实施公私伙伴关系的挑战:从交易成本角度看印度尼西亚废物转化能源项目

Azelia Machsari Haqq, Yohanna M. L. Gultom
{"title":"实施公私伙伴关系的挑战:从交易成本角度看印度尼西亚废物转化能源项目","authors":"Azelia Machsari Haqq, Yohanna M. L. Gultom","doi":"10.1108/jfmpc-09-2020-0058","DOIUrl":null,"url":null,"abstract":"\nPurpose\nThis study aims to explore the reasons behind the lengthy delays in completing a single public-private partnership (PPP) project in Indonesia and investigates how the transaction costs play a significant role in hindering the project’s success.\n\n\nDesign/methodology/approach\nTo broaden insight into the transaction cost theory, the authors used a single case study approach to provide a more in-depth analysis of a context whose complexity can be fully explored. As the primary data sources, 16 face-to-face semi-structured interviews were conducted with the stakeholders directly involved in the project’s initiation, design and execution.\n\n\nFindings\nThis case study demonstrates that transaction cost issues, both political and economic, play a significant role. This study has identified four main problems associated with transaction costs hindering project success, namely, executing agencies’ lack of knowledge and experience, lack of coordination for such a complex governance structure that links too many stakeholders and the financial and political risk that increase the uncertainty and public distrust.\n\n\nResearch limitations/implications\nThis study contributes mainly to the PPP and transaction costs economics literature, providing empirical evidence on why major PPP projects may fail to be procured. The Greater Bandung waste to energy (WTE) Project case demonstrates that transaction costs, both political and economic, have played a significant role in the lengthy delay of the PPP project.\n\n\nPractical implications\nAs the project involves many transaction cost issues, mapping the failure factors at the project sites can significantly contribute to the practitioners/stakeholders involved in the PPP WTE projects. Therefore, this study provides a lesson to the policymakers at all levels interested in PPPs to consider the issues of transaction costs related to the PPP projects. It can be used as guidance as well as a reference for future PPP WTE projects in Indonesia.\n\n\nSocial implications\nMapping the failure factors also signifying the response of the public in the PPP WTE projects undertaken. As the citizens become more rule-conscious and rights-conscious, they demand the opportunity to participate in creating rules and project plans. If the project failed to consult with affected communities and undermined democratic accountability, the angry citizens will confront the government to cancel the project. Therefore, political and economic influences for public attitude play significant roles in making the PPP WTE projects successful.\n\n\nOriginality/value\nThis study provides insight into the transaction cost issues that have hindered the completion of Indonesia’s PPP WTE project over the past 15 years. Additionally, the project feasibility analysis should include an understanding of transaction costs for partnering in PPP.\n","PeriodicalId":45720,"journal":{"name":"Journal of Financial Management of Property and Construction","volume":" ","pages":""},"PeriodicalIF":1.2000,"publicationDate":"2021-12-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"The challenge of implementing public-private partnerships: a transaction costs perspective on waste to energy projects in Indonesia\",\"authors\":\"Azelia Machsari Haqq, Yohanna M. L. Gultom\",\"doi\":\"10.1108/jfmpc-09-2020-0058\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\nPurpose\\nThis study aims to explore the reasons behind the lengthy delays in completing a single public-private partnership (PPP) project in Indonesia and investigates how the transaction costs play a significant role in hindering the project’s success.\\n\\n\\nDesign/methodology/approach\\nTo broaden insight into the transaction cost theory, the authors used a single case study approach to provide a more in-depth analysis of a context whose complexity can be fully explored. As the primary data sources, 16 face-to-face semi-structured interviews were conducted with the stakeholders directly involved in the project’s initiation, design and execution.\\n\\n\\nFindings\\nThis case study demonstrates that transaction cost issues, both political and economic, play a significant role. This study has identified four main problems associated with transaction costs hindering project success, namely, executing agencies’ lack of knowledge and experience, lack of coordination for such a complex governance structure that links too many stakeholders and the financial and political risk that increase the uncertainty and public distrust.\\n\\n\\nResearch limitations/implications\\nThis study contributes mainly to the PPP and transaction costs economics literature, providing empirical evidence on why major PPP projects may fail to be procured. The Greater Bandung waste to energy (WTE) Project case demonstrates that transaction costs, both political and economic, have played a significant role in the lengthy delay of the PPP project.\\n\\n\\nPractical implications\\nAs the project involves many transaction cost issues, mapping the failure factors at the project sites can significantly contribute to the practitioners/stakeholders involved in the PPP WTE projects. Therefore, this study provides a lesson to the policymakers at all levels interested in PPPs to consider the issues of transaction costs related to the PPP projects. It can be used as guidance as well as a reference for future PPP WTE projects in Indonesia.\\n\\n\\nSocial implications\\nMapping the failure factors also signifying the response of the public in the PPP WTE projects undertaken. As the citizens become more rule-conscious and rights-conscious, they demand the opportunity to participate in creating rules and project plans. If the project failed to consult with affected communities and undermined democratic accountability, the angry citizens will confront the government to cancel the project. Therefore, political and economic influences for public attitude play significant roles in making the PPP WTE projects successful.\\n\\n\\nOriginality/value\\nThis study provides insight into the transaction cost issues that have hindered the completion of Indonesia’s PPP WTE project over the past 15 years. Additionally, the project feasibility analysis should include an understanding of transaction costs for partnering in PPP.\\n\",\"PeriodicalId\":45720,\"journal\":{\"name\":\"Journal of Financial Management of Property and Construction\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":1.2000,\"publicationDate\":\"2021-12-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Financial Management of Property and Construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/jfmpc-09-2020-0058\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"BUSINESS, FINANCE\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Financial Management of Property and Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/jfmpc-09-2020-0058","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"BUSINESS, FINANCE","Score":null,"Total":0}
引用次数: 1

