通过解决建筑生产管理的缺口来提高建筑施工企业的绩效:一种新的生产模式方法

Q2 Business, Management and Accounting Journal of Engineering Project and Production Management Pub Date : 2020-01-01 DOI:10.2478/jeppm-2020-0007
I. Osuizugbo
{"title":"通过解决建筑生产管理的缺口来提高建筑施工企业的绩效:一种新的生产模式方法","authors":"I. Osuizugbo","doi":"10.2478/jeppm-2020-0007","DOIUrl":null,"url":null,"abstract":"Abstract Gap of building production management (BPM) is a serious issue that influences project success and building construction firms’ (BCFs) performance. Hence, the call for BCFs performance improvement using a new production model approach is a necessity. The aim of this study is to investigate the role of the new production model concept as a method for enhancing the performance of BCFs through addressing the gap of BPM in Nigeria. To attain this aim, a research procedure was designed to achieve two objectives which include: (i) exploring the nature of Nigerian construction industry, gap of BPM and new production model concept; (ii) investigating the awareness and application of the new production model concept as a method for enhancing the performance of BCFs in the study area. To accomplish the aforementioned aim, a research method comprised of a literature review and questionnaire surveys was designed to address the objectives. The study identified unproductive/ineffective BPM, lack of buildability and maintainability analysis, professionalism mismatch, and unauthorized practices as the gap of BPM. This study revealed that the gap of BPM is the main reason behind building failures/collapses, bad debts, low productivity, low level of clients satisfaction, high labour turnovers, and barriers to economic fortune. The study also revealed poor cash flow, lack of experience in the construction field, unprofessionalism and a high number of unskilled employees in a company, lack of co-operation from subcontractors and suppliers and poor labour relations, as the top five causes of BPM gap. BCFs in Nigeria have adopted several approaches to arrest these issues, but the challenges still occur. Thus, the new production model concept that has not been well adopted by construction firms in Nigeria, and which emphasizes on-site production, and aims at enhancing production management is a key to tackling these issues. Based on the survey findings, the study recommended that the issue of the gap of BPM must be correctly identified and clearly understood so as to enable BCFs to bridge the production management gap which will influence their performance positively.","PeriodicalId":53274,"journal":{"name":"Journal of Engineering Project and Production Management","volume":"10 1","pages":"50 - 63"},"PeriodicalIF":0.0000,"publicationDate":"2020-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"16","resultStr":"{\"title\":\"Improving the Performance of Building Construction Firms through Addressing the Gap of Building Production Management: A New Production Model Approach\",\"authors\":\"I. Osuizugbo\",\"doi\":\"10.2478/jeppm-2020-0007\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract Gap of building production management (BPM) is a serious issue that influences project success and building construction firms’ (BCFs) performance. Hence, the call for BCFs performance improvement using a new production model approach is a necessity. The aim of this study is to investigate the role of the new production model concept as a method for enhancing the performance of BCFs through addressing the gap of BPM in Nigeria. To attain this aim, a research procedure was designed to achieve two objectives which include: (i) exploring the nature of Nigerian construction industry, gap of BPM and new production model concept; (ii) investigating the awareness and application of the new production model concept as a method for enhancing the performance of BCFs in the study area. To accomplish the aforementioned aim, a research method comprised of a literature review and questionnaire surveys was designed to address the objectives. The study identified unproductive/ineffective BPM, lack of buildability and maintainability analysis, professionalism mismatch, and unauthorized practices as the gap of BPM. This study revealed that the gap of BPM is the main reason behind building failures/collapses, bad debts, low productivity, low level of clients satisfaction, high labour turnovers, and barriers to economic fortune. The study also revealed poor cash flow, lack of experience in the construction field, unprofessionalism and a high number of unskilled employees in a company, lack of co-operation from subcontractors and suppliers and poor labour relations, as the top five causes of BPM gap. BCFs in Nigeria have adopted several approaches to arrest these issues, but the challenges still occur. Thus, the new production model concept that has not been well adopted by construction firms in Nigeria, and which emphasizes on-site production, and aims at enhancing production management is a key to tackling these issues. Based on the survey findings, the study recommended that the issue of the gap of BPM must be correctly identified and clearly understood so as to enable BCFs to bridge the production management gap which will influence their performance positively.\",\"PeriodicalId\":53274,\"journal\":{\"name\":\"Journal of Engineering Project and Production Management\",\"volume\":\"10 1\",\"pages\":\"50 - 63\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"16\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Engineering Project and Production Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/jeppm-2020-0007\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Business, Management and Accounting\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering Project and Production Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/jeppm-2020-0007","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Business, Management and Accounting","Score":null,"Total":0}
引用次数: 16

