明确沥青铺装过程——提高质量的根本步骤

IF 1 4区 工程技术 Q4 ENGINEERING, CIVIL Gradevinar Pub Date : 2020-12-01 DOI:10.14256/jce.2427.2018
S. Lakušić
{"title":"明确沥青铺装过程——提高质量的根本步骤","authors":"S. Lakušić","doi":"10.14256/jce.2427.2018","DOIUrl":null,"url":null,"abstract":"The objective of the paper is to make explicit the paving operations, the related asphalt temperature and density data, and the logistic process, as a fundamental step to identify improvement opportunities. For that, temperature data, roller compactor trajectories, asphalt density, paver speed, and trucks logistics, were collected. The results, analysis, and feedback received, point to specific opportunities for improvement, including avoiding the paver start-stop cycles, uniform compaction of the entire pavement surface, and definition of roller compaction strategy.","PeriodicalId":50415,"journal":{"name":"Gradevinar","volume":null,"pages":null},"PeriodicalIF":1.0000,"publicationDate":"2020-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Making the asphalt paving process explicit - A fundamental step for quality improvement\",\"authors\":\"S. Lakušić\",\"doi\":\"10.14256/jce.2427.2018\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The objective of the paper is to make explicit the paving operations, the related asphalt temperature and density data, and the logistic process, as a fundamental step to identify improvement opportunities. For that, temperature data, roller compactor trajectories, asphalt density, paver speed, and trucks logistics, were collected. The results, analysis, and feedback received, point to specific opportunities for improvement, including avoiding the paver start-stop cycles, uniform compaction of the entire pavement surface, and definition of roller compaction strategy.\",\"PeriodicalId\":50415,\"journal\":{\"name\":\"Gradevinar\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.0000,\"publicationDate\":\"2020-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Gradevinar\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.14256/jce.2427.2018\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Gradevinar","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.14256/jce.2427.2018","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 2

摘要

本文的目的是明确铺装操作,相关沥青温度和密度数据,以及物流过程,作为确定改进机会的基本步骤。为此,收集了温度数据、压路机轨迹、沥青密度、摊铺机速度和卡车物流数据。结果、分析和收到的反馈指出了具体的改进机会,包括避免摊铺机启停循环,整个路面的均匀压实,以及确定压路机压实策略。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Making the asphalt paving process explicit - A fundamental step for quality improvement
The objective of the paper is to make explicit the paving operations, the related asphalt temperature and density data, and the logistic process, as a fundamental step to identify improvement opportunities. For that, temperature data, roller compactor trajectories, asphalt density, paver speed, and trucks logistics, were collected. The results, analysis, and feedback received, point to specific opportunities for improvement, including avoiding the paver start-stop cycles, uniform compaction of the entire pavement surface, and definition of roller compaction strategy.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Gradevinar
Gradevinar ENGINEERING, CIVIL-
CiteScore
1.70
自引率
18.20%
发文量
56
审稿时长
6-12 weeks
期刊介绍: Information not localized
期刊最新文献
Quasi-static tests on RC building columns strengthened with CFRP Construction of a new day hospital in Zadar using recycled aggregate concrete Damage assessment of water supply networks due to seismic events using vulnerability functions Centrifugally-cast concrete poles with non-metallic reinforcement Overview of research on fire effects in RC elements and assessment of RC structures after fire
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1