与基于位置的规划和Last Planner®系统集成的4D BIM模型生成和使用过程自动化方法

IF 3.1 Q2 CONSTRUCTION & BUILDING TECHNOLOGY Construction Innovation-England Pub Date : 2023-01-23 DOI:10.1108/ci-02-2022-0030
B. F. Silveira, D. Costa
{"title":"与基于位置的规划和Last Planner®系统集成的4D BIM模型生成和使用过程自动化方法","authors":"B. F. Silveira, D. Costa","doi":"10.1108/ci-02-2022-0030","DOIUrl":null,"url":null,"abstract":"\nPurpose\nSeveral studies have addressed the use of four-dimensional (4D) building information modeling (BIM) for construction management. However, the automation of the processes for generating 4D models and their integrated use with Location-Based Planning and the Last Planner® System is not well discussed. Therefore, this paper aims to develop a method for automating the generation and use of 4D BIM models integrated with Location-Based Planning and Last Planner® System supporting project control cycles.\n\n\nDesign/methodology/approach\nThe research strategy adopted was Design Science Research. The automated method for using the 4D models was developed and refined in two residential building projects in Brazil, along with 31 meetings and involving 11 direct users. The assessment of the proposed method focuses on four constructs: the impact of process automation, the impact on the identification and assessment of site progress and the planning process, ease of adoption and utility of the proposed method.\n\n\nFindings\nThe results of this paper indicated increased adherence between planned and executed through an automated method for using the 4D models. The established routines enabled automating the link between the planning levels and the three-dimensional (3D) model, providing a more agile and updated data source and achieving 92.8% of user satisfaction regarding the deadline and frequency of delivery of the 4D model reports. Moreover, this study identified the relationships between the processes of the method proposed and Digital Models.\n\n\nOriginality/value\nThe primary scientific value achieved in this study is creating a method for automating processes and simplifying steps for the generation and use of 4D BIM models in the production planning and control cycles during the construction phase.\n","PeriodicalId":45580,"journal":{"name":"Construction Innovation-England","volume":" ","pages":""},"PeriodicalIF":3.1000,"publicationDate":"2023-01-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Method for automating the processes of generating and using 4D BIM models integrated with location-based planning and Last Planner® System\",\"authors\":\"B. F. Silveira, D. Costa\",\"doi\":\"10.1108/ci-02-2022-0030\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\nPurpose\\nSeveral studies have addressed the use of four-dimensional (4D) building information modeling (BIM) for construction management. However, the automation of the processes for generating 4D models and their integrated use with Location-Based Planning and the Last Planner® System is not well discussed. Therefore, this paper aims to develop a method for automating the generation and use of 4D BIM models integrated with Location-Based Planning and Last Planner® System supporting project control cycles.\\n\\n\\nDesign/methodology/approach\\nThe research strategy adopted was Design Science Research. The automated method for using the 4D models was developed and refined in two residential building projects in Brazil, along with 31 meetings and involving 11 direct users. The assessment of the proposed method focuses on four constructs: the impact of process automation, the impact on the identification and assessment of site progress and the planning process, ease of adoption and utility of the proposed method.\\n\\n\\nFindings\\nThe results of this paper indicated increased adherence between planned and executed through an automated method for using the 4D models. The established routines enabled automating the link between the planning levels and the three-dimensional (3D) model, providing a more agile and updated data source and achieving 92.8% of user satisfaction regarding the deadline and frequency of delivery of the 4D model reports. Moreover, this study identified the relationships between the processes of the method proposed and Digital Models.\\n\\n\\nOriginality/value\\nThe primary scientific value achieved in this study is creating a method for automating processes and simplifying steps for the generation and use of 4D BIM models in the production planning and control cycles during the construction phase.\\n\",\"PeriodicalId\":45580,\"journal\":{\"name\":\"Construction Innovation-England\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":3.1000,\"publicationDate\":\"2023-01-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Construction Innovation-England\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/ci-02-2022-0030\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Construction Innovation-England","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/ci-02-2022-0030","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 2

摘要

一些研究已经解决了四维(4D)建筑信息模型(BIM)在施工管理中的应用。然而,生成4D模型的过程自动化及其与基于位置的规划和Last Planner®系统的集成使用并没有得到很好的讨论。因此,本文旨在开发一种自动化生成和使用4D BIM模型的方法,该模型与基于位置的规划和Last Planner®系统相结合,支持项目控制周期。采用的研究策略是设计科学研究。使用4D模型的自动化方法是在巴西的两个住宅建筑项目中开发和完善的,伴随着31次会议,涉及11个直接用户。对所提出方法的评估主要集中在四个方面:过程自动化的影响、对现场进度和规划过程的识别和评估的影响、所提出方法的易采用性和实用性。研究结果表明,通过使用4D模型的自动化方法,计划和执行之间的依从性增加。已建立的程序使规划层和三维模型之间的联系自动化,提供了一个更灵活和更新的数据源,并在交付4D模型报告的截止日期和频率方面达到92.8%的用户满意度。此外,本研究还确定了所提出方法的过程与数字模型之间的关系。原创性/价值本研究实现的主要科学价值是在施工阶段的生产计划和控制周期中创建一种自动化流程和简化生成和使用4D BIM模型的步骤的方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Method for automating the processes of generating and using 4D BIM models integrated with location-based planning and Last Planner® System
Purpose Several studies have addressed the use of four-dimensional (4D) building information modeling (BIM) for construction management. However, the automation of the processes for generating 4D models and their integrated use with Location-Based Planning and the Last Planner® System is not well discussed. Therefore, this paper aims to develop a method for automating the generation and use of 4D BIM models integrated with Location-Based Planning and Last Planner® System supporting project control cycles. Design/methodology/approach The research strategy adopted was Design Science Research. The automated method for using the 4D models was developed and refined in two residential building projects in Brazil, along with 31 meetings and involving 11 direct users. The assessment of the proposed method focuses on four constructs: the impact of process automation, the impact on the identification and assessment of site progress and the planning process, ease of adoption and utility of the proposed method. Findings The results of this paper indicated increased adherence between planned and executed through an automated method for using the 4D models. The established routines enabled automating the link between the planning levels and the three-dimensional (3D) model, providing a more agile and updated data source and achieving 92.8% of user satisfaction regarding the deadline and frequency of delivery of the 4D model reports. Moreover, this study identified the relationships between the processes of the method proposed and Digital Models. Originality/value The primary scientific value achieved in this study is creating a method for automating processes and simplifying steps for the generation and use of 4D BIM models in the production planning and control cycles during the construction phase.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Construction Innovation-England
Construction Innovation-England CONSTRUCTION & BUILDING TECHNOLOGY-
CiteScore
7.10
自引率
12.10%
发文量
71
期刊最新文献
Usage of digital technology in improving the mental health of workers on construction sites Uncertainties affecting the offsite construction supply chain resilience: a systematic literature review Developing an interactive pile training module for construction risk management and gaging users’ intentions Impact of trust in virtual project teams: structural equation modelling approach Customized shading solutions for complex building façades: the potential of an innovative cement-textile composite material through a performance-based generative design
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1