{"title":"戈柳宾卡岩溶泉流量水文图的水力水文综合","authors":"Vedran Ivezić","doi":"10.14256/jce.2160.2017","DOIUrl":null,"url":null,"abstract":"The hydraulic-hydrology analysis and discharge hydrograph results for the Golubinka karst spring are presented for the period from 7 September 2012 to 1 October 2013. The objective was to gain insight into processes occurring in the Golubinka spring drainage area, in terms of quantities of discharge, groundwater levels, and seepage within the karst aquifer, as related to the precipitation measured during the analysed period. An appropriate coefficient of turbulent seepage through karst channels in the analysed aquifer was determined based on two approaches. This coefficient can subsequently be used in numerical modelling.","PeriodicalId":50415,"journal":{"name":"Gradevinar","volume":"1 1","pages":""},"PeriodicalIF":1.0000,"publicationDate":"2018-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Hydraulic-hydrology synthesis of Golubinka karst spring discharge hydrograph\",\"authors\":\"Vedran Ivezić\",\"doi\":\"10.14256/jce.2160.2017\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The hydraulic-hydrology analysis and discharge hydrograph results for the Golubinka karst spring are presented for the period from 7 September 2012 to 1 October 2013. The objective was to gain insight into processes occurring in the Golubinka spring drainage area, in terms of quantities of discharge, groundwater levels, and seepage within the karst aquifer, as related to the precipitation measured during the analysed period. An appropriate coefficient of turbulent seepage through karst channels in the analysed aquifer was determined based on two approaches. This coefficient can subsequently be used in numerical modelling.\",\"PeriodicalId\":50415,\"journal\":{\"name\":\"Gradevinar\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":1.0000,\"publicationDate\":\"2018-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Gradevinar\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.14256/jce.2160.2017\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Gradevinar","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.14256/jce.2160.2017","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

摘要

本文介绍了戈柳宾卡岩溶泉2012年9月7日至2013年10月1日的水力水文分析和流量水文图结果。目的是深入了解戈卢宾卡泉流域发生的过程,包括流量、地下水位和喀斯特含水层内的渗漏情况,以及与分析期间测量的降水有关的情况。采用两种方法确定了所分析含水层中岩溶通道湍流渗流的适宜系数。该系数随后可用于数值模拟。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Hydraulic-hydrology synthesis of Golubinka karst spring discharge hydrograph
The hydraulic-hydrology analysis and discharge hydrograph results for the Golubinka karst spring are presented for the period from 7 September 2012 to 1 October 2013. The objective was to gain insight into processes occurring in the Golubinka spring drainage area, in terms of quantities of discharge, groundwater levels, and seepage within the karst aquifer, as related to the precipitation measured during the analysed period. An appropriate coefficient of turbulent seepage through karst channels in the analysed aquifer was determined based on two approaches. This coefficient can subsequently be used in numerical modelling.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Gradevinar
Gradevinar ENGINEERING, CIVIL-
CiteScore
1.70
自引率
18.20%
发文量
56
审稿时长
6-12 weeks
期刊介绍: Information not localized
期刊最新文献
Quasi-static tests on RC building columns strengthened with CFRP Construction of a new day hospital in Zadar using recycled aggregate concrete Damage assessment of water supply networks due to seismic events using vulnerability functions Centrifugally-cast concrete poles with non-metallic reinforcement Overview of research on fire effects in RC elements and assessment of RC structures after fire
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1