{"title":"基于考虑负荷优先级的机组调度优化配电系统服务恢复","authors":"Shinya Sekizaki, Teruyuki Kato, Ichiro Nishizaki, Tomohiro Hayashida, Kazuhisa Hikoyama, Tomoaki Nonoyama","doi":"10.1002/eej.23442","DOIUrl":null,"url":null,"abstract":"<p>The service restoration to sound sections within a short period as much as possible, performed after the permanent fault occurs in a distribution system, is significant for maintaining power supply reliability. This paper proposes an efficient method to find service restoration procedures based on fault searching and the optimal work scheduling of crews, considering the power supply priorities of loads and the probability of occurrence of faults. The proposed method is composed of two-stage problems to reduce the outage sections efficiently: (i) the problem to find a series of searching procedures for unknown fault locations in the first stage and (ii) the optimization problem of work schedules of crews in the second stage. In the first stage, the order of operation of switches opened for searching for the fault direction is determined, constituting the searching tree. After that, the proposed optimization method can efficiently solve the work scheduling problem by formulating it as a mixed-integer linear programming problem in the second stage. The computational experiments using a large-scale distribution system model with many remote and manual switches show that the proposed method can provide efficient service restoration procedures within a reasonable computational time.</p>","PeriodicalId":50550,"journal":{"name":"Electrical Engineering in Japan","volume":"216 3","pages":""},"PeriodicalIF":0.4000,"publicationDate":"2023-08-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Optimizing service restoration in distribution systems based on scheduling of crews considering priorities of loads\",\"authors\":\"Shinya Sekizaki, Teruyuki Kato, Ichiro Nishizaki, Tomohiro Hayashida, Kazuhisa Hikoyama, Tomoaki Nonoyama\",\"doi\":\"10.1002/eej.23442\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p>The service restoration to sound sections within a short period as much as possible, performed after the permanent fault occurs in a distribution system, is significant for maintaining power supply reliability. This paper proposes an efficient method to find service restoration procedures based on fault searching and the optimal work scheduling of crews, considering the power supply priorities of loads and the probability of occurrence of faults. The proposed method is composed of two-stage problems to reduce the outage sections efficiently: (i) the problem to find a series of searching procedures for unknown fault locations in the first stage and (ii) the optimization problem of work schedules of crews in the second stage. In the first stage, the order of operation of switches opened for searching for the fault direction is determined, constituting the searching tree. After that, the proposed optimization method can efficiently solve the work scheduling problem by formulating it as a mixed-integer linear programming problem in the second stage. The computational experiments using a large-scale distribution system model with many remote and manual switches show that the proposed method can provide efficient service restoration procedures within a reasonable computational time.</p>\",\"PeriodicalId\":50550,\"journal\":{\"name\":\"Electrical Engineering in Japan\",\"volume\":\"216 3\",\"pages\":\"\"},\"PeriodicalIF\":0.4000,\"publicationDate\":\"2023-08-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Electrical Engineering in Japan\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://onlinelibrary.wiley.com/doi/10.1002/eej.23442\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, ELECTRICAL & ELECTRONIC\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Electrical Engineering in Japan","FirstCategoryId":"5","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1002/eej.23442","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, ELECTRICAL & ELECTRONIC","Score":null,"Total":0}
Optimizing service restoration in distribution systems based on scheduling of crews considering priorities of loads
The service restoration to sound sections within a short period as much as possible, performed after the permanent fault occurs in a distribution system, is significant for maintaining power supply reliability. This paper proposes an efficient method to find service restoration procedures based on fault searching and the optimal work scheduling of crews, considering the power supply priorities of loads and the probability of occurrence of faults. The proposed method is composed of two-stage problems to reduce the outage sections efficiently: (i) the problem to find a series of searching procedures for unknown fault locations in the first stage and (ii) the optimization problem of work schedules of crews in the second stage. In the first stage, the order of operation of switches opened for searching for the fault direction is determined, constituting the searching tree. After that, the proposed optimization method can efficiently solve the work scheduling problem by formulating it as a mixed-integer linear programming problem in the second stage. The computational experiments using a large-scale distribution system model with many remote and manual switches show that the proposed method can provide efficient service restoration procedures within a reasonable computational time.
期刊介绍:
Electrical Engineering in Japan (EEJ) is an official journal of the Institute of Electrical Engineers of Japan (IEEJ). This authoritative journal is a translation of the Transactions of the Institute of Electrical Engineers of Japan. It publishes 16 issues a year on original research findings in Electrical Engineering with special focus on the science, technology and applications of electric power, such as power generation, transmission and conversion, electric railways (including magnetic levitation devices), motors, switching, power economics.