注意差距:超越计划执行逻辑进行绩效衡量

IF 7.4 1区 管理学 Q1 MANAGEMENT International Journal of Project Management Pub Date : 2023-05-01 DOI:10.1016/j.ijproman.2023.102467
Harvey Maylor , Joana Geraldi , Alexander Budzier , Neil Turner , Mark Johnson
{"title":"注意差距:超越计划执行逻辑进行绩效衡量","authors":"Harvey Maylor ,&nbsp;Joana Geraldi ,&nbsp;Alexander Budzier ,&nbsp;Neil Turner ,&nbsp;Mark Johnson","doi":"10.1016/j.ijproman.2023.102467","DOIUrl":null,"url":null,"abstract":"<div><p>Project performance measurement aims to identify deviations from intended goals and reduce ‘the gap’ between actual and expected performance. However, despite extensive measurement and control efforts, the gap is hard to close and, intriguingly, not necessarily related to the project's perceived performance, which is what will ultimately influence a stakeholder's satisfaction. Based on service quality research, this study explores the differences between perception and expectations of performance. Our mixed method study involving eighteen interviews and 85 survey responses in an IT-enabled change context shows that expectations and perceptions are fundamentally different concepts. As they are different, managing the gap between expectations and perceptions may be a nugatory task. The paper expands the literature on project performance measurement by questioning its foundations and offering a first step towards developing a more dynamic and subjective understanding of project performance that is consistent with a project's evolving nature.</p></div>","PeriodicalId":48429,"journal":{"name":"International Journal of Project Management","volume":"41 4","pages":"Article 102467"},"PeriodicalIF":7.4000,"publicationDate":"2023-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Mind the gap: Towards performance measurement beyond a plan-execute logic\",\"authors\":\"Harvey Maylor ,&nbsp;Joana Geraldi ,&nbsp;Alexander Budzier ,&nbsp;Neil Turner ,&nbsp;Mark Johnson\",\"doi\":\"10.1016/j.ijproman.2023.102467\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>Project performance measurement aims to identify deviations from intended goals and reduce ‘the gap’ between actual and expected performance. However, despite extensive measurement and control efforts, the gap is hard to close and, intriguingly, not necessarily related to the project's perceived performance, which is what will ultimately influence a stakeholder's satisfaction. Based on service quality research, this study explores the differences between perception and expectations of performance. Our mixed method study involving eighteen interviews and 85 survey responses in an IT-enabled change context shows that expectations and perceptions are fundamentally different concepts. As they are different, managing the gap between expectations and perceptions may be a nugatory task. The paper expands the literature on project performance measurement by questioning its foundations and offering a first step towards developing a more dynamic and subjective understanding of project performance that is consistent with a project's evolving nature.</p></div>\",\"PeriodicalId\":48429,\"journal\":{\"name\":\"International Journal of Project Management\",\"volume\":\"41 4\",\"pages\":\"Article 102467\"},\"PeriodicalIF\":7.4000,\"publicationDate\":\"2023-05-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Project Management\",\"FirstCategoryId\":\"91\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S0263786323000315\",\"RegionNum\":1,\"RegionCategory\":\"管理学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Project Management","FirstCategoryId":"91","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0263786323000315","RegionNum":1,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 4

摘要

项目绩效度量的目的是识别偏离预期目标的偏差,减少实际绩效与预期绩效之间的“差距”。然而,尽管进行了广泛的度量和控制工作,这个差距很难缩小,而且有趣的是,它不一定与项目的感知绩效相关,而感知绩效最终将影响涉众的满意度。本研究以服务品质研究为基础,探讨绩效感知与期望的差异。我们的混合方法研究涉及18个访谈和85个调查回复,在it支持的变化背景下,表明期望和感知是根本不同的概念。由于它们是不同的,管理期望和感知之间的差距可能是一项无用的任务。本文通过质疑项目绩效评估的基础,扩展了项目绩效评估的文献,并向发展对项目绩效更动态和主观的理解迈出了第一步,这与项目不断发展的本质是一致的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Mind the gap: Towards performance measurement beyond a plan-execute logic

Project performance measurement aims to identify deviations from intended goals and reduce ‘the gap’ between actual and expected performance. However, despite extensive measurement and control efforts, the gap is hard to close and, intriguingly, not necessarily related to the project's perceived performance, which is what will ultimately influence a stakeholder's satisfaction. Based on service quality research, this study explores the differences between perception and expectations of performance. Our mixed method study involving eighteen interviews and 85 survey responses in an IT-enabled change context shows that expectations and perceptions are fundamentally different concepts. As they are different, managing the gap between expectations and perceptions may be a nugatory task. The paper expands the literature on project performance measurement by questioning its foundations and offering a first step towards developing a more dynamic and subjective understanding of project performance that is consistent with a project's evolving nature.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
12.30
自引率
26.20%
发文量
83
审稿时长
59 days
期刊介绍: The International Journal of Project Management is recognized as a premier publication in the field of project management and organization studies. Our main objective is to contribute to the advancement of project management and project organizing through the publication of groundbreaking research. We are dedicated to presenting fresh insights and new knowledge in various domains, including project management, program management, portfolio management, project-oriented organizations, project networks, and project-oriented societies. We actively encourage submissions that explore project management and organizing from the perspectives of organizational behavior, strategy, supply chain management, technology, change management, innovation, and sustainability. By publishing high-quality research articles and reviews, we strive to revolutionize the academic landscape and propel the field of project management forward. We invite researchers, scholars, and practitioners to contribute to our journal and be a part of the progressive development in this exciting field.
期刊最新文献
Empowering project team to perform: Directive and facilitative antecedents When project outcomes matter: Organizational integration in managing long-term target benefits Struggling with strategizing in public client organisations: Managing strategic projects in inter-organisational contexts Projects as drivers of sustainability: How the adoption of the reuse principle affects the front-end of a construction project Dynamics of multi-level programme integration in a strategic programme: The case of the COVID-19 vaccination campaign in France
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1