摘要

目的本研究旨在探讨印尼单个公私合作(PPP)项目长期延迟完成的原因,并调查交易成本如何在阻碍项目成功方面发挥重要作用。设计/方法论/方法为了拓宽对交易成本理论的理解,作者使用了单一案例研究方法,对其复杂性可以充分探索的背景进行了更深入的分析。作为主要数据来源,对直接参与项目启动、设计和执行的利益相关者进行了16次面对面的半结构化访谈。本案例研究表明,交易成本问题在政治和经济方面都发挥着重要作用。这项研究确定了与阻碍项目成功的交易成本相关的四个主要问题,即执行机构缺乏知识和经验,缺乏对如此复杂的治理结构的协调,这种治理结构将太多的利益相关者联系在一起,以及增加不确定性和公众不信任的金融和政治风险。研究局限性/含义本研究主要致力于PPP和交易成本经济学文献,为重大PPP项目可能无法采购提供了经验证据。大万隆垃圾焚烧发电项目的案例表明,政治和经济交易成本在PPP项目的长期拖延中发挥了重要作用。实际含义由于该项目涉及许多交易成本问题,绘制项目现场的失败因素可以为参与PPP WTE项目的从业者/利益相关者做出重大贡献。因此,本研究为对PPP感兴趣的各级决策者提供了一个教训,让他们考虑与PPP项目相关的交易成本问题。它可以作为印度尼西亚未来PPP WTE项目的指导和参考。绘制失败因素的社会含义也意味着公众对PPP WTE的反应。随着公民越来越有规则意识和权利意识,他们要求有机会参与制定规则和项目计划。如果该项目未能与受影响的社区协商并破坏民主问责制,愤怒的公民将与政府对抗,要求取消该项目。因此,公众态度的政治和经济影响对PPP WTE项目的成功起着重要作用。原创性/价值本研究深入了解了过去15年来阻碍印尼PPP WTE项目完成的交易成本问题。此外,项目可行性分析应包括对PPP合作交易成本的了解。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The challenge of implementing public-private partnerships: a transaction costs perspective on waste to energy projects in Indonesia
Purpose This study aims to explore the reasons behind the lengthy delays in completing a single public-private partnership (PPP) project in Indonesia and investigates how the transaction costs play a significant role in hindering the project’s success. Design/methodology/approach To broaden insight into the transaction cost theory, the authors used a single case study approach to provide a more in-depth analysis of a context whose complexity can be fully explored. As the primary data sources, 16 face-to-face semi-structured interviews were conducted with the stakeholders directly involved in the project’s initiation, design and execution. Findings This case study demonstrates that transaction cost issues, both political and economic, play a significant role. This study has identified four main problems associated with transaction costs hindering project success, namely, executing agencies’ lack of knowledge and experience, lack of coordination for such a complex governance structure that links too many stakeholders and the financial and political risk that increase the uncertainty and public distrust. Research limitations/implications This study contributes mainly to the PPP and transaction costs economics literature, providing empirical evidence on why major PPP projects may fail to be procured. The Greater Bandung waste to energy (WTE) Project case demonstrates that transaction costs, both political and economic, have played a significant role in the lengthy delay of the PPP project. Practical implications As the project involves many transaction cost issues, mapping the failure factors at the project sites can significantly contribute to the practitioners/stakeholders involved in the PPP WTE projects. Therefore, this study provides a lesson to the policymakers at all levels interested in PPPs to consider the issues of transaction costs related to the PPP projects. It can be used as guidance as well as a reference for future PPP WTE projects in Indonesia. Social implications Mapping the failure factors also signifying the response of the public in the PPP WTE projects undertaken. As the citizens become more rule-conscious and rights-conscious, they demand the opportunity to participate in creating rules and project plans. If the project failed to consult with affected communities and undermined democratic accountability, the angry citizens will confront the government to cancel the project. Therefore, political and economic influences for public attitude play significant roles in making the PPP WTE projects successful. Originality/value This study provides insight into the transaction cost issues that have hindered the completion of Indonesia’s PPP WTE project over the past 15 years. Additionally, the project feasibility analysis should include an understanding of transaction costs for partnering in PPP.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.70
自引率
0.00%
发文量
17
期刊最新文献
Managing supply chain disruptions in the construction industry: an institutional approach Assessing risk allocation preferences of partners in international construction joint venture projects in Ghana Impact of time-based delay on public-private partnership (PPP) construction project delivery: construction stakeholders’ perspective Drivers for the adoption of building information modelling (BIM) for post-construction management in the Nigerian AECO industry Risk assessment for 3D printing in construction projects
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1