{"title":"大型无衬砌岩洞楔块破坏分析及修复措施研究","authors":"T. Bhatkar, A. Usmani, A. Mandal, A. Nanda, Analiza Pęknięcia, Klina W Dużej, Nieobudowanej Komorze Skalnej, Oraz Podjęte, Kroki Naprawcze, Studium Przypadku","doi":"10.24425/AMS.2018.124987","DOIUrl":null,"url":null,"abstract":"This article presents a case study of a large wedge failure. It took place during excavation of the last bench of storage cavern with an approximate dimension of 80 m long having a depth of 8 m. The adopted intervention followed a structured approach, which included immediate rock support, geotechnical and geological investigations in the failure zone and design modifications. Back analyses of the failure zone were also carried out to assess design parameters with observed geological conditions. Re assessment in the failure zone was carried out using modified design parameters, which included shorter benches, rock support installation schemes such as longer rock bolts, reinforced ribs of shotcrete and reduced construction advances. Geotechnical monitoring in and around failure zone were carried out for recording any alarming movements in the rock mass. Initially, geotechnical monitoring was carried out in the recently excavated zone of the cavern on a daily basis. Based on continuous monitoring data for at least one week, the frequency of subsequent monitoring can be decided. In most cases the deformation of rock mass was considerably less than the alarming values which were calculated based on detailed design for different rock classes. The paper discusses the failure, investigation, cause, assessment and remedial measures to complete the construction of cavern.","PeriodicalId":55468,"journal":{"name":"Archives of Mining Sciences","volume":" ","pages":""},"PeriodicalIF":1.2000,"publicationDate":"2023-07-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Wedge Failure Analysis and Remedial Measures in Large Unlined Rock Cavern: a Case Study\",\"authors\":\"T. Bhatkar, A. Usmani, A. Mandal, A. Nanda, Analiza Pęknięcia, Klina W Dużej, Nieobudowanej Komorze Skalnej, Oraz Podjęte, Kroki Naprawcze, Studium Przypadku\",\"doi\":\"10.24425/AMS.2018.124987\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This article presents a case study of a large wedge failure. It took place during excavation of the last bench of storage cavern with an approximate dimension of 80 m long having a depth of 8 m. The adopted intervention followed a structured approach, which included immediate rock support, geotechnical and geological investigations in the failure zone and design modifications. Back analyses of the failure zone were also carried out to assess design parameters with observed geological conditions. Re assessment in the failure zone was carried out using modified design parameters, which included shorter benches, rock support installation schemes such as longer rock bolts, reinforced ribs of shotcrete and reduced construction advances. Geotechnical monitoring in and around failure zone were carried out for recording any alarming movements in the rock mass. Initially, geotechnical monitoring was carried out in the recently excavated zone of the cavern on a daily basis. Based on continuous monitoring data for at least one week, the frequency of subsequent monitoring can be decided. In most cases the deformation of rock mass was considerably less than the alarming values which were calculated based on detailed design for different rock classes. The paper discusses the failure, investigation, cause, assessment and remedial measures to complete the construction of cavern.\",\"PeriodicalId\":55468,\"journal\":{\"name\":\"Archives of Mining Sciences\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":1.2000,\"publicationDate\":\"2023-07-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Archives of Mining Sciences\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.24425/AMS.2018.124987\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MINING & MINERAL PROCESSING\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Archives of Mining Sciences","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.24425/AMS.2018.124987","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MINING & MINERAL PROCESSING","Score":null,"Total":0}
Wedge Failure Analysis and Remedial Measures in Large Unlined Rock Cavern: a Case Study
This article presents a case study of a large wedge failure. It took place during excavation of the last bench of storage cavern with an approximate dimension of 80 m long having a depth of 8 m. The adopted intervention followed a structured approach, which included immediate rock support, geotechnical and geological investigations in the failure zone and design modifications. Back analyses of the failure zone were also carried out to assess design parameters with observed geological conditions. Re assessment in the failure zone was carried out using modified design parameters, which included shorter benches, rock support installation schemes such as longer rock bolts, reinforced ribs of shotcrete and reduced construction advances. Geotechnical monitoring in and around failure zone were carried out for recording any alarming movements in the rock mass. Initially, geotechnical monitoring was carried out in the recently excavated zone of the cavern on a daily basis. Based on continuous monitoring data for at least one week, the frequency of subsequent monitoring can be decided. In most cases the deformation of rock mass was considerably less than the alarming values which were calculated based on detailed design for different rock classes. The paper discusses the failure, investigation, cause, assessment and remedial measures to complete the construction of cavern.
期刊介绍:
Archives of Mining Sciences (AMS) is concerned with original research, new developments and case studies in mining sciences and energy, civil engineering and environmental engineering. The journal provides an international forum for the publication of high quality research results in:
mining technologies,
mineral processing,
stability of mine workings,
mining machine science,
ventilation systems,
rock mechanics,
termodynamics,
underground storage of oil and gas,
mining and engineering geology,
geotechnical engineering,
tunnelling,
design and construction of tunnels,
design and construction on mining areas,
mining geodesy,
environmental protection in mining,
revitalisation of postindustrial areas.
Papers are welcomed on all relevant topics and especially on theoretical developments, analytical methods, numerical methods, rock testing, site investigation, and case studies.