摘要

摘要建筑生产管理差距是影响项目成功与建筑施工企业绩效的一个严重问题。因此,有必要使用新的生产模型方法来提高BCF的性能。本研究的目的是调查新的生产模式概念作为一种方法的作用,通过解决尼日利亚BPM的差距来提高BCF的性能。为了实现这一目标,设计了一个研究程序来实现两个目标,其中包括:(i)探索尼日利亚建筑业的性质、BPM的差距和新的生产模式概念;(ii)调查对新生产模式概念的认识和应用,以此作为提高BCF在研究领域表现的一种方法。为了实现上述目标,设计了一种由文献综述和问卷调查组成的研究方法来解决这些目标。该研究确定,非生产性/无效的BPM、缺乏可构建性和可维护性分析、专业性不匹配以及未经授权的实践是BPM的差距。这项研究表明,BPM的差距是建筑故障/倒塌、坏账、生产率低、客户满意度低、劳动力流失率高和经济财富障碍背后的主要原因。该研究还显示,现金流不佳、缺乏建筑领域的经验、公司不专业和大量非技术员工、分包商和供应商缺乏合作以及劳资关系不佳是BPM差距的五大原因。尼日利亚的BCF已经采取了几种方法来解决这些问题,但挑战仍然存在。因此,尼日利亚建筑公司尚未很好地采用新的生产模式概念,该概念强调现场生产,旨在加强生产管理,这是解决这些问题的关键。根据调查结果,该研究建议,必须正确识别和清楚地理解BPM的差距问题,以使BCF能够弥合生产管理差距,这将对其绩效产生积极影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Improving the Performance of Building Construction Firms through Addressing the Gap of Building Production Management: A New Production Model Approach
Abstract Gap of building production management (BPM) is a serious issue that influences project success and building construction firms’ (BCFs) performance. Hence, the call for BCFs performance improvement using a new production model approach is a necessity. The aim of this study is to investigate the role of the new production model concept as a method for enhancing the performance of BCFs through addressing the gap of BPM in Nigeria. To attain this aim, a research procedure was designed to achieve two objectives which include: (i) exploring the nature of Nigerian construction industry, gap of BPM and new production model concept; (ii) investigating the awareness and application of the new production model concept as a method for enhancing the performance of BCFs in the study area. To accomplish the aforementioned aim, a research method comprised of a literature review and questionnaire surveys was designed to address the objectives. The study identified unproductive/ineffective BPM, lack of buildability and maintainability analysis, professionalism mismatch, and unauthorized practices as the gap of BPM. This study revealed that the gap of BPM is the main reason behind building failures/collapses, bad debts, low productivity, low level of clients satisfaction, high labour turnovers, and barriers to economic fortune. The study also revealed poor cash flow, lack of experience in the construction field, unprofessionalism and a high number of unskilled employees in a company, lack of co-operation from subcontractors and suppliers and poor labour relations, as the top five causes of BPM gap. BCFs in Nigeria have adopted several approaches to arrest these issues, but the challenges still occur. Thus, the new production model concept that has not been well adopted by construction firms in Nigeria, and which emphasizes on-site production, and aims at enhancing production management is a key to tackling these issues. Based on the survey findings, the study recommended that the issue of the gap of BPM must be correctly identified and clearly understood so as to enable BCFs to bridge the production management gap which will influence their performance positively.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Engineering Project and Production Management
Journal of Engineering Project and Production Management Business, Management and Accounting-Business, Management and Accounting (miscellaneous)
CiteScore
2.30
自引率
0.00%
发文量
24
审稿时长
30 weeks
期刊最新文献
Condition-based Maintenance Using BIM: A Case Study of Energy Modeling for a Residential Building Comparative Evaluation of Road Safety Level and Geometric Design Consistency Digitalization and Engineering Management for the Next-Era Industries Pandemic Effect on the Industry 4.0 Readiness: A Case Study in Vietnamese Industry Internet of Things (IoT) Impact on Facility Management of Office Buildings: A Qualitative Study
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1