{"title":"饱和砂层地下引水隧洞衬砌技术及混凝土衬砌厚度测量","authors":"Qixin Liu","doi":"10.20937/rica.54603","DOIUrl":null,"url":null,"abstract":"In order to improve the construction technology quality of the diversion tunnel lining in saturated sand stratum, the lining technology of underground diversion tunnel in saturated sand stratum is studied in detail in this paper. Steel trolley is used to complete binding production, and HBT-20 concrete pump is used to transport concrete. Concrete construction starts from bottom plate and side arch. After the construction, the quality of the diversion tunnel lining is tested nondestructively by the impact elastic wave, and the thickness and defects of the lining are analyzed by the reflection characteristics and spectral relationship of the impact elastic wave. The strength of lining concrete is measured by the propagation characteristics of R wave and the relationship between wave velocity and strength. The results show that the maximum additional bending strain of tunnel wall is about 300 με. At measuring point B7, the thickness and strength of concrete lining can be accurately measured by nondestructive quality testing technology.","PeriodicalId":49608,"journal":{"name":"Revista Internacional De Contaminacion Ambiental","volume":" ","pages":""},"PeriodicalIF":0.4000,"publicationDate":"2023-02-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Lining Technology of Saturated Sand Layer Underground Diversion Tunnel and the Measurement of Concrete Lining Thickness\",\"authors\":\"Qixin Liu\",\"doi\":\"10.20937/rica.54603\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In order to improve the construction technology quality of the diversion tunnel lining in saturated sand stratum, the lining technology of underground diversion tunnel in saturated sand stratum is studied in detail in this paper. Steel trolley is used to complete binding production, and HBT-20 concrete pump is used to transport concrete. Concrete construction starts from bottom plate and side arch. After the construction, the quality of the diversion tunnel lining is tested nondestructively by the impact elastic wave, and the thickness and defects of the lining are analyzed by the reflection characteristics and spectral relationship of the impact elastic wave. The strength of lining concrete is measured by the propagation characteristics of R wave and the relationship between wave velocity and strength. The results show that the maximum additional bending strain of tunnel wall is about 300 με. At measuring point B7, the thickness and strength of concrete lining can be accurately measured by nondestructive quality testing technology.\",\"PeriodicalId\":49608,\"journal\":{\"name\":\"Revista Internacional De Contaminacion Ambiental\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.4000,\"publicationDate\":\"2023-02-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Revista Internacional De Contaminacion Ambiental\",\"FirstCategoryId\":\"93\",\"ListUrlMain\":\"https://doi.org/10.20937/rica.54603\",\"RegionNum\":4,\"RegionCategory\":\"环境科学与生态学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENVIRONMENTAL SCIENCES\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Revista Internacional De Contaminacion Ambiental","FirstCategoryId":"93","ListUrlMain":"https://doi.org/10.20937/rica.54603","RegionNum":4,"RegionCategory":"环境科学与生态学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENVIRONMENTAL SCIENCES","Score":null,"Total":0}
Lining Technology of Saturated Sand Layer Underground Diversion Tunnel and the Measurement of Concrete Lining Thickness
In order to improve the construction technology quality of the diversion tunnel lining in saturated sand stratum, the lining technology of underground diversion tunnel in saturated sand stratum is studied in detail in this paper. Steel trolley is used to complete binding production, and HBT-20 concrete pump is used to transport concrete. Concrete construction starts from bottom plate and side arch. After the construction, the quality of the diversion tunnel lining is tested nondestructively by the impact elastic wave, and the thickness and defects of the lining are analyzed by the reflection characteristics and spectral relationship of the impact elastic wave. The strength of lining concrete is measured by the propagation characteristics of R wave and the relationship between wave velocity and strength. The results show that the maximum additional bending strain of tunnel wall is about 300 με. At measuring point B7, the thickness and strength of concrete lining can be accurately measured by nondestructive quality testing technology.
期刊介绍:
En esta revista se aceptan para su publicación trabajos originales y de revisión sobre aspectos físicos y químicos de la contaminación, investigaciones sobre la distribución y los efectos biológicos y ecológicos de los contaminantes; así como sobre tecnología e implementación de nuevas técnicas para su medida y control; también son aceptados estudios sociológicos, económicos y legales acerca del tema. Se publicarán los escritos que mediante arbitraje de especialistas y a juicio del Consejo Editorial tengan el nivel y la calidad adecuados para ello y su contenido será responsabilidad única de los autores. La Revista Internacional de Contaminación Ambiental es de periodicidad trimestral y se publica los días 1 de febrero, mayo, agosto y noviembre.