英国私人项目中分包商对付款和估价实践的信任问题

T. Omotayo, Oskar Danvers-Watson, A. Oyegoke
{"title":"英国私人项目中分包商对付款和估价实践的信任问题","authors":"T. Omotayo, Oskar Danvers-Watson, A. Oyegoke","doi":"10.1108/jfmpc-07-2021-0048","DOIUrl":null,"url":null,"abstract":"\nPurpose\nConstruction project delivery is hinged on the performance of the contractor and subcontractors. In many private construction projects in the UK, there are trust issues between the subcontractor and contractor, especially when there are no collateral warranties to protect the rights of the subcontractors. The purpose of this study is to investigate and identify the causations of distrust between subcontractors and contractors and proffered panaceas.\n\n\nDesign/methodology/approach\nQualitative open-ended questions were used. Twenty respondents, mainly supervisors, tradesmen, subcontractors and main contractors in the UK, were interviewed. The thematic analysis approach was used to identify the dominant themes.\n\n\nFindings\nThe interview findings were presented descriptively, and the frequency approach identified more occurring themes from the interviewees’ responses. The six themes contributing to distrust between subcontractor and contractor are financial pressures, partnering approach, payment and trust, nature of trust, internal influence and unfair payment.\n\n\nPractical implications\nThe findings of this study revealed that many subcontractors have limited knowledge of the clauses in contracts they are entering into. Thus, in addition to obtaining collateral warranties, subcontractors must carefully understand their contractual obligations and payment arrangements before agreeing to be part of a construction project.\n\n\nOriginality/value\nAlthough this study aimed to shed light on the distrust between subcontractors and contractors in private UK construction projects, improvements in contract administration, subcontractors continued professional development and improved valuation processes can reduce distrust between subcontractors and contractors.\n","PeriodicalId":45720,"journal":{"name":"Journal of Financial Management of Property and Construction","volume":" ","pages":""},"PeriodicalIF":1.2000,"publicationDate":"2022-03-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Subcontractor trust issues on payment and valuation practices in UK private projects\",\"authors\":\"T. Omotayo, Oskar Danvers-Watson, A. Oyegoke\",\"doi\":\"10.1108/jfmpc-07-2021-0048\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\nPurpose\\nConstruction project delivery is hinged on the performance of the contractor and subcontractors. In many private construction projects in the UK, there are trust issues between the subcontractor and contractor, especially when there are no collateral warranties to protect the rights of the subcontractors. The purpose of this study is to investigate and identify the causations of distrust between subcontractors and contractors and proffered panaceas.\\n\\n\\nDesign/methodology/approach\\nQualitative open-ended questions were used. Twenty respondents, mainly supervisors, tradesmen, subcontractors and main contractors in the UK, were interviewed. The thematic analysis approach was used to identify the dominant themes.\\n\\n\\nFindings\\nThe interview findings were presented descriptively, and the frequency approach identified more occurring themes from the interviewees’ responses. The six themes contributing to distrust between subcontractor and contractor are financial pressures, partnering approach, payment and trust, nature of trust, internal influence and unfair payment.\\n\\n\\nPractical implications\\nThe findings of this study revealed that many subcontractors have limited knowledge of the clauses in contracts they are entering into. Thus, in addition to obtaining collateral warranties, subcontractors must carefully understand their contractual obligations and payment arrangements before agreeing to be part of a construction project.\\n\\n\\nOriginality/value\\nAlthough this study aimed to shed light on the distrust between subcontractors and contractors in private UK construction projects, improvements in contract administration, subcontractors continued professional development and improved valuation processes can reduce distrust between subcontractors and contractors.\\n\",\"PeriodicalId\":45720,\"journal\":{\"name\":\"Journal of Financial Management of Property and Construction\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":1.2000,\"publicationDate\":\"2022-03-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Financial Management of Property and Construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/jfmpc-07-2021-0048\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"BUSINESS, FINANCE\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Financial Management of Property and Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/jfmpc-07-2021-0048","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"BUSINESS, FINANCE","Score":null,"Total":0}
引用次数: 1

摘要

目的施工项目的交付取决于承包商和分包商的表现。在英国的许多私人建筑项目中,分包商和承包商之间存在信任问题,尤其是在没有担保来保护分包商权利的情况下。本研究的目的是调查和确定分包商和承包商之间以及所提供的灵丹妙药之间不信任的原因。设计/方法/方法采用定性开放式问题。20名受访者接受了采访,他们主要是英国的监管人员、商人、分包商和主要承包商。采用专题分析方法来确定主要主题。调查结果访谈结果是描述性的,频率法从受访者的回答中确定了更多发生的主题。导致分包商和承包商之间不信任的六个主题是财务压力、合作方式、付款和信任、信任的性质、内部影响和不公平付款。实际含义这项研究的结果表明,许多分包商对他们签订的合同中的条款了解有限。因此,除了获得附带担保外,分包商在同意参与建设项目之前,还必须仔细了解其合同义务和付款安排。独创性/价值尽管这项研究旨在揭示英国私人建筑项目中分包商和承包商之间的不信任,但合同管理的改进、分包商的持续专业发展和评估流程的改进可以减少分包商与承包商之间的信任。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Subcontractor trust issues on payment and valuation practices in UK private projects
Purpose Construction project delivery is hinged on the performance of the contractor and subcontractors. In many private construction projects in the UK, there are trust issues between the subcontractor and contractor, especially when there are no collateral warranties to protect the rights of the subcontractors. The purpose of this study is to investigate and identify the causations of distrust between subcontractors and contractors and proffered panaceas. Design/methodology/approach Qualitative open-ended questions were used. Twenty respondents, mainly supervisors, tradesmen, subcontractors and main contractors in the UK, were interviewed. The thematic analysis approach was used to identify the dominant themes. Findings The interview findings were presented descriptively, and the frequency approach identified more occurring themes from the interviewees’ responses. The six themes contributing to distrust between subcontractor and contractor are financial pressures, partnering approach, payment and trust, nature of trust, internal influence and unfair payment. Practical implications The findings of this study revealed that many subcontractors have limited knowledge of the clauses in contracts they are entering into. Thus, in addition to obtaining collateral warranties, subcontractors must carefully understand their contractual obligations and payment arrangements before agreeing to be part of a construction project. Originality/value Although this study aimed to shed light on the distrust between subcontractors and contractors in private UK construction projects, improvements in contract administration, subcontractors continued professional development and improved valuation processes can reduce distrust between subcontractors and contractors.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.70
自引率
0.00%
发文量
17
期刊最新文献
Managing supply chain disruptions in the construction industry: an institutional approach Assessing risk allocation preferences of partners in international construction joint venture projects in Ghana Impact of time-based delay on public-private partnership (PPP) construction project delivery: construction stakeholders’ perspective Drivers for the adoption of building information modelling (BIM) for post-construction management in the Nigerian AECO industry Risk assessment for 3D printing in construction projects
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1