不受等待约束的双机链再入车间

IF 1.9 4区 工程技术 Q3 ENGINEERING, INDUSTRIAL European Journal of Industrial Engineering Pub Date : 2020-07-20 DOI:10.1504/ejie.2020.10030254
Karima Amrouche, Mourad Boudhar, Nazim Sami
{"title":"不受等待约束的双机链再入车间","authors":"Karima Amrouche, Mourad Boudhar, Nazim Sami","doi":"10.1504/ejie.2020.10030254","DOIUrl":null,"url":null,"abstract":"This paper addresses the chain-reentrant flow shop scheduling problem with two machines and n non-preemptive jobs in the presence of the no-wait constraint; we assume that each job passes from the first machine to the second and returns back to the first machine. The objective is to minimise the makespan. The general problem is NP-hard in the strong sense. Based on a dynamic programming algorithm, we prove that the problem is polynomially solvable when the execution order of the jobs through the machines is a fixed permutation. For the resolution of the general problem, we propose a linear mathematical model, local search heuristics, a simulated annealing metaheuristic and lower bounds with numerical experiments. [Received: 8 February 2019; Revised: 19 June 2019; Revised: 26 August 2019; Revised: 8 October 2019; Revised: 9 November 2019; Accepted: 11 November 2019]","PeriodicalId":51047,"journal":{"name":"European Journal of Industrial Engineering","volume":"14 1","pages":"573"},"PeriodicalIF":1.9000,"publicationDate":"2020-07-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Two-machine chain-reentrant ow shop with the no-wait constraint\",\"authors\":\"Karima Amrouche, Mourad Boudhar, Nazim Sami\",\"doi\":\"10.1504/ejie.2020.10030254\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper addresses the chain-reentrant flow shop scheduling problem with two machines and n non-preemptive jobs in the presence of the no-wait constraint; we assume that each job passes from the first machine to the second and returns back to the first machine. The objective is to minimise the makespan. The general problem is NP-hard in the strong sense. Based on a dynamic programming algorithm, we prove that the problem is polynomially solvable when the execution order of the jobs through the machines is a fixed permutation. For the resolution of the general problem, we propose a linear mathematical model, local search heuristics, a simulated annealing metaheuristic and lower bounds with numerical experiments. [Received: 8 February 2019; Revised: 19 June 2019; Revised: 26 August 2019; Revised: 8 October 2019; Revised: 9 November 2019; Accepted: 11 November 2019]\",\"PeriodicalId\":51047,\"journal\":{\"name\":\"European Journal of Industrial Engineering\",\"volume\":\"14 1\",\"pages\":\"573\"},\"PeriodicalIF\":1.9000,\"publicationDate\":\"2020-07-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"European Journal of Industrial Engineering\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1504/ejie.2020.10030254\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"European Journal of Industrial Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1504/ejie.2020.10030254","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 2

摘要

研究了在无等待约束下,具有两台机器和n个非抢占作业的链式可重入流车间调度问题;我们假设每个作业从第一台机器传递到第二台机器,然后返回到第一台机器。目标是最小化完工时间。一般的问题在强意义上是np困难的。利用一种动态规划算法,证明了当作业的执行顺序为固定排列时,问题是多项式可解的。为了解决一般问题,我们提出了线性数学模型、局部搜索启发式、模拟退火元启发式和下界数值实验。[收稿日期:2019年2月8日;修订日期:2019年6月19日;修订日期:2019年8月26日;修订日期:2019年10月8日;修订日期:2019年11月9日;录用日期:2019年11月11日]
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Two-machine chain-reentrant ow shop with the no-wait constraint
This paper addresses the chain-reentrant flow shop scheduling problem with two machines and n non-preemptive jobs in the presence of the no-wait constraint; we assume that each job passes from the first machine to the second and returns back to the first machine. The objective is to minimise the makespan. The general problem is NP-hard in the strong sense. Based on a dynamic programming algorithm, we prove that the problem is polynomially solvable when the execution order of the jobs through the machines is a fixed permutation. For the resolution of the general problem, we propose a linear mathematical model, local search heuristics, a simulated annealing metaheuristic and lower bounds with numerical experiments. [Received: 8 February 2019; Revised: 19 June 2019; Revised: 26 August 2019; Revised: 8 October 2019; Revised: 9 November 2019; Accepted: 11 November 2019]
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
European Journal of Industrial Engineering
European Journal of Industrial Engineering 工程技术-工程:工业
CiteScore
2.60
自引率
20.00%
发文量
55
审稿时长
6 months
期刊介绍: EJIE is an international journal aimed at disseminating the latest developments in all areas of industrial engineering, including information and service industries, ergonomics and safety, quality management as well as business and strategy, and at bridging the gap between theory and practice.
期刊最新文献
A collaborative model for predictive maintenance of after-sales equipment based on digital twin An integrated two dimensional cutting stock and lot sizing problem with two criteria Third-party remanufacturing modes with integrated tax-subsidy policy Blockchain capabilities for supply chain management An integrated Markov chain model for the economic-statistical design of adaptive multivariate control charts and maintenance planning
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1