Mohammad Ghasemi, R. Chakrabortty, R. Shahabi-Shahmiri, S. Mirnezami
{"title":"求解多技能多模式资源约束项目调度问题的一种带有可信度度量的机会约束规划方法","authors":"Mohammad Ghasemi, R. Chakrabortty, R. Shahabi-Shahmiri, S. Mirnezami","doi":"10.1080/15623599.2023.2252255","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":47375,"journal":{"name":"International Journal of Construction Management","volume":" ","pages":""},"PeriodicalIF":3.4000,"publicationDate":"2023-09-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A chance-constrained programming method with credibility measure for solving the multi-skill multi-mode resource-constrained project scheduling problem\",\"authors\":\"Mohammad Ghasemi, R. Chakrabortty, R. Shahabi-Shahmiri, S. Mirnezami\",\"doi\":\"10.1080/15623599.2023.2252255\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":47375,\"journal\":{\"name\":\"International Journal of Construction Management\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":3.4000,\"publicationDate\":\"2023-09-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Construction Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/15623599.2023.2252255\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Construction Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/15623599.2023.2252255","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
A chance-constrained programming method with credibility measure for solving the multi-skill multi-mode resource-constrained project scheduling problem
期刊介绍:
The International Journal of Construction Management publishes quality papers aiming to advance the knowledge of construction management. The Journal is devoted to the publication of original research including, but not limited to the following: Sustainable Construction (Green building; Carbon emission; Waste management; Energy saving) Construction life cycle management Construction informatics (Building information modelling; Information communication technology; Virtual design and construction) Smart construction (Robotics; Artificial intelligence; 3D printing) Big data for construction Legal issues in construction Public policies for construction Building and Infrastructures Health, safety and well-being in construction Risk management in construction Disaster management and resilience Construction procurement Construction management education