静布置对上行车道混凝土拱桥应力和变形状态的影响

IF 0.1 Q4 ENGINEERING, CIVIL Romanian Journal of Transport Infrastructure Pub Date : 2016-12-01 DOI:10.1515/rjti-2016-0049
I. Vlad, C. Chiotan
{"title":"静布置对上行车道混凝土拱桥应力和变形状态的影响","authors":"I. Vlad, C. Chiotan","doi":"10.1515/rjti-2016-0049","DOIUrl":null,"url":null,"abstract":"Abstract Arch bridges were the first constructions with considerable spans built by man, due to the materials and technologies available at that time. Afterwards, these works of art have diversified and are now solutions used in countless situations, especially when crossing deep valleys. Both their economic and architectonic aspects are hard to combat and have led to selecting this type of structure for more and more locations. The paper will contain a brief presentation of some aspects regarding upper path concrete arch bridges composition and design methods. Also, it will have a case study regarding structural stresses over the different construction stages, and for several support hypotheses. The case study will reflect the Crivadia viaduct, situated on DN 66, at km 150+672. The bridge has a main span of 59.20m and an overall height of 15.00m, serving a 7.80m wide carriageway and two 2.20m wide footways. It has a total length of 107.60m. Based on the results of the case study, conclusions will be drawn regarding stress variation over the construction stages and under different support hypothesis, comparing these with the initial results.","PeriodicalId":40630,"journal":{"name":"Romanian Journal of Transport Infrastructure","volume":null,"pages":null},"PeriodicalIF":0.1000,"publicationDate":"2016-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1515/rjti-2016-0049","citationCount":"0","resultStr":"{\"title\":\"The Influence of The Static Layout on The Stress and Deformation State for Concrete Arched Bridges with Upper Carriageway\",\"authors\":\"I. Vlad, C. Chiotan\",\"doi\":\"10.1515/rjti-2016-0049\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract Arch bridges were the first constructions with considerable spans built by man, due to the materials and technologies available at that time. Afterwards, these works of art have diversified and are now solutions used in countless situations, especially when crossing deep valleys. Both their economic and architectonic aspects are hard to combat and have led to selecting this type of structure for more and more locations. The paper will contain a brief presentation of some aspects regarding upper path concrete arch bridges composition and design methods. Also, it will have a case study regarding structural stresses over the different construction stages, and for several support hypotheses. The case study will reflect the Crivadia viaduct, situated on DN 66, at km 150+672. The bridge has a main span of 59.20m and an overall height of 15.00m, serving a 7.80m wide carriageway and two 2.20m wide footways. It has a total length of 107.60m. Based on the results of the case study, conclusions will be drawn regarding stress variation over the construction stages and under different support hypothesis, comparing these with the initial results.\",\"PeriodicalId\":40630,\"journal\":{\"name\":\"Romanian Journal of Transport Infrastructure\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.1000,\"publicationDate\":\"2016-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1515/rjti-2016-0049\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Romanian Journal of Transport Infrastructure\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1515/rjti-2016-0049\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Romanian Journal of Transport Infrastructure","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1515/rjti-2016-0049","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

摘要

由于当时的材料和技术条件,拱桥是最早由人类建造的具有相当跨度的建筑。后来,这些艺术作品变得多样化,现在已经成为无数情况下的解决方案,特别是在穿越深谷时。它们的经济和建筑方面都很难与之抗衡,并导致越来越多的地方选择这种类型的结构。本文将简要介绍上径混凝土拱桥的组成和设计方法。此外,它将有一个关于不同施工阶段的结构应力的案例研究,以及几个支持假设。该案例研究将反映位于DN 66的Crivadia高架桥,位于150+672公里处。该桥主跨59.20米,总高15.00米,有一条7.80米宽的行车道和两条2.2米宽的人行车道。它的全长为107.60米。根据案例分析的结果,得出施工阶段和不同支持假设下的应力变化情况,并与初步结果进行比较。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The Influence of The Static Layout on The Stress and Deformation State for Concrete Arched Bridges with Upper Carriageway
Abstract Arch bridges were the first constructions with considerable spans built by man, due to the materials and technologies available at that time. Afterwards, these works of art have diversified and are now solutions used in countless situations, especially when crossing deep valleys. Both their economic and architectonic aspects are hard to combat and have led to selecting this type of structure for more and more locations. The paper will contain a brief presentation of some aspects regarding upper path concrete arch bridges composition and design methods. Also, it will have a case study regarding structural stresses over the different construction stages, and for several support hypotheses. The case study will reflect the Crivadia viaduct, situated on DN 66, at km 150+672. The bridge has a main span of 59.20m and an overall height of 15.00m, serving a 7.80m wide carriageway and two 2.20m wide footways. It has a total length of 107.60m. Based on the results of the case study, conclusions will be drawn regarding stress variation over the construction stages and under different support hypothesis, comparing these with the initial results.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
6
审稿时长
10 weeks
期刊最新文献
The influence of the introduction of an artificial neural network for traffic signal control Impact of remittances on exports and economic growth: a cross country analysis The influence of the introduction of public transportation lanes in the municipality of Bucharest A Moderation effect of atmospheric conditions on PM2.5 traffic related concentration Impact of expansion joints on noise pollution, case study in Cluj-Napoca
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1