stress field using the PRESS 3D URAL software. At the second stage, an assessment of the man-made stress-and-strain state of the rock mass and the ore drift pillar was performed using the FIDESYS software package during underground mining with the heading-and-stall method. The final stage involved a prediction of the rock-bump hazard of the ore pillar using data on the ore strength properties.\",\"PeriodicalId\":36119,\"journal\":{\"name\":\"Gornaya Promyshlennost\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Gornaya Promyshlennost\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.30686/1609-9192-2022-3-93-98\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Gornaya Promyshlennost","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30686/1609-9192-2022-3-93-98","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0

摘要

漂移矿柱用于保护运输隧道免受地层压力和洞穴岩体进入的影响。同时,由脆弱矿石组成的矿柱暴露在显著的压缩应力下会带来动态地层压力的风险。由于采矿方法的设计特点和安全规定,不可能从上升侧进入漂移柱,这限制了对岩石撞击危险进行有意义的仪器预测的能力。因此,建议采用数字孪生方法来预测巷道支柱的岩石撞击危险性。本文介绍了VNIMI研究所使用PRESS 3D URAL专用软件(Polygore LLC,圣彼得堡)和FIDESYS软件包(FIDESYS,莫斯科)对漂移柱的应力应变状态和岩石撞击危险条件进行综合评估的经验。第一阶段包括使用PRESS 3D URAL软件对自然构造应力场进行数值评估。在第二阶段,使用FIDESYS软件包对掘进-失速法地下开采过程中岩体和矿柱的人为应力和应变状态进行了评估。最后阶段涉及使用矿石强度特性数据预测矿柱的岩石撞击危险。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Application of digital twins to predict rock-bump hazard of drift pillars
Drift pillars are used to protect haulage tunnels from the effects of formation pressure and ingress of the caved rock mass. At the same time, leaving pillars made up of fragile ores exposed to significant compressive stresses poses a risk of dynamic formation pressure. Due to the design features of the mining method and safety regulations, it is not possible to access the drift pillar from the rising side, which limits the ability to make a meaningful instrumental forecast of the rock-bump hazard. Therefore, it is advisable to use digital twins to predict the rock-bump hazard of the drift pillars. The article describes the experience gained by the VNIMI Institute in using the PRESS 3D URAL dedicated software (Polygore LLC, St. Petersburg) and the FIDESYS software package (Fidesys, Moscow) for a comprehensive assessment of the stress-and-strain state and rock-bump hazardous condition of the drift pillar. The first stage included numerical evaluation of the natural tectonic stress field using the PRESS 3D URAL software. At the second stage, an assessment of the man-made stress-and-strain state of the rock mass and the ore drift pillar was performed using the FIDESYS software package during underground mining with the heading-and-stall method. The final stage involved a prediction of the rock-bump hazard of the ore pillar using data on the ore strength properties.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Gornaya Promyshlennost
Gornaya Promyshlennost Engineering-Industrial and Manufacturing Engineering
CiteScore
1.10
自引率
0.00%
发文量
100
期刊最新文献
Forest industry of the mountainous region: assessment of territorial organization and risks for development (Tuva Republic case study) Changes in the seismic energy flow when mining deep levels (the Apatite Circus deposit, Khibiny Massif) Controlled operation of GP-200/11x500-m pump Analysis of factors limiting the efficiency of human protection against electric shocks in the power supply network of the mine site The effect of the quality of ammonium nitrate on the properties of emulsion explosives
